Uplift With Moment Example
Uplift With Moment Example
Project
Job Ref.
Section
Sheet no./rev.
1
Calc. by
Date
1/6/2012
Chk'd by
Date
App'd by
Date
2.0"
15.0"
W 12x96
50.0 kips
325.0 kip_in
2.0"
46.0 kips
1.75"
1.75"
4.0 kips
15.5"
Plan on baseplate
Elevation on baseplate
Bending moment;
Mu = 325.0 kip_in
Shear force;
Fv = 0.0 kips
Eccentricity;
f = N/2 - e1 = 7.750 in
Column details
Column section;
W 12x96
Depth;
d = 12.700 in
Breadth;
bf = 12.200 in
Flange thickness;
tf = 0.900 in
Web thickness;
tw = 0.550 in
Baseplate details
Depth;
N = 19.000 in
Breadth;
B = 19.000 in
Thickness;
tp = 1.250 in
Design strength;
Fy = 36.0 ksi
Foundation geometry
Member thickness;
ha = 20.000 in
xce1 = 30.000 in
xce2 = 30.000 in
yce1 = 30.000 in
yce2 = 30.000 in
Nbolt = 4
Bolt diameter;
do = 1.000 in
Bolt spacing;
sbolt = 15.000 in
Tedds Calc
Project
Job Ref.
Section
Sheet no./rev.
2
Calc. by
Date
1/6/2012
Edge distance;
e1 = 1.750 in
Fy = 36 ksi
fc = 3 ksi
Chk'd by
Date
App'd by
Date
c = 0.65
Flexure;
b = 0.90
Weld shear;
v = 0.75
fp,max = 0 ksi
Flange weld
Flange weld leg length;
tfw = 0.3125 in
Effective width for bending with 45deg distribution; beff = 2 ((N - d)/2 - e1) = 2.800 in
Web weld force;
da = 1 in
Nboltx = 2
Nbolty = 2
Tedds Calc
Project
Job Ref.
Section
Sheet no./rev.
3
Calc. by
Date
1/6/2012
Chk'd by
Date
sboltx = 15.5 in
App'd by
sbolty = 15 in
nt = 8
hef = 10 in
Date
Material details
fya = 36 ksi
fc = 3 ksi
= 1.00
t,s = 0.75
v,s = 0.70
Concrete tension;
t,c = 0.65
Concrete shear;
v,c = 0.70
t,cB = 0.70
v,cB = 0.70
1' 10.5"
1' 10.3"
1' 3.5"
10"
1' 8"
1' 10.5"
1' 3.0"
50 kips
1' 10.3"
5'
Plan on foundation
Section A-A
Concrete breakout - tension
t = 0.65
kc = 24
ca,min = 22.25 in
Tedds Calc
Project
Job Ref.
Section
Sheet no./rev.
4
Calc. by
Date
1/6/2012
Chk'd by
Date
App'd by
Date
cp,N = 1.000
Abrg = 1 in2
c,P = 1.400