Introduction
Voltage is proportional to the magnetic flux in the power system element. Most of the Power
System elements are reactive in nature. They absorb / generate reactive power depending on system
loading conditions. The balance in reactive power availability and requirement at a node indicates steady
voltage. Drawal of reactive power leads to reduction in voltage and supply of reactive power leads to
increase in voltage at the node. Ideally, the reactive power balance should be effected within each region,
within each distribution system.
Excess of MVAr high voltage
Deficit of MVAr Low Voltage
MVAR balance Good voltage low system losses
A great many loads consume not only active but also reactive power. The electric network itself both
consumes and produces reactive power. Transmission and distribution of electric power involve reactive
power losses due to the series inductance of transformers, overhead lines and underground cables. Lines
and cables also generate reactive power due to their shunt capacitance; this generation of reactive power
is, however, only of significance at high system voltages.
During the steady-state operation of an AC power system the active power production must match the
consumption plus the losses, since otherwise the frequency will change. There is an equally strong
relationship between the reactive power balance of a power system and the voltages. In itself, a reactive
power balance will always inherently be present, but with unacceptable voltages if the balance is not a
proper one. An excess of reactive power in an area means high voltages: a deficit means low voltages.
The reactive power balance of a power system also influences the active losses of the network, the
heating of components and, in some cases, the power system stability.
Contrary to the active power balance, which has to be effected by means of the generators alone, a proper
reactive power balance can and often has to be effected both by the generators and by dispersed special
reactive devices, producing or absorbing reactive power. The use of shunt reactive devices. i.e. shunt
compensation, is a straightforward reactive-power compensation method. The use of series capacitors,
i.e. series compensation is a line reactance compensation method.
No special reactive compensation devices were used in the early AC power systems, because the
generators were situated close to the loads. As networks became more widespread, synchronous motors,
small synchronous compensators and static shunt capacitors were adopted for power-factor correction.
Ever larger synchronous compensators were installed in transmission systems. Along with the
development of more efficient and economic capacitors, there has been a phenomenal growth in the use
of shunt capacitors as a means of furnishing reactive power, particularly within distribution systems.
With the introduction of extra-high-voltage lines, shunt reactors and series capacitors became important
compensation devices. The latest development is the Thyristor-controlled static var compensator, which
is now well established not only in high- power industrial networks but also in transmission systems.
In the following a distinction is made between transmission and distribution systems and also between
different voltage ranges in terms of HV, EHV, etc. It should therefore be appropriate to explain briefly
these terms.
Category of Voltage
Distribution System
Sub. Transmission System
HV Transmission System
UHV System
Transmission systems form those parts of power systems conveying comparatively large amounts of
electrical power. They link the generating sources with the distribution systems and interconnect parts of
the power system or adjacent power systems. Distribution systems form the continued links to the
consumers. The boundary between transmission and distribution systems is not very well defined.
Systems for voltages higher than 132 KV are usually called transmission systems. Systems for voltages
lower than 33 KV are usually called distribution systems. Systems in the range 33 to 132 kV are called
distribution, sub transmission systems.
All the figures given in this introduction refer to the highest voltage for equipment.
1.1 Need for management of reactive power
In an integrated power system, efficient management of active and reactive power flows is very
important. Quality of power supply is judged from the frequency and voltage of the power supply made
available to the consumers. While frequency is the measure of balance between power generated (or
power available) and MW demand impinged on the system, the voltage is indicative of reactive power
flows.
In a power system, the ac generators and EHV and UHV transmission lines generate reactive power.
Industrial installations whether small or large as also the irrigation pump motors, water supply systems
draw substantial reactive power from the power grid.
The generators have limited defined capability to generate reactive power- this is more so in respect of
large size generating units of 210 MW/500 MW capacity. Generation of higher reactive power
correspondingly reduces availability of useful power from the generators. During light load conditions,
there is excess reactive power available in the system since the transmission lines continue to generate
the reactive power thereby raising the system voltage and this causes reactive power flows to the
generators.
Particularly in India, the load curves show wide fluctuations at various hours of the day and in various
seasons of the year. When load demand is heavy, there is low voltage, which is harmful to the consumers
as well as utilitys installations. Burning of motors occur. When load demand is very low, high voltage
occurs in the system and this has harmful effect on insulation of power transformers. Failure of power
transformers occur.
For better efficiency, it is necessary to reduce and minimize reactive power flows in the system.
Besides harmful effects, the reactive power flows also affect the economy adversely both for the utility
and the consumer. If reactive power flows are reduced i R power losses as well as i X losses are
reduced. The generators can produce additional active power. If the consumer reduces reactive power
requirement his demand KVA is reduced. For energy conservation also there is need to reduce reactive
power demand in the system.
It is therefore very clear that for efficient management of power system and for improving the quality of
electric supply, it is very essential to install reactive compensation equipment. Such installations are
necessary and essential for utility as well as the consumer. Infact the utility should be made responsible
for making available only the active power to the consumer. Unfortunately, in India, the responsibilities
of users are not well defined and there is not enough realization in this regard. Utilities have now
introduced power factor clause in the tariff structure. However. It would be worthwhile to note that even
a 90% power factor load requires 43% reactive power from the grid.
1.2 Basic Principles:
A phasor description of voltage and current, the reactive power supplied to an AC circuit is the product of
the voltage and the reactive (watt-less) component of the current, this reactive current component being
in quadrature with the voltage.
Sinks (Q Absorption)
Gen. Under excited
Transmission Lines - series reactance drop
Shunt Reactors
Static Var Compensators (Q absorb
mode)
-
Loads -Capacitive
Loads - Inductive
Vs
M
jX
Vr0
Ir
M
Sr
Fig. 1.2
Let
Vs =Sending end voltage
Vr =Receiving end voltage
Sr = Receiving end complex power
Pr = Receiving end active power
Qr = Receiving end reactive power
= The angle difference between Vs and Vr
Ir = Receiving end current
X = Line reactance
Ps = Sending end active power
Qs = Sending end reactive power
Sr = Pr +j Qr = Vr . Ir*
(1)
V cos jV s Sin Vr
= Vr s
j X
V V Cos Vr 2
VsVr
Sin j s r
X
X
Pr =
V sVr
sin Pmax Sin Ps
X
(2)
VsVr Cos Vr 2
X
(3)
Qs =
Vs 2 VsVr Cos
X
(4)
Vr Vs V r
X
(5)
V s Vr
(6)
Inferences:
If V1and V2 are the sending end and receiving end voltages
The transmission capacity increases as the square of the voltage level
1. the direction of MW flow is determined by
V1 leading V2 P is 1 2
V1 lagging V2 P is 2 1
2. Magnitudes of V1 and V2 do not determine the MW flow direction
3. Though P1=P2, Q1 Q2
4. The reactive loss in line reactance is
2
Qave
Qs Qr V s V r
2
2x
5. If Vs
Vr the MVAR flows 1 2
If Vr Vs the MVAR flows 2 1
1.5 Power Losses in a Transmission line:
Losses across the series impedance of a transmission line are I 2 R and I2 X.
P JQ
*
V
I =
Where
P JQ
I* =
P jQ P jQ P 2 Q 2
= I.I* =
V2
V .V *
P2 Q2
V2
Ploss = I2R =
Qloss =I2X =
P2 Q2
V2
.R
(7)
.X
(8)
1.6
Voltage Regulation:
Voltage regulation is defined as the change of voltage at the receiving end when rated load is
thrown off, the sending end voltage being held constant.
ETh
Vr
X.Pr
V
X.Qr
V
Pr jQr
V*
ETh =V0 +j X I =V + j X
=V+
XQr
XPr
j
(9)
V
V
(b)
Shunt compensation is drawing or injection of reactive power at a node. Reactor absorbs reactive power
and so reduces system voltage. Capacitor injects reactive power and so increases system voltage.
1.7 Short circuit capacity:
S sc 3 V I f
MVA
Where
V = Phase to phase voltage in kV
If = The three phase fault current in k.A.
(10)
= If p.u.
1
X Th
(11)
Q
S SC
pu.
Where
Q = Change in Q injection
Ssc =Short circuit capacity
V = Change in voltage in per unit
1.8 Reactive power - physical analogy
The reactive power is the extra effort needed to pull a load along the rail when the effort, s is at an
Overhead lines and underground cables are distributed-constant circuits, which have their series
resistance, series inductance and shunt capacitance distributed uniformly along its length. Figure 1.6
shows a lumped-constant equivalent circuit. If we assume constant operating voltages at the ends, the
reactive power generated due to the capacitance, the charging reactive power, is practically independent
of the power transferred. Particularly when we are dealing with long EHV lines, the so-called Surge
Impedance Load (SIL) P0 or natural load of an uncompensated line is a convenient value for reference
purposes. It is given approximately by:
Po V 2
b
MW
x
------------------------------------------------(12)
where
V = voltage, line-line kV
b = susceptance
mho/km
x = reactance
ohm/km
A loss less line (a reasonable approximation of an EHV line) transferring an active power P0 and with
equal voltages at the line ends has reactive power balance. The reactive power loss due to the line
inductance is equal to the reactive power generated by the line capacitance.
Operating voltage
SIL
Line charging
kV
MW
Mvar/km
0.4
10
130
50
0.05
220
130
0.14
400
550
0.6
500
910
1.0
750
2200
2.3
Table 1. Typical values of overhead line characteristics at 50Hz.
X
Ohm/km
0.40
0.40
0.40
0.40
0.33
0.30
0.28
X/R
0.5
0.5
3
6
15
16
30
Table 1 gives typical values of overhead line characteristics at 50Hz. At 60 Hz the SIL values are the
same while the line charging, X and X/R values are 20 per cent higher. The SIL is usually much lower
than the thermal rating. Below 69 kV the line charging is usually negligible while it is a significant
source of reactive power for long lines of higher system voltages.
Paradoxically, the series reactance is fairly independent of the system voltage, assuming a single
conductor. The lower values at 400 kV, 500 kV and 750 kV illustrate the effect of the necessary use of
bundle conductors for these system voltages. In reality there is a great spread in the X/R values, for a
system voltage under consideration, in particular at low system voltages. The figures are however,
included in order to illustrate that the X/R ratio increases rapidly with the system voltage.
1.9.3. Underground cables:
Table 2 gives sample values of underground cable characteristics. The spread in parameter values for a
system voltage under consideration is very much larger than for overhead lines, depending on the cable
type, size and conductor geometry and spacings. Except for low voltage cables, the SIL is usually much
larger than the thermal rating. The line charging of polyethylene insulated cables, now being introduced
at ever higher system voltaes, is much lower, e.g. 50 per cent of that of paper-insulated cables.
Operating voltage
SIL
Line charging
X
X/R
kV
MW
Mvar/km
Ohm/km
0.4
0.07
0.3
10
3
0.01
0.10
0.4
130
500
2
0.15
2
220
1000
4
0.18
6
400
3200
13
0.2
9
Table.2 Sample values of underground cable characteristics at 50 Hz. 0.4. 10 kV:PVC, 132,400kV paperinsulated cables.
1.10 Loads
A great many loads consume not only active but also reactive power.
The Industry wise power factor is generally observed to be as follows:
INDUSTRY
POWER FACTOR
Textiles
Chemical
Machine shop
Arc Welding
Arc Furnaces
Coreless induction furnaces and heaters
Cement plants
Garment factories
Breweries
Steel Plants
Collieries
Brick Works
Cold Storage
Foundries
Plastic moulding plants
Printing
Quarries
Rolling Mills (i.e. ,Paper, Steel , etc.)
0.65/0.75
0.75/0.85
0.4 / 0.65
0.35/ 0.4
0.7 / 0.9
0.15/0.4
0.78/0.8
0.35/0.6
0.75/0.8
0.6 / 0.85
0.65/0.85
0.6 / 0.75
0.7 / 0.8
0.5 / 0.7
0.6 / 0.75
0.55/0.7
0.5 / 0.7
0.3 / 0.75
Some typical values of reactive power consumption of individual loads are given below:
Both controlled rectifiers and arc furnaces of steel mills have a reactive power consumption characterized
by a high average value and fast variations. Purely resistive loads, like filament lamps and electric
heaters, do not, of course, consume reactive power.
The synchronous motor is the only type of individual load,
which can produce reactive power. it consumes reactive power
when under excited and produces reactive power when
overexcited. Synchronous motors are usually operated
overexcited and thus usually produce reactive power.
Individual loads may, of course, vary within short or long time
ranges. The composite loads of a power system. Each one
being the total load of a certain area, usually vary with the
time of the day, the day of the week and the season of the year
and may also grow from year to year. The consumer demand
for reactive power varies in a somewhat similar way to the
demand for active power. Figure 1.7 illustrates how the active
and the reactive power supplied from a transmission
9
Fig.1.7
Examples
of
load
substation into a load area, with mixed industrial and domestic loads, may vary during a Sunday and a
Monday.
The resultant active power demand of a power system varies roughly as the variation of total toad. The
resultant reactive power demand may vary considerably more due to the changing series reactive power
losses in the networks.
1.11. Relationship of voltage to reactive power
As regards the study of terminal voltages of a transmission or a distribution link, the link can be
represented by the series impedance only if the shunt admittances of the equivalent circuit are included in
the treatment of the connecting parts of the power system,
Fig. 1.8. The link may be an overhead line, an underground
cable, or a transformer. The voltage drop, i.e. the scalar
voltage difference, is defined by:
V= V1 V2 --------------(13)
The Phasor diagram of Figure 1.8, for a case with lagging
power factor, shows that it can be approximately expressed
by the following equations:
The accuracy of the equations (14) and (15) is better, the less the voltage-angle difference is. The
equations are usually sufficiently accurate for calculations concerning a single link with lagging power
factor. The equations are less accurate and should not be used in calculations for -leading power factor.
Precise calculations concerning a complete network are, nowadays, performed by means of computer
power flow programs.
The equation (15) is, however, generally useful for qualitative discussions of voltage versus reactive
power. For transformers, R can always be disregarded. For transmission (not distribution) lines and
cables. X is usually much larger than R. For all these many links, where X is -much larger than R, there
will evidently be a much greater influence on V per kvar of reactive power than per kW of active power
transmitted.
When power is supplied through a single link, Figure 1.8, assuming V1 constant, V2 varies with changes
in P and Q. Load variations create voltage variations if not counteracted. This is a general, and sometimes
-troublesome, operation feature of AC power systems.
There are three major methods of power system voltage control:
Varying the excitation of the generators by means of their excitation systems.
Varying the turns ratio of transformers by means of their on-load tap changers.
Varying the shunt compensation, where applied.
By shunt compensation is meant drawing or injection of reactive power, at a point of a power system by
means of a shunt-connected device, which is installed for this sole purpose. Drawing reactive power. e.g.
absorption by means of a shunt reactor, effects voltage reduction. Injection of reactive power, e.g.
10
production by means of a shunt capacitor, effects voltage rise. The equation (15) and Figure 1.8 show
how shunt compensation influences the voltage. The voltage-change directions mentioned arise because
the network equivalent impedance has an inductive character at the fundamental frequency. The shunt
compensation may be fixed, switchable in steps or continuously controllable. Around the nominal
voltage, the voltage change V, when the shunt compensation is changed in step, is approximately
expressed by;
V =
Q
S sc
------------------(16)
Where
Q- change in nominal three phase reactive power injection Mvar
Ssc- Short-circuit capacity
in MVA
Adjacent generators with voltage regulators and adjacent transformers with voltage-relay controlled onload tap changers will, of course, more or less reduce the voltage change after a certain time. By series
compensation is meant compensation of line inductive reactance by means of a capacitor in series with
the line, thus reducing the effective inductive reactance of the line and the effects thereof.
1.12
PV Curves
PV Curves are the product of parametric analysis. Take into consideration the system shown at right.
Power is transferred from the Sending Area to the Receiving Area via a set of transmission lines forming
an Interface. As the transfer increases, the conditions on the lines and buses along the transfer path,
including those within the Sending and Receiving area, change. The voltages may drop, flows on
branches may increase or decrease.
Monitoring voltage at a particular bus and plotting this against the power transfer produces a familiar
diagram known as the PV Curve. A sample curve is shown below. When the voltage at the selected bus
goes below some pre-defined criteria, then the transfer at which this occurs is the Low Voltage transfer
limit for that bus. Ignoring the low voltage and continuing to increase transfer would eventually bring the
curve to a point where the system collapses. The point of collapse can likewise be designated as the
Voltage Collapse transfer limit.
11
In PSSTPLAN, PV curves are provided as a distinct Analytical Engine. As such it is provided with
powerful features:
Easy setup
Comprehensive results
Adaptive step size. You define a range for the transfer increment, and PSSTPLAN will select a
step size which will maintain the accuracy of the simulation at minimum loss of resolution.
Non-divergent power flow. The last point on the curve is always accurately determined by a
special algorithm which can identify divergence.
1.13
12
CHAPTER - 2
REACTIVE POWER SOURCES AND SINKS
2.0 Introduction:
Sources of reactive power are
Generating units
Synchronous condenser
On-load tap changers and phase-shifting transformers.
Capacitors and reactors
Static compensators.
Power system component characteristics
A brief look at characteristics for power system components will help to explain reactive power matters.
The role of power system components in reactive power control are briefed below.
2.1 Generators
The purposes of generators are to supply the active power, to provide the primary voltage control of the
power system and to bring about, or at least contribute to, the desired reactive power balance in the areas
adjacent to the generating stations. A generator absorbs reactive power when under excited and it
produces reactive power when overexcited. The reactive power output is continuously controllable
through varying the excitation current. The allowable reactive power absorption or production is
dependent on the active power output as illustrated by the power charts of Figures 2.1 and 2.2. For shortterm operation the thermal limits are usually allowed to be overridden.
The step-response time in voltage control is from several tenths of a second and upwards. The rated
power factor of generators usually lies within the range 0.80 to 0.95. Generators installed remotely from
load centers usually have a high rated power factor; this is often the case with large hydro-turbine
generators. Generators installed close to load centers usually have a lower rated power factor. In some
cases of large steam-turbine generators the rated power factor may have been selected at the lower end of
the above range in order to ensure reactive power reserve for severe forced outage conditions of the
power system.
Fig 2.1 Typical Power chart for large steam turbine and gas turbine generators
where
a Turbine power limit
b Stator winding thermal limit
c Field winding thermal limit
d Steady-slate stability limit with proper AVR
e Assumed intervention curve of under excitation limiter
13
Fig.2.2. Typical power chart for large hydro-turbine generators (salient-pole machines)
Large generators are usually connected direct to transmission networks via step-up transformers. The
terminal voltage of a large generator is usually allowed to be controlled within a 5% range around the
nominal voltage, at rated load. In most countries the generator step-up transformers are usually not
equipped with on-load tap changers.
Excitation Control: The MVAR output of a generator is dependent on its excitation. The MVAR is
generated during over excitation and is absorbed during under excitation. The rotor current depends on
the excitation. The rotor winding temperature, the air gap temperature and the machine temperature
increase during over excitation. The winding temperature is limited to about 90 oC during normal
loading. It increases to 100 105oC during over loading. The machine which is already over heated due
to MVAR generation can not take MW load to its full capacity. Hence MW load is to be compromised
when the unit is excited beyond its normal limits.
When the unit generates MVAR and supplies to the system, the system voltage profile around the
generating station increases. This increase in voltage is more in first neighbourhood. The load end
voltages which are beyond, say second neighbourhood will not get effected because of this unit
excitation. Hence the influence of a unit on voltage profile in the system is local in nature. The load end
voltages can not be controlled by the generating units.
However depending on the capability curve of the generating unit and as long as margin is available in
the unit, it can be used to control the system voltages in its vicinity.
The change in the voltage V in the first neighbourhood of the generating station depends on the relation
V = Q/S in p.u.
Where V = change in bus voltage in pu
Q = Amount of Q supplied through over excitation in p.u.
S = Fault level of the system at first neighbourhood in p.u.
2.2 Shunt reactor
A shunt reactor is a reactor connected in shunt to a power system for the purpose of absorbing reactive
power. In some cases where a fixed or mechanically switched shunt reactor can be used with regard to
the voltage control requirements. It is usually the most economic special means available for reactive
power absorption. The majority of shunt reactors are applied in conjunction with long EHV overhead
lines. They are also applied in conjunction with HV and EHV underground cables in large urban areas.
Shunt reactors in use range in size from a few Mvar at low medium voltages and up to hundreds of Mvar.
14
Shunt reactors are necessarily installed to suppress high voltage during light load
conditions. For
400kV and UHV lines, shunt reactors are directly connected on line. This is for the purpose of
compensating leading charging MVAR released by the line. Shunt reactors are also connected on tertiary
delta windings of autotransformers so that these can be switched on during light load periods.
Reactor Operation: The shunt reactor is a coil connected to the system voltage and grounded at the
other end. It draws the magnetizing current, which is purely inductive, from the system and hence forms
an inductive load at the point of connection. Hence the reactor absorbs reactive power from the system
as long as it is connected to the system. Hence it is complimentary to a capacitor bank in its function.
The reduction in voltage at the point of connection is given by V = Q/S, all expressed in p.u. terms.
The reactors are required to be used at EHV voltages of 400 kV and above, as the line charging at this
voltage is quite significant, it increases the receiving end voltage to unacceptable limits under light load
conditions. A 400 kV line generates about 55 MVAR per 100 km and hence this Ferranty effect is high
for lines of 300 km and above.
Two types of reactor connection are adopted in EHV systems.
A) The bus reactor, which is connected to the bus through a circuit breaker and hence can be
switched as and when required.
B) The line reactor; which is connected to the line through only an isolator and hence can be
removed from the system only when the line is switched off.
The functions of both bus reactor as well as line reactor are same. They absorb the reactive power from
the system depending upon their capacity.
The bus reactors are switchable and hence are cut-in whenever the system voltage is higher and can be
cut-off from the system whenever the system voltage reduces.
The line reactors are permanently connected to the lines and hence the system. Their role is to
a) Reduce the effect of line charging
b) Provide a least impedance path for the switching over voltages generated in the system due to
inductive load currents switching. The switching over voltages are of power frequency and
equal to 1.5 to 2.5 p.u. in magnitude.
c) When the EHV lines have single phase switching facility and auto reclose protection scheme is
implemented, the abnormal voltages developed across the circuit breaker can be contained only
with a line reactor on the line side.
d) The line reactors provide a least impedance path for low frequency (power frequency) switching
over voltages. Hence they act as surge diverters for power frequency over voltages. The
lightning over voltages cannot pass through the line reactor because of their high frequency.
2.3 Shunt capacitors
A shunt capacitor is a single capacitor unit or, more frequently, a bank of capacitor units connected in
shunt to a power system for the purpose of absorbing reactive power. When a fixed or mechanically
switched shunt capacitor can be used with regard to the voltage control requirements, it is the most
economic means available for reactive power supply. The majority of shunt capacitors are applied within
distribution systems of different types: Industrial, urban, residential and rural. They have a widespread
use there, for power-factor correction. Some shunt capacitors are installed in transmission substations.
Very large shunt capacitor banks (usually filters) are to be found in HVDC terminal stations.
Shunt capacitors in use range in size from a single unit rated a few kvar at low voltage up to a bank of
units, rated hundreds of Mvar.
15
Capacitor Operation: The capacitor banks are reactive power sources. They produce reactive power
equal to their rating when connected to the bus. In order to keep the insulation costs less, they are
connected to the system at distribution voltage levels, e.g. 0.4 kV, 11 kV, 33 kV etc.
The output of a capacitor bank is Qc = V2 c
Where Qc = output in MVAR
V = the system voltage in k.V.
C = in farads
Hence the output is proportional to the square of the voltage. If the system voltage to which the capacitor
bank is connected reduces to 0.9 p.u. the MVAR generated by the capacitor reduces to 0.81 p.u. Hence
the performance of a capacitor bank will be poor under low voltage conditions, at which time it is
required most.
The influence of a capacitor bank on the system voltage is again local like in case of a generator. It is
most pre dominent at the bus to which it is connected. Its effect gets reduced as we go to next
neighbourhood. The change in voltage at the point of connection is governed by the relation V = Q/S
Where V = change in bus voltage in pu
Q = Amount of Q supplied through the capacitor bank in p.u.
S = Fault MVA of the bus in p.u.
Hence it is possible to compute the capacitor requirement of the system at a location using
Q = (V)(S)
where Q is the amount of Q to be supplemented
V is the voltage raise required to reach the nominal value in p.u.
S is the fault level of the system in p.u.
Outstanding features of shunt capacitors are their low overall costs and their high application flexibility.
An unfavorable characteristic, most important in conjunction with major outages and disturbances, is that
they provide the least support at the very time when it may be most needed, because the reactive power
output is proportional to the voltage squared. If used in a proper mix with other reactive power sources,
this is, however, no obstacle to an extensive use of shunt capacitors. The losses of modern shunt
capacitors are of the order of 0.2w/Kvar, including the losses of fuses and discharge resistors
Shunt capacitors are useful in
Power factor correction
Voltage control and reactive power balance
Reducing transmission losses
Meeting requirements of reactive loads
Pf correction by shunt capacitors is by far the most satisfactory and economical method. The static
capacitor owing to its low losses, simplicity and high efficiency, is finding very wide and universal use
for pf correction.
A detailed description on construction, operation, protection and trouble shooting of capacitor banks is
provided in Chapter 3.
2.4 Transformer Tap Changing: A transformer in the grid is like a node. Its voltage is maintained by
the requirement and availability of reactive power at its terminals. If the HV voltage is low, due to
bucking tap at, say -5, for e.g. at 0.96 pu the HV bus will get a net reactive power in-flow of say 200
16
MVAR through its EHV transmission network. The same reactive power flows towards the LV bus. The
LV bus voltage now increases. This is illustrated in Fig 2.3.
If the transformer tap is raised to say 5, it is now boosting the HV voltage to say, 1.02 pu. Now the
reactive power in-flow reduces to HV bus, to say 20 MVAR. This reduced MVAR is flowing to LV bus.
Hence the LV bus voltage reduces. This is illustrated in Fig 2.4. Hence the transformer tap only alters
the number of turns in the HV winding there by altering the HV voltage. If this HV voltage is less than
the neighbourhood voltage it receives MVAR, if it is more, then it pumps MVAR to its neighbourhood.
The LV bus voltage is maintained only as a consequence of MVAR inflow or outflow to it from the HV
bus.
17
Both indoor and outdoor installations exist. Synchronous compensators below, say, 50 MVA are usually
air-cooled, while those above are usually hydrogen-cooled. Modern synchronous compensators are
usually equipped with a fast excitation system with a potential-source rectifier exciter. Various starting
methods are used; the modern one is inverter starting.
The size of a synchronous compensator is referred to the Continuous MVA rating far the generation of
reactive power. In the generating mode of operation it usually has a rather high short-time overload
capability. The absorption capability is normally of the order of 60 per cent of the MVA rating, which
means that the control range is usually 160 per cent of the MVA rating. The reactive power output is
continuously controllable. The step-response time with closed-loop voltage control is from a few tenths of
a second, and up. The losses of hydrogen-cooled synchronous compensators are of the order of 10 W/kvar
at rated output. The losses of small air-cooled machines are of the order of 20 W/kvar at rated output.
In recent years the synchronous compensator has been practically ruled out by the SVC, in the case of
new installations, due to benefits in cost performance and reliability of the latter. One exception is HVDC
inverter stations, in cases where the short-circuit capacity has to be increased. The synchronous
compensators can do this, but not the SVC.
Comparison between Synchronous Condenser and shunt capacitor:
Sl.No
Synchronous condenser
Shunt capacitor
1.
2.
3.
4.
5.
6.
7.
8.
18
capacitors
9.
10.
19
20
Average one half-Cycle (maximum one cycle) delay for executing a command from the regulator,
as seen for a single phase
Switching transients are negligible.
No generation of harmonics
22
Fig 2.8 Operating principle of a SVC of type TSC + TCR for a slow change of control order
2.5.5 SVC Characteristics:
According to CIGRE an SVC shall be considered as a reactive load on the power system. That means the
reactive power, Q, of an SVC is positive when the SVC absorbs reactive power, and negative when the
SVC generates reactive power.
23
Harmonics in SVC:
A TSC does not produce harmonic currents, but a TCR does. All SVCs with continuous reactive power
control include one TCR or more thus they produce harmonic currents. The harmonics of zero sequence
character (eg. 3rd, 9th etc.) are eliminated by some delta connection. The 5 th and 7th harmonics are in some
cases eliminated by 12 pulse arrangement. As a last resort a filter is included. The allowable amount of
harmonic currents into the Power System expressed in terms of voltage distortion at the point of SVC
connection are :
The allowed voltage distortion caused by a single harmonic current =1.0%
The allowed total voltage distortion caused by all harmonic currents=1.5%
Dynamic Performance:
The small-signal performance of an SVC with closed-loop voltage control may be characterized by its
step-response time. It is defined here as the time required to achieve 90% of the called-for change in
voltage, for a step change in the reference voltage. The step change must be small enough for the SVC
not to reach a limit. The step-response time depends on the power-system equivalent impedance at the
SVC point of connection. It is typically less than a few cycles of the power-frequency voltage at the
minimum short-circuit MVA level considered when choosing the voltage regulator gain.
If there is a risk that the short-circuit MVA level can be even lower and thereby cause SVC voltage
control instability, this can be cured by a gain supervisor automatically reducing the gain in case of
instability.
If there are frequent wide variations in the short-circuit MVA level and if it is judged important to get as
fast small-signal voltage control as possible for all operating conditions, this can be achieved by a gain
optimizer, automatically and repeatedly adjusting the gain up or down versus the short-circuit MVA level.
The above discussion is primarily referred to continuously acting SVCs, but does in principle also apply
to discrete acting SVCs (SVCs of TSC, TSR or TSC/TSR type in a binary arrangement).
The large-signal performance is essentially characterized by the actuating time of the SVC triggering and
main circuits only. For a large voltage deviation, the SVC response time is typically of the order of one
power-frequency cycle, considering the power-frequency voltage component only.
24
Fig. 2.11 Illustrates the dynamic performance of an SVC for a large step change in the reference voltage
IT, IC and IB mean total, capacitor and reactor current respectively.
2.6 Series Capacitor:
It is a bank of capacitor units inserted in a line for the purpose of canceling a part of the line inductive
reactance and so reducing the transfer impedance.
The reactive power generated in a series capacitor is proportional to I L2 and so increases with increasing
transmitted power and thus influences the reactive power balance of the system.
The typical uses are:
To increase the transmission loading capability as determined by Transient stability limits
To obtain a desired steady state active power division among parallel circuits in order to reduce
overall losses
To control transmission voltages and reactive power balance
To prevent voltage collapse in heavily loaded systems
To damp the power oscillations in association with Thyristor control
The degree of compensation is 20 to 70% of line inductive reactance. The series capacitor (C se) can be
located at the ends of a long Transmission line or in a switching station in the middle of it.
Considerations are voltage profiles, efficiency of compensation, losses, fault currents, over voltages,
proximity to attended stations etc.
2.6.1. Comparison between shunt and series compensation
S.N
Shunt compensation
Series compensation
1.
The shunt unit is connected in parallel The series unit is connected in series in
across full line voltage. The current the circuit and therefore conducts full
through the shunt capacitor is nearly current
constant as the supply terminal voltage and
25
3.
v
Csh KVAR =
x cSH
v2
x Csh
.v
4.
5.
6.
7.
8.
9.
The
rating
is
based
on
KVARCsh = KW(Tan1 - Tan2) where
1 is the power factor angle before
correction, 2 is the pf angle after
correction
10.
26
compensation
capacitor
11.
12.
The fig. 2.12 Shows the bypass arrangement series capacitor (C se) in case of faults as large voltage
develops across the series capacitor. But the transient stability warrants reinsertion of C se into the system
at the earliest. This is achieved by the Zinc Oxide (Zno) varistor. It provides instantaneous capacitor
reinsertion after fault clearing. A triggered spark gap is provided to take care of excess energy absorbed
Csc
27
Fig 2.13 System of the type most exposed to the sub-synchronous resonance
Two basic phenomenon:
The generator appears as an induction generator for sub synchronous armature currents
If the difference between the synchronous frequency and the sub synchronous natural frequency of
the electrical system lies close to a natural frequency of the shaft mechanical system, the bilateral
coupling between the two systems becomes strong. If the net damping of the two systems is
negative, electrical and torsional oscillations will build up, either spontaneously or after a
disturbance, e.g. a line fault.
In case of hydro-turbine generator units, the risk of torsional oscillation problem is practically negligible.
Preventive Measures:
SSR detection and relaying leading to tripping of unit
Compensating sub synchronous currents with Dynamic stability
Pole-face amortizer winding against induction generator effect
Thyrister Controlled Series Capacitor.
The use of a Thyristor-controlled module, appropriately controlled, of the series capacitor bank seems to
be a promising counter measure.
Another subject often discussed is how to ensure correct operation of line relay protections in
conjunction with series capacitors. According to service experience the risk of maloperation of line
distance protections seems small. Ultra-high-speed line protections based on traveling wave detection
can eliminate the possible problems of line protection in conjunction with series capacitors.
28
29