CLEARANCE REPORT
INSPECTION
SETS pate
36.12.2015
‘CONTRACTOR | (MANUFACTURER
{JS NAVAYUGA ENGINEERING CO. [M/S Hi INFRA LTO. ANIBALA
‘CONTRACT REFERENCE PURCHASING AUTHORITY ‘CONSIGNEE
Nec/KoL/seK/01/2013 Dated - 09/05/2023 [M/S HAVAYUGA ENGINEERING CO, [W/SNAVAYUGA ENGINEERING CO.
‘DRAWING NOs. ‘axe No.
DESCRIPTION OF STORES
BANIBALSECTION OF NH-3A
DING 2 TUNNELS [2LANE)
SIN STATE OF JAMMU
FOUR Leung oF aUAZIGUND TO
ont km 133.350 TO Km 208 700 INCL
nDeR HOF PHASE HON BOTISMUt
was/6o01 Rev.NO00
ATED: 0667-2018
nots casein, VAGUCT FROM CH198236.6850 TO 195823 6850 snopes TRE
(p35R 368) .
[ee or MaPECTION TEST CONDUCTED: “TUR PY STERL CHE MICS AETROLOGTCALT ELECTRIC
DIMENSIONAL/ NOTS/ PERFORMANCE TEST/ ANY OTHE
[conoewcH Jan for
sr.No, [Rguirements etal if inspection Tests Conducted result hich stage Remarks
forest in cleared
ra ere Paracs aay | Shanon | Saar ie dinensart pers
jensionalAcEUaEY Part lse a cont eee
: Vielduae wala, ak Tagen | Welding & NDT reports
welaing inspection tert checked eaten sttaches
‘ial asembiy of srdars shown with required
Fina Assembly ox spa “ial Assembly Report
3 slope, camber, ovetalllength,ske, Hole fimess | Confirms
Inspection ger wise. been a atached
Sa cared To orher aorta preparation, painting & despatch
[Remarks ABD
1 at above mfg Stage/CHP of QAP material is ceared for ft
eis certs that based onthe inspacion/tests conducts ser processing
(ye A\, 7
ss
wal din
5-H
{2c Hn NERA LTO. NEC.