JOINT INSPECTION REPORT
DATE
16.11.2015
‘CONTRACTOR ‘MANUFACTURER:
MIS L&T CONSTRUCTION M/S HMM INFRA LTD. AMBALA
CONTRACT REFERENCE PURCHASING AUTHORITY CONSIGNEE
LeT/HCIC/PROC/HO/oRS 07.22.07.15 M/S L&T CONSTRUCTION ure
DESCRIPTION OF STORES DRAWING NO. QAP No.
PROJECT Construction of elevated viaduct contract, elevated
ramp & Elevated stations-LKCC 0, Lucknow
59.80 steal tuss span
‘HS-08-2015-2171 R2
ITP No. sun isn001 REV,
‘SPECIFICATION NO.
15 2062-2011 FE-S40 E410 Gr-0R
NO: 00
DATED: 01-08-2015
|TYPE OF INSPECTIONTTEST CONDUCTED:
\VISUALIPHYSICALICHEMICALIMETROLOGICALIELECTRICAL|
DIMENSIONALINDTSIPERFORMANCE TEST/ ANY OTHER|
Sr.No. | QAPCheckpoints
Details if inspection conducted Result ay.
Remarks
Raw materials avaliable in workshop,
Incoming Raw Material] Material test certificates are reviewed
and found as per specification
Confirms,
252 Mr
Material Test Certifoate
attached
|Rorvarks" Above raw material is Cleared for fabrication process
A we
Pr Ty 5 a
; ana Tyg
RS. Mali
Asst. Manager Engineer
HMM infra
i Ler Ler
i
PC Shrivastava
SSE.
umec