Professional Documents
Culture Documents
TSMPBS Form
No. 002
THOME
SHIP MANAGEMENT PTE LTD
Vessel
Projected
of Transit
Port
Date of Transit
Time
Depth Calculation
Forward
Chart Datum
Aft
Effect of Tide
Draft
Midship (P)
Midship (S)
Deepest (Static) Draft
Maximum Draft
2.
3.
4.
CONTROLLED
THOME
SHIP MANAGEMENT PTE LTD
B. Water Depths
1.
2.
3.
4.
5.
2.
During Approach
3.
During Transit
4.
At Anchorage
5.
Alongside Terminal
2.
3.
During Transit
4.
During Anchorage
5.
6.
E. Height of Tide Required to Obtain Minimum Under Keel Clearance (If Applicable)
1.
D2 - C2
2.
During Transit
D3 - C3
3.
During Anchorage
D4 - C4
4.
D5 - C5
CONTROLLED
THOME
SHIP MANAGEMENT PTE LTD
2.
During Transit
3.
While at Anchorage
4.
While Alongside
Where it has been identified, the vessel fails to meet company policy
Operations / Marine Department to receive a copy of this form
Master
Filing
CONTROLLED
Onboard