You are on page 1of 13

UiTM SERI ISKANDAR

Tugasan BSD 152

Title :
DRAINAGE AND SEWERAGE SYSTEM at damar

Prepared for:
MISS NAZHATULZALKIS BT JAMALUDIN

NAME NO.UITM
MUHAMMAD FARES BIN 2009450792
PARUDI
AHMAD FADLI BIN 2009818776
MOHAMMAD
MOHAMMAD HILMI BIN 2009689922
NADZRI
FAISAL HAFIZ 2009400072
BIN ANUAR
MOHAMMUD 200985646
NAZIRUL BIN MOHD NOH

ACKNOWLEDGEMENT

Assalammualaikum, were grateful to Allah S.W.T finally we have finished our assignment
within one month. Our group consist Ahmad Fadli B Mohammad, Muhammad Fares B
Parudi, Mohd Hilmi B Nazri, Mohammud Nazirul B Mohd Noh, and Faisal Hafiz B Anuar
have be given a task to survey about the drainage and sewerage system at Damar
College, Pasir Salak. These tasks were given in three weeks to complete it. We were
thankful to Mr. Huzaifah and our lecturer Miss Nazhatulzalkis binti Jamaludin for their
information for us to complete this task. Thanks to our group member as their completed
this task. Once again thank to all parties involved in our assignment.
ADVANTAGES AND DISADVANTAGES IN USING
SEPARATE SYSTEM

This building (DAMAR) use many type of pipe. There are several positive and
negative effect

ADVANTAGES DISADVANTAGES

1. More expensive
1. First system
2. Using two pipe
2. All building used this system
3. Difficult for installment
3. Using two prime pipe
4. To many pipe is uses
4. Easy to maintenance .
5. Problem when renovated
5. Easy for the highest building to
combine all level to the drain and
not to main stack system.
Our group consists of five persons we
system in Damar, Kolej Pasir Salak , M
sewerage system are used, the condi
The final data were recorded as to do
the level of maintenance and the typ

As we know, the truly is we have to p


can get the true knowledge and expe
studies. We hope that this proposal h
CONTENT
i. LIST OF FIGURE AND PHOTO
ii LIST OF TABLE AND TABLE
.
ii ACKNOWLEDGEMENT
i.
i OBJECTIVE STUDY (AIM)
v
.
v ANALYSIS AND FINDING
.
v RECOMMENDATION AND CONCLUSION
i.
v REFERENCES
ii
.
v SUPPORTING OF APPENDIX
ii
i.
FIQUR
SE

DRAINAGE SYSTEM
CA
We were investigated the draina
MARA Technology of University.
abdul hamid about the sewerage
recorded in analysis and finding
system in Damar. During the inve
and sewerage in Damar.we are als
include the recommendation in cu
practicing the knowledge from the

Since in investigation, the technicia


APPENDIX DIAGRAM
1. Manhole.
2. Drainage system
3. Sewerage system
4. Waste Trap (Bottle Trap)

You might also like