Professional Documents
Culture Documents
INDEX
1. DOCUMENTS:
AA. Oil record book
BB. Sludge / Bilge disposal
CC. Diagrams & Modifications of Systems on board
DD. Class / PSC / Flag State Reports
EE. SOPEP Manual
FF. Certificates
2. SEAL MANAGEMENT:
3. SOPEP EQUIPMENT:
4. BOW / STERN THRUSTER ARRANGEMENTS:
5. STERN TUBE:
6. CPP:
7. OPEN DECKS, MOORING STATIONS:
8. ENGINE ROOM & STEERING GEAR:
AA. Cleanness & Leakages Free
BB. Marking of Valves & Pipes
CC. Flexible Hoses
DD. Filters of the Pumps /Suction valves
EE. Sludge System
FF. Bilge System (ER)
GG. Draining system
9. OILY WATER SEPARATOR & OIL CONTENTS MONITORS:
AA. Mandatory Spares
BB. Operational and visual condition
CC. Maintenance
10. DUCT KEEL/UNDERDECK PASSAGES:
AA. Duct keel
BB. Underdeck passages
11. BALLAST, FUEL, LO AND MISCELLANEOUS TANKS:
12. INCINERATOR & BOILER:
13. PURE DRY SYSTEM:
1. DOCUMENTS:
a. Is ORB in use provided by Flag State Administration? Which Flag State?- LIBERIA
a. Does any PSC and/or Flag State inspection report contain any MARPOL relevant
deficiencies? -
b. What is the status of above deficiencies? -
c. Was verification and reporting on rectification provided to issuing Authorities? -
d. Do any MARPOL relevant CoC/Memo/Deficiencies exist in the Class reports?
e. What is status and dates for rectification/implementation (as applicable)? -
f. Verification carried out during this inspection, results –
FF. Certificates
2. SEAL MANAGEMENT:
a. Is the sealing carried out as per QSEEMS procedure VPM – Chapter 6 – Section
2? – YES
b.
(Sealing on NB & take over vessels must be completed within 30 days)
c. Does the Chief Engineer keep and personally maintain the Seal Log? – YES
d. Are entries correct and accurate? – YES
e. Are numbers of seal logged matching with installed? (to be verified up to the extent
required by inspecting Superintendent) - YES
f. Does the Master keep and personally maintain the Seal Log? – YES
g. Does the Master keep used MARPOL seals for two-year period (lots of Jan-Dec for
each year) after removing? - YES
h. Used Marpol seals – Are these disposed on Annual basis? Last done? -
i. Do issued dates of seals match with date of installation? – YES
j. Do returning dates of seals match with dates of replacement/removing? - YES
k. Is the seal’s issuance by Master to Chief Engineer recorded individually for each
occasion in both Logs? - YES
l. Do we have the Seal ROB mentioned in the Master Hand over notes? -
AA. Verify correct seal installation on flanges of below listed pipelines (one seal per
flange, except blind flanges where 2 seal to be installed across):
Scrubber – N/A
a. Is wash water monitoring sample line cheat proof to inlet and outlet on Water
monitoring module.
Note: For ZEME It is Untreated and Treated water sample analyzer [UWSA &
TWSA].
b. Is holding tank suction and OVBD discharge line flanges sealed against un-
authorized usage?
c. Is sludge tank OVBD discharge line flanges [from pump until std. shore connection
on deck] sealed against un-authorized usage?
d. Is alkali bunkering line on deck installed with blank flange and sealed?
e. Is BOTU/WTU discharge line connection to wash water OVBD sealed?
f. Confirm flanges in feed line from Process [Recycle] tank to BOTU [WTU] to be
sealed.
g. Is CEMS sampling line secured against tampering?
BB. Verify that following valves are sealed (sealing to be provided in such way that
could not be avoided while operating valves. Use as many seals as required to
achieve compliance):
a. Sampling pipe of OCM (Both ends of the pipe using suitable cheat proof devices) –
YES
3. SOPEP EQUIPMENT:
a. Are all equipment’s quantity & quality matching with requirements of SOPEP
Manual Appendix J? – YES
b. Is inventory updated monthly (deck scupper plugs to be mentioned as quantity in
use and spare separately for each type) and posted in the Sopep locker - YES
c. Is the portable (wilden pump inside the Sopep locker located in a separate box and
sealed with ISPS Seal? - YES
d. Is there evidence that the pump is used for tasks other than emergencies? -NO
e. Is the ISPS seal number logged after breaking and records compared to daily work
done report.- YES
a. Are any leakages from Thrusters reported by crew or seen during inspection? –
Version 02 Tech 32c
b. If Thruster(s) has Bio-degradable oil in the system? – N/A
c. If vessel is entering VGP areas and where biodegradable seal is not fitted, do we
have an ‘Infeasibility Statement’? -
d. Are any internal Oil or Water leakages noticed during inspection of Thrusters
compartment? -NO
e. Results of Thruster(s) LO analysis maintained on board? What’s % of water
contents? – < 0.02%
f. Results of Thruster(s) LO analysis carried out by Shore Laboratory? –
g. What is cosmetic condition of Thruster’s compartment overall including Bilges,
platforms
5. STERN TUBE:
6. CPP:
a. Are any machinery/mechanisms observed with oil leakage (cranes, hatch cover’s
hydraulic system, mooring winches, windlasses, Lifeboat’s davits/ramps etc.)? –
NO
b. Are the save-alls at bunker stations and ventilation heads of Fuel & IOPP tanks of
adequate size, provided with closing plugs, having good operational drains (if
designed) and clean? -
c. Do all save-alls have clear marking of their capacities? -
d. Is location and shape of save-alls suitable to contain spillage and prevent spillage
overboard? – YES
e. If save-all trays are fitted in close proximity to overboard side, are guards fitted to
prevent any spillage overboard? - YES
f. Are save-alls provided around Mooring Winches/Windlasses (as applicable)? - YES
g. Are bunker lines (FO/DO/LO) & Sludge line, their valves and flanges in good
condition? - YES
h. Is the pressure test date & pressure available for the bunker line and the sludge
line? Was the pressure test done hydrostatically? - YES
i. Is this pressure test date stencilled at the bunker manifolds? - YES
j. Are Scupper plugs kept fitted at all times as a practice? – YES
k. Are any Drums with LO/Chemicals stored on open decks? - NO
a. Purifier compartment -
b. Auxiliary Engines compartment, including AEs -
c. Main Engine (itself) –
e. Tank top including Bilge wells of Shaft compartment and under the fly wheel -
f. Boiler area –
h. Incinerator area –
a. Are there any Flexible (oily) hoses observed in the ER or other compartments
during inspection? –
b. Are there any portable pumps, other than one for SOPEP, observed in ER or other
compartments during inspection? –
c. Is the hose locker located as far forward (outside the ER)? Specify location
onboard
d. Are all Flexible hoses within ER designed for clean water & air are marked/tagged
accordingly (Purpose, Length, Diameter), and has no signs of oil inside? –
e. Are all Flexible hoses and portable pumps (other than the ones in SOPEP
inventory) stored in a sealed and locked locker located outside of ER as per
procedures? –
f. Does the key to this locker remains in the possession of the Master? -
g. Is updated inventory of flexible hoses posted? -
h. Is office permission being taken for every opening of Hose Locker and report sent
on closing as prescribed? (Permission must be taken even if any supdt is onboard)
–
i. Do we have a 25m3 submersible pump along with 100mtrs hose in the Hose
locker? -
Were Filters of the Fire/GS/Ballast pumps opened for inspection? Any oil traces found?
(attach photos) -
a. Were filters of Direct Bilge Suctions from bilge wells opened for inspection? Any oil
or water residue/traces found? (attach photos) –
(To be done only during CE Change over & Superintendent visit onboard)
b. If yes, is it oil or water? -
a. Are any drains from various machinery/mechanisms tray which could contain Fuel
or Oil leading to Bilge Holding tank or connected with Bilge system? -
b. Any modifications required or already carried out? –
c. In case modifications carried out, are deviations verified by Class? –
d. Confirm no possibility of draining water from sludge tank to Bilge Holding tank?-
e. Are drains in ER that lead to Double Bottom tanks complying with Load Line
Regulations? (NRV provided, drains are uninterrupted from the level above Load
Line) –
f. Are there any drains/interconnections leading to the tanks through manhole? –
g. Are there any hoses in use as drains or extension of drains? (Not allowed and to be
removed/replaced with permanent pipes) -
(Verify official E.R. drain piping diagram, compare with actual arrangements. Check
if there are lines without NRV or interrupted below Load Line, leading to the tanks
through manhole, non-approved modifications, flexible hoses. Specify D.B. tanks
inspected)
a. Are all mandatory spares for OWS available on board as per ship’s specific
equipment as indicated in Tech 27? -
b. Is the list of all spares (as printed from AMOS) displayed clearly with ROB? -
c. Is a spare, Calibrated by maker OCM or measuring cell available on board? Date of
Calibration? -
(PS – the spare OCM must be off landed only when we have the spare unit
available onboard)
h. Does the appearance of the OWS/OCM and its piping/surroundings justify further
detailed inspection? –
i. OWS overboard valve – is the key to the lock available in personal custody of the
CE (& not kept in the ECR)?-
j. Is the OWS overboard discharge done during daylight with Master’s consent after
informing Bridge? –
k. If discharge is done outside daylight hours, is this approved by office?-
a. When was OWS last opened by crew (if 2 sections – dates for both)? -
b. What was the reason for opening? -
c. Was this opening logged in ORB? –
d. Was it recorded in AMOS? -
e. When BHT was last inspected? -
f. Was cleaning required & provided (indicate date if applicable)? -
g. Was it recorded in ORB? -
h. Was it recorded in AMOS? -
i. Is OWS operated at least once every month and it is reflected in the ORB and
MARPOL 03? Dates of last 3 operations? -
a. Are all Ballast Tanks having mutual bulkheads with FO/LO/IOPP tanks inspected
on a six monthly basis? –
b. Are all Ballast Tanks having ventilation/sounding pipes of FO/LO/IOPP tanks
passing through them inspected on a six monthly basis? -
c. Are reports for above inspections submitted to the Office and available on board? –
d. Any critical/important finding with regards to possible contamination/poor
condition/abnormalities/excessive corrosion? -
Version 02 Tech 32c
e. Which tanks were inspected during current inspection? –
f. What is the condition of inspected tanks? –
g. Are the ballast tanks having common boundary/interface with fuel tanks on the
vessel provided with perforated sounding pipes? –
h. Are manhole covers closed after tank inspection with all nuts & gasket secured and
renewed, if needed?
i. Is a general inspection of manhole covers inside cargo holds carried out and
condition of all studs/nuts/gaskets verified?
j. What is the condition of the Fuel/LO/IOPP Tanks’ bulkheads within Cargo Holds? –
k. What is the condition of the external hull, Fuel/LO/IOPP Tank bulkheads? –
l. Are manholes of FO/LO/IOPP tanks properly colour marked and visibly named
within all ship’s compartments including Cargo Holds? –
m. Are boundaries of FO/LO/IOPP tanks properly colour marked within all ship’s
compartments including Cargo Holds? -
n. Soot: Is there a washing tank for the exhaust gas boiler installed? If yes, are all
direct pumping possibilities through that tank excluded?
a. Are Chemicals segregated as OWS Friendly / Non Friendly and placards posted? -
Version 02 Tech 32c
b. Are Chemicals segregated as Acidic / Alkaline and placards posted? -
c. MSDS available at Chemical Locker? -
d. Do Chemical storage areas/lockers have no risk of spillage overboard? -
e. Is paint on board stored in designated Paint Locker only? -
f. Is MSDS available at Paint Locker? -
g. Is manifest for all IMDG cargo carried onboard available? -
a. Is Sewage Holding tank provided on the vessel and included in ISPP Certificate? –
b. Is Treated Sewage Holding tank designed and included in Class constructional
drawings/ amended documentation with Class approval (Sewage, Ballast line
diagrams, Capacity Plan, Ballast Water Management Plan, Trim & Stability Booklet,
loading software, as applicable)? –
c. If Tank modified from any Ballast tank, is it disconnected from the Ballast system? –
d. Is sewage direct overboard discharge carried out on the vessel? Under which
circumstances? -
e. What is the practice implemented on board for discharge of treated sewage at
sea/port? -
a. Are set of mandatory MARPOL spares for STP as per Form Tech 27 available on
board?-
b. Is the list of all spares (as printed from AMOS) displayed clearly with ROB? -
DD. Documents/Certificates
AA. Documents/Certificates
a. Is Garbage Record Book of latest version (MSCSMCY Format) available and well
maintained? Any omissions/incorrectness/violations in records? -
b. Are GRB available for last 3 years or since vessel’s delivery to MSC? –
c. Is Garbage Management Plan of latest version (MSCSMCY Format) prepared,
posted? -
d. Is certificate concerning Prevention Pollution by Garbage issued by Class? -
e. Are Compactor, Comminuter & Incinerator included in the Certificate? –
f. Certificate with specification from makers for comminuter (confirming ground food
passing through 25mm mesh) and Type approval certificate for Compactor
available onboard? –
g. Is the crew aware of company’s EMS target – Reduction 0.5m3 garbage generation
Make: Wartsila/ZEME/Yara/Viswa
Model / Rating
AA) Documentation:
1. Is vessel issued with full term IAPP Cft with inclusion of EGCS system under
equivalents section 2.6 of IAPP Cft.? //Deck 03//
2. Vessel with EU flag with non EU EGCS maker, Confirm if MED-G Cft is issues?
//Deck 03//
3. Confirm if EGCS Data Update in IMO GISIS under MARPOL Annex VI in Public
Area.
4. Is vessel having below Approved MARPOL Docs [Vessel Specific?]
5. Ph, PAH, Turbidity and Density sensor type approval & Factory calibration
Cft.//Deck 03//
6. CEMS type approval and factory calibration Cft. //Deck 03//
7. Last, wash water sample lab analysis. //Deck 03//
1. Is EGCS Record book filled up with daily spot checks [Form 5,6&7 in Wartsila] as
an alternative means of demonstrating compliance in case of monitoring system
failure?
2. Are all section of EGCS Record book duly filled?
3. Are all maintenance as per OMM recorded in EGCS Record book.
4. Is Scrubber onboard training record book updated?
5. When was last wash water sample tested? Please check record in EGCS Record
Book
6. When was last CEMS validated with SO2/CO2 span gas? Please check this in
EGCS record book.
7. Last Alkali bunkering, to be verified from Alkali Delivery Note.
8. Confirm if MARPOL data extracted during inspection?
Note: Data needs to cross check against to cross check EGC record book logs for EGC Shutdowns,
EGC Maintenance, EGC running with Water monitoring or CEMS failure [Flag exemption record]
9. Holding tank last discharged to sea, records to be matched with sounding and
EGCS Record Book.
10. Sludge last discharged ashore, records to be verified from EGCS Record book and
shore discharge receipt.
11. Last wash water sample shore analysis record. //Ref Deck 03//
1. Is Scrubber operational in Open, Closed Loop and Closed loop Zero Discharge?
2. If time or situation permits, please test scrubber in all 3 modes
3. % ME MCR, % AE Load tested.
Note: For Wartsila, all 3 BOTU functions checked / For Apateq WTU, please check pneumatic
sludge compressor.
1. How many location leakage detection sensor fitted and their location?
Note: Lekage detection sensor to be fitted in each compartment through which GRE pipes passes.
1. Are all mandatory spares for Scrubber onboard as per ship & Equipment specific as stated
in Tech 27?
2. Are spare Ph, PAH, Turbidity and Density sensor and CEMS consumables filters onboard?
3. Is CEMS calibration gases [depending on CEMS maker Norsk or SICK] available onboard?
// Ref Tech 01//
4. Is Calibration kit for Ph, PAH and Turbidity sensor onboard. // Ref Tech 01//
6. Is spare blower and motor onboard for Exhaust damper sealing air fan? //Tech 27//
1. Does Vessel has sufficient compliant fuel in line with MSCGVA fuel policy?
2. Is sufficient alkali onboard for 2 round trip closed loop operation in present trade?
AA. Fuel
a. Is Company’s Approved Change Over procedure of latest version for ECA and
Specific Areas (EU/Turkey etc.) available on board? –
b. Do the ship’s staff correctly implement the C/O procedure on board? -
c. Are records with regards to C/O procedure correctly logged in ORB (Panama Flag
only) and Marine Sulphur Record Book (ECA only) and Engine Room Log book? –
d. Are reports on C/O procedure using Shipboard 10 Checklist provided correctly? -
e. Are records of all Bunkering operations and handling of samples correctly logged in
ORB and MSRB (as applicable)? -
f. Are BDN available for last 3 years?
g. Are bunker samples kept in a designated locker (retention for one year, check
locker capacity, location and whether kept locked)? -
BB. Refrigerant
a. Does the vessel have any Ozone Depleting Substance (e.g. R22) in use? –
b. Is a Refrigerant Leakage Log correctly maintained? –
c. Is the Refrigerant leakage detector available on board? -
d. Is the refrigerant Recovery Kit & Bottle available onboard? -
e. Are records with regards to Ozone Depleting substances maintained in the ORB
(for Panama Flag vessels) and in the ODS log book (for other Flag vessels)? -
f. Refrigerants phasing out in Jan 2020 (e.g. R-404a, R404a, R417a) in use on
board? If yes, where? –
g. Status of conversion to ZERO ODS - R407c – In progress / completed?
a. EIAPP Certificates for ME/AE (as applicable and indicated into IAPP) –
b. NOx Technical Files maintained and updated (as applicable) –
c. File is checked against the maintenance records & use of spare parts?
d. NOx Technical file – Last 3 entry dates?
e. Is VGP / NTVRP File maintained and updated (including Annual Report) & VGP
Compliance statement available onboard? -
f. Is vessel complying with US Biofouling requirements? –
g. Is the Biofouling Record Book available on board?
h. Bio Fouling Plan – Crew Training carried out as per Deck 07 –
i. Is Anti-Fouling Certificate (Statement of compliance) + Records available on board
and updated as per latest Dry Docking? –
j. Was the Emergency bilge suction valve seat checked during dry dock / lay up?-
k. Are all waste receipts issued during dry dock correctly compiled and accounted for
with work done reports?
l. Are SEEMP Part I & Part II with the Confirmation of Compliance available on board
and staff aware of same? – (indicate revision __________)
m. Are Annual Energy Efficiency Evaluation Sheets (SEEMP Part I) completed by the
ship’s staff and Performance Department available on board?
Superintendent/Manager: Date: