You are on page 1of 1
JOINT INSPECTION REPORT DATE 16.11.2015 ‘CONTRACTOR ‘MANUFACTURER: MIS L&T CONSTRUCTION M/S HMM INFRA LTD. AMBALA CONTRACT REFERENCE PURCHASING AUTHORITY CONSIGNEE LeT/HCIC/PROC/HO/oRS 07.22.07.15 M/S L&T CONSTRUCTION ure DESCRIPTION OF STORES DRAWING NO. QAP No. PROJECT Construction of elevated viaduct contract, elevated ramp & Elevated stations-LKCC 0, Lucknow 59.80 steal tuss span ‘HS-08-2015-2171 R2 ITP No. sun isn001 REV, ‘SPECIFICATION NO. 15 2062-2011 FE-S40 E410 Gr-0R NO: 00 DATED: 01-08-2015 |TYPE OF INSPECTIONTTEST CONDUCTED: \VISUALIPHYSICALICHEMICALIMETROLOGICALIELECTRICAL| DIMENSIONALINDTSIPERFORMANCE TEST/ ANY OTHER| Sr.No. | QAPCheckpoints Details if inspection conducted Result ay. Remarks Raw materials avaliable in workshop, Incoming Raw Material] Material test certificates are reviewed and found as per specification Confirms, 252 Mr Material Test Certifoate attached |Rorvarks" Above raw material is Cleared for fabrication process A we Pr Ty 5 a ; ana Tyg RS. Mali Asst. Manager Engineer HMM infra i Ler Ler i PC Shrivastava SSE. umec

You might also like