You are on page 1of 1
CLEARANCE REPORT INSPECTION SETS pate 36.12.2015 ‘CONTRACTOR | (MANUFACTURER {JS NAVAYUGA ENGINEERING CO. [M/S Hi INFRA LTO. ANIBALA ‘CONTRACT REFERENCE PURCHASING AUTHORITY ‘CONSIGNEE Nec/KoL/seK/01/2013 Dated - 09/05/2023 [M/S HAVAYUGA ENGINEERING CO, [W/SNAVAYUGA ENGINEERING CO. ‘DRAWING NOs. ‘axe No. DESCRIPTION OF STORES BANIBALSECTION OF NH-3A DING 2 TUNNELS [2LANE) SIN STATE OF JAMMU FOUR Leung oF aUAZIGUND TO ont km 133.350 TO Km 208 700 INCL nDeR HOF PHASE HON BOTISMUt was/6o01 Rev.NO00 ATED: 0667-2018 nots casein, VAGUCT FROM CH198236.6850 TO 195823 6850 snopes TRE (p35R 368) . [ee or MaPECTION TEST CONDUCTED: “TUR PY STERL CHE MICS AETROLOGTCALT ELECTRIC DIMENSIONAL/ NOTS/ PERFORMANCE TEST/ ANY OTHE [conoewcH Jan for sr.No, [Rguirements etal if inspection Tests Conducted result hich stage Remarks forest in cleared ra ere Paracs aay | Shanon | Saar ie dinensart pers jensionalAcEUaEY Part lse a cont eee : Vielduae wala, ak Tagen | Welding & NDT reports welaing inspection tert checked eaten sttaches ‘ial asembiy of srdars shown with required Fina Assembly ox spa “ial Assembly Report 3 slope, camber, ovetalllength,ske, Hole fimess | Confirms Inspection ger wise. been a atached Sa cared To orher aorta preparation, painting & despatch [Remarks ABD 1 at above mfg Stage/CHP of QAP material is ceared for ft eis certs that based onthe inspacion/tests conducts ser processing (ye A\, 7 ss wal din 5-H {2c Hn NERA LTO. NEC.

You might also like