You are on page 1of 36

INTERCHANGE 128+129.

57 (LEG # 01)
0+000 TO 0+862.743
Center Line
1 2
9

38.2
38.0

10

87

37.8
65

37.6

13

4
2

37.4

4
11

37.2
37.0

12

-5.0

-2.5

0.0

2.5

Horiz. = 1 : 101.99 Draw Scale

0 + 000.000

5.0

7.5

Left Side = Vert. Side Slope

Vert. = 1 : 28.72

Left Side = -0.018 Super Elevation

Right Side = 1 : 6.00

Road Section

Intersection Points

Sub Areas & Volumes

No. Offset
Level
1
-20.250
38.628

No. Offset
Level
1
-5.000
38.421

No. Offset
Level
1
3.072
37.916

Current Section
No. Area
Volume
0
-5.172

2
3
4
5
6

-4.750
0.000
10.000
20.000
30.000

38.418
38.030
37.660
37.410
36.930

2
3
4
5
6

-5.000
0.000
3.766
3.460
3.260

37.577
37.487
37.419
37.725
37.728

7
8

40.000
50.000

36.850
36.730

7
8
9

2.955
2.755
2.500

38.034
38.037
38.292

Total Areas & Volumes

10
11
12
13

3.000
8.717
10.217
13.215

38.283
37.330
37.080
37.580

Curr. Sec. Area


Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Consultant ITALCONSULT

Date 10/11/2015

5.807

12.5
Profile Grade = 38.337

Right Side = -0.018

Ground Section

10.0

37.815

1
2
3
4

Distance

Previous Section
Volume
Area

-1.750
0.000
0.000
0.000

Total Fill
0.000

Total Cut
-6.922

0.000

0.000

Contractor SAPAC

Page 1

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
12

38.2

10
13

38.0
87

37.8

4
65

37.6
37.4

2
3
4
11

37.2
37.0

12

-5.0

-2.5

0.0

2.5

Horiz. = 1 : 117.89 Draw Scale

0 + 025.000

5.0

7.5

Left Side = Vert. Side Slope

Vert. = 1 : 28.72

10.0

12.5

Left Side = -0.018 Super Elevation

Right Side = 1 : 6.00

15.0
Profile Grade = 38.316

Right Side = -0.018

Ground Section

Road Section

Intersection Points

Sub Areas & Volumes

No. Offset
Level
1
-20.400
38.618

No. Offset
Level
1
-5.000
38.409

No. Offset
Level
1
3.012
37.956

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
-5.361
0.000
25.000
-131.663
-5.172

2
3
4
5
6

-4.900
0.000
10.000
20.000
30.000

38.408
38.010
37.830
38.180
37.610

2
3
4
5
6

-5.000
0.000
3.766
3.460
3.260

37.556
37.466
37.398
37.704
37.707

7
8

40.000
50.000

37.080
36.820

7
8
9

2.955
2.755
2.500

38.013
38.016
38.271

Total Areas & Volumes

10
11
12
13

3.000
8.717
10.217
16.130

38.262
37.309
37.059
38.045

Curr. Sec. Area


Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Consultant ITALCONSULT

Date 10/11/2015

5.058

37.919

1
2
3
4

0.116
0.293
-0.042
-4.240

0.090
0.000
0.000
0.000

23.449
25.000
25.000
25.000

-20.518
3.663
-0.525
-53.000

-1.750
0.000
0.000
0.000

Total Fill
0.409
0.000
3.752

Total Cut
-9.642
-6.922
-205.705

3.752

-205.705

Contractor SAPAC

Page 2

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
13
5
2

38.2

1
9 10

38.0

87

37.8

37.6
37.4

65
2
3

37.2

11

37.0
12

-5.0

-2.5

0.0

2.5

5.0

Horiz. = 1 : 139.28 Draw Scale

0 + 050.000

7.5

10.0

Left Side = Vert. Side Slope

Vert. = 1 : 32.10

12.5

15.0

Left Side = -0.018 Super Elevation

Right Side = 1 : 6.00

17.5

20.0

Profile Grade = 38.273

Right Side = -0.018

Ground Section

Road Section

Intersection Points

Sub Areas & Volumes

No. Offset
Level
1
-21.100
38.610

No. Offset
Level
1
-5.000
38.365

No. Offset
Level
1
3.012
37.913

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
-4.821
0.000
25.000
-127.275
-5.361

2
3
4
5
6

-5.600
0.000
10.000
20.000
30.000

38.425
37.862
38.030
38.670
37.780

2
3
4
5
6

-5.000
0.000
3.766
3.460
3.260

37.513
37.423
37.355
37.661
37.664

7
8

40.000
50.000

37.180
36.760

7
8
9

2.955
2.755
2.500

37.970
37.973
38.228

Total Areas & Volumes

10
11
12
13

3.000
8.717
10.217
20.092

38.219
37.266
37.016
38.662

Curr. Sec. Area


Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Consultant ITALCONSULT

Date 10/11/2015

4.671

37.940

1
2
3
4

-9.259
0.000
0.000
1.072

-114.529
0.000
0.000
2.683

0.261
25.000
25.000
19.994

0.013
3.750
0.138
-42.797

0.098
0.300
0.011
-4.281

Total Fill
1.072
0.409
6.584

Total Cut
-14.080
-9.642
-284.600

10.336

-490.305

Contractor SAPAC

Page 3

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
1

4
13

38.2

9 10

38.0
87

37.8

37.6

65
2

37.4

3
4

37.2

11

37.0
12

-5.0

-2.5

0.0

2.5

Horiz. = 1 : 134.34 Draw Scale

0 + 075.000

5.0

7.5

Left Side = Vert. Side Slope

Vert. = 1 : 28.72

10.0

12.5

Left Side = -0.020 Super Elevation

Right Side = 1 : 6.00

15.0

17.5

Profile Grade = 38.282

Right Side = -0.020

Ground Section

Road Section

Intersection Points

Sub Areas & Volumes

No. Offset
Level
1
-22.900
38.588

No. Offset
Level
1
-6.500
38.414

No. Offset
Level
1
2.702
38.030

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
-6.157
0.000
25.000
-138.438
-4.918

2
3
4
5
6

-7.500
0.000
10.000
20.000
30.000

38.495
37.890
38.408
38.180
37.400

2
3
4
5
6

-6.500
0.000
3.767
3.461
3.261

37.562
37.432
37.357
37.663
37.667

7
8

40.000
50.000

37.060
36.740

7
8
9

2.955
2.755
2.500

37.973
37.977
38.232

Total Areas & Volumes

10
11
12
13

3.000
8.795
10.295
17.659

38.222
37.256
37.006
38.233

Curr. Sec. Area


Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Consultant ITALCONSULT

Date 10/11/2015

3.808

38.087

1
2
3
4

0.078
0.069
-0.081
-9.649

0.008
0.000
0.000
0.000

24.791
25.000
25.000
25.000

-114.460
0.863
-1.013
-121.488

-9.234
0.000
0.000
-0.070

Total Fill
0.147
1.072
0.871

Total Cut
-15.888
-14.080
-375.397

11.207

-865.703

Contractor SAPAC

Page 4

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
5

38.4

1
13

38.2
9

38.0
4

37.8

87

37.6
37.4

10

65

2
3

37.2

11

37.0
12

-5.0

-2.5

0.0

2.5

Horiz. = 1 : 137.08 Draw Scale

0 + 100.000

5.0

7.5

Left Side = Vert. Side Slope

Vert. = 1 : 35.48

10.0

12.5

15.0

Left Side = -0.025 Super Elevation

Right Side = 1 : 6.00

17.5
Profile Grade = 38.267

Right Side = -0.025

Ground Section

Road Section

Intersection Points

Sub Areas & Volumes

No. Offset
Level
1
-25.900
38.570

No. Offset
Level
1
-6.500
38.430

No. Offset
Level
1
2.540
38.164

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
-6.715
0.000
25.000
-161.063
-6.170

2
3
4
5
6

-10.500
-10.000
0.000
10.000
20.000

38.348
38.690
37.948
38.800
38.090

2
3
4
5
6

-6.500
0.000
3.772
3.464
3.264

37.579
37.417
37.323
37.630
37.635

7
8
9

30.000
40.000
50.000

37.130
36.840
36.790

7
8
9

2.956
2.756
2.500

37.943
37.948
38.205

Total Areas & Volumes

10
11
12
13

3.000
9.000
10.500
18.168

38.192
37.192
36.942
38.220

Curr. Sec. Area


Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Consultant ITALCONSULT

Date 10/11/2015

2.895

38.195

1
2
3
4

0.006
0.002
-0.092
-14.047

0.000
0.000
0.000
0.000

24.981
25.000
25.000
25.000

-92.917
0.025
-1.150
-175.588

-7.439
0.000
0.000
0.000

Total Fill
0.008
0.147
0.025

Total Cut
-20.854
-15.888
-430.717

11.232

-1,296.419

Contractor SAPAC

Page 5

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
5
4 5

38.2

1718

76

38.0

21

37.8

37.6

16
15

98

3
14
13

10

37.4

11
12

37.2

19

37.0
20

-17.5

-15.0

-12.5

-10.0

-7.5

-5.0

Horiz. = 1 : 196.30 Draw Scale

0 + 125.000

-2.5

0.0

2.5

Left Side = 1 : 6.00 Side Slope

Vert. = 1 : 30.41

5.0

7.5

10.0

Left Side = -0.025 Super Elevation

Right Side = 1 : 6.00

12.5

15.0

17.5

Profile Grade = 38.253

Right Side = -0.025

Ground Section

Road Section

Intersection Points

Sub Areas & Volumes

No. Offset
Level
1
-29.850
38.542

No. Offset
Level
1
-18.609
38.385

No. Offset
Level
1
-10.144
37.904

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
-3.383
0.000
25.000
-42.288
0.000

2
3
4
5
6

-14.500
-10.000
0.000
10.000
20.000

38.327
37.890
38.050
38.530
37.750

2
3
4
5
6

-12.935
-11.435
-7.000
-6.500
-6.744

37.439
37.689
38.428
38.416
38.172

7
8
9

30.000
40.000
50.000

37.260
37.090
37.120

7
8
9

-6.944
-7.237
-7.437

38.177
37.884
37.889

10
11
12
13
14

-7.729
0.000
3.772
3.464
3.264

37.596
37.403
37.309
37.616
37.621

15
16
17

2.956
2.756
2.500

37.929
37.934
38.191

18
19
20
21

3.000
9.000
10.500
16.888

38.178
37.178
36.928
37.993

Consultant ITALCONSULT

Date 10/11/2015

2
3
4

-7.185
2.520
2.781

37.935
38.171
38.183

1
2
3
4
5

0.874
-6.109
0.001
0.002
0.000

0.000
0.000
0.000
0.000
0.000

25.000
25.000
24.998
25.000
25.000

10.925
-160.300
-116.993
0.025
0.000

0.000
-6.715
-9.360
0.000
0.000

-11.135

0.000

25.000

-139.188

0.000

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
0.877
0.008
10.950

Total Cut
-20.627
-20.854
-458.768

22.182

-1,755.187

Contractor SAPAC

Page 6

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
4 5

38.2

1
76

38.0
37.8

37.6

17 18
1615

98

14
13

10

37.4

21

11

37.2

12
19

37.0
20

-17.5

-15.0

-12.5

-10.0

-7.5

-5.0

Horiz. = 1 : 176.01 Draw Scale

0 + 150.000

-2.5

0.0

2.5

Left Side = 1 : 6.00 Side Slope

Vert. = 1 : 30.41

5.0

7.5

Left Side = -0.025 Super Elevation

Right Side = 1 : 6.00

10.0

12.5
Profile Grade = 38.239

Right Side = -0.025

Ground Section

Road Section

Intersection Points

Sub Areas & Volumes

No. Offset
Level
1
-35.000
38.522

No. Offset
Level
1
-17.759
38.229

No. Offset
Level
1
-10.114
37.895

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
-2.268
0.000
25.000
-70.638
-3.383

2
3
4
5
6

-19.500
-10.000
0.000
10.000
20.000

38.305
37.890
38.138
37.710
37.210

2
3
4
5
6

-12.935
-11.435
-7.000
-6.500
-6.744

37.425
37.675
38.414
38.402
38.158

7
8
9

30.000
40.000
50.000

36.940
36.830
36.750

7
8
9

-6.944
-7.237
-7.437

38.163
37.870
37.875

10
11
12
13
14

-7.729
0.000
3.772
3.464
3.264

37.582
37.389
37.295
37.602
37.607

15
16
17

2.956
2.756
2.500

37.915
37.920
38.177

18
19
20
21

3.000
9.000
10.500
14.058

38.164
37.164
36.914
37.507

Consultant ITALCONSULT

Date 10/11/2015

2
3
4

-7.146
2.652
4.246

37.961
38.024
37.956

1
2
3
4
5

0.000
0.678
-6.421
-0.037
0.000

0.000
0.000
0.000
0.000
0.000

13.909
25.000
25.000
25.000
25.000

0.000
19.400
-81.950
-75.138
0.025

0.000
0.874
-0.135
-5.974
0.002

6
7
8

0.000
0.000
0.000

0.000
0.000
0.000

25.000
25.000
25.000

0.013
-2.350
-136.838

0.001
-0.188
-10.947

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
0.678
0.877
19.438

Total Cut
-8.726
-20.627
-366.913

41.619

-2,122.100

Contractor SAPAC

Page 7

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
4 5
17 18

76

38.0
37.8

16
15

98
1

37.6

1413

10

37.4
2

11

37.2

12

21

6
19

37.0

20

-15.0

-12.5

-10.0

-7.5

-5.0

Horiz. = 1 : 152.98 Draw Scale

0 + 175.000

-2.5

0.0

2.5

Left Side = 1 : 6.00 Side Slope

Vert. = 1 : 28.72

5.0

7.5

Left Side = -0.025 Super Elevation

Right Side = 1 : 6.00

10.0

12.5

Profile Grade = 38.225

Right Side = -0.025

Ground Section

Road Section

Intersection Points

Sub Areas & Volumes

No. Offset
Level
1
-40.800
38.508

No. Offset
Level
1
-15.200
37.788

No. Offset
Level
1
-11.351
37.675

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
-0.598
0.000
25.000
-33.813
-2.107

2
3
4
5
6

-25.400
-20.000
-10.000
0.000
10.000

38.288
37.930
37.635
37.640
37.280

2
3
4
5
6

-12.935
-11.435
-7.000
-6.500
-6.744

37.411
37.661
38.400
38.388
38.144

7
8
9

20.000
30.000
40.000

37.020
36.930
37.220

7
8
9

-6.944
-7.237
-7.437

38.149
37.856
37.861

10

50.000

36.730

10
11
12
13
14

-7.729
0.000
3.772
3.464
3.264

37.568
37.375
37.281
37.588
37.593

15
16
17

2.956
2.756
2.500

37.901
37.906
38.163

18
19
20
21

3.000
9.000
10.500
12.405

38.150
37.150
36.900
37.217

Consultant ITALCONSULT

Date 10/11/2015

2
3
4

-7.661
3.540
7.729

37.636
37.513
37.362

1
2
3
4
5

0.150
1.518
-0.042
-2.330
0.735

0.905
0.000
0.000
0.000
0.000

12.936
25.000
25.000
25.000
25.000

-1.041
29.700
-80.138
-29.125
9.188

-0.161
0.858
-6.369
0.000
0.000

6
7

0.000
0.000

0.000
0.000

25.000
25.000

0.000
-0.413

0.000
-0.033

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
2.403
0.678
39.792

Total Cut
-2.969
-8.726
-144.529

81.412

-2,266.629

Contractor SAPAC

Page 8

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
3 4

37.8

15
14

87

37.6

1312

37.4
37.2

16 17

65

38.0

10

11

18

37.0
36.8
6

19

36.6

-12.5

-10.0

-7.5

-5.0

Horiz. = 1 : 140.37 Draw Scale

0 + 200.000

Vert. = 1 : 33.79

-2.5

0.0

2.5

Left Side = 1 : 6.00 Side Slope

5.0

7.5

Left Side = -0.025 Super Elevation

Right Side = 1 : 6.00

10.0
Profile Grade = 38.211

Right Side = -0.025

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-50.200
38.470

No. Offset
Level
1
-13.440
37.313

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
0.422
2.183
14.652
-4.381
-0.598

2
3
4
5
6

-34.000
-30.000
-20.000
-10.000
0.000

38.245
37.970
37.490
37.220
36.790

2
3
4
5
6

-11.435
-7.000
-6.500
-6.744
-6.944

37.647
38.386
38.374
38.130
38.135

7
8
9

10.000
20.000
30.000

36.670
36.610
36.690

7
8
9

-7.237
-7.437
-7.729

37.842
37.847
37.554

10
11

40.000
50.000

36.730
36.740

10
11
12
13
14

0.000
3.772
3.464
3.264
2.956

37.361
37.267
37.574
37.579
37.887

15
16
17

2.756
2.500
3.000

37.892
38.149
38.136

18
19

9.000
11.863

37.136
36.659

Consultant ITALCONSULT

Date 10/11/2015

1
2
3
4

3.267
6.097
4.083
1.357

0.000
56.133
0.000
10.419

25.000
6.587
25.000
9.644

61.688
-7.183
69.613
-4.108

1.668
-2.181
1.486
-0.852

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
15.226
2.403
200.036

Total Cut
0.000
-2.969
-15.672

281.447

-2,282.301

Contractor SAPAC

Page 9

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
3 4
65

38.0
37.8

16 17
15
14

87

37.6

1312

37.4

10

37.2

11

37.0
36.8

18
1

36.6

19

-15.0

-12.5

-10.0

-7.5

Horiz. = 1 : 155.73 Draw Scale

0 + 225.000

Vert. = 1 : 35.48

-5.0

-2.5

0.0

Left Side = 1 : 6.00 Side Slope


Right Side = 1 : 6.00

2.5

5.0

7.5

Left Side = -0.025 Super Elevation

10.0

12.5

Profile Grade = 38.197

Right Side = -0.025

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-41.500
38.248

No. Offset
Level
1
-15.649
36.931

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
21.016
0.000
25.000
453.025
15.226

2
3
4
5
6

-40.000
-30.000
-20.000
-10.000
0.000

38.050
37.630
36.970
36.880
36.600

2
3
4
5
6

-11.435
-7.000
-6.500
-6.744
-6.944

37.633
38.372
38.360
38.116
38.121

7
8
9

10.000
20.000
30.000

36.550
36.550
36.530

7
8
9

-7.237
-7.437
-7.729

37.828
37.833
37.540

10
11

40.000
50.000

36.520
36.690

10
11
12
13
14

0.000
3.772
3.464
3.264
2.956

37.347
37.253
37.560
37.565
37.873

15
16
17

2.756
2.500
3.000

37.878
38.135
38.122

18
19

9.000
12.432

37.122
36.550

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
21.016
15.226
453.025

Total Cut
0.000
0.000
0.000

734.472

-2,282.301

Contractor SAPAC

Page 10

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
3 4

38.0

16 17

65

37.8

15
14

87

37.6
2

1312

37.4

10

37.2

11

37.0

18

36.8
1

36.6
36.4

-15.0

-12.5

-10.0

-7.5

Horiz. = 1 : 160.66 Draw Scale

0 + 250.000

19

Vert. = 1 : 37.17

-5.0

-2.5

0.0

Left Side = 1 : 6.00 Side Slope


Right Side = 1 : 6.00

2.5

5.0

7.5

Left Side = -0.025 Super Elevation

10.0

12.5

Profile Grade = 38.183

Right Side = -0.025

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-50.000
37.570

No. Offset
Level
1
-16.298
36.809

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
25.507
0.000
25.000
581.538
21.016

2
3
4
5
6

-40.000
-30.000
-20.000
-10.000
0.000

37.480
36.970
36.990
36.500
36.510

2
3
4
5
6

-11.435
-7.000
-6.500
-6.744
-6.944

37.619
38.358
38.346
38.102
38.107

7
8
9

10.000
20.000
30.000

36.480
36.478
36.480

7
8
9

-7.237
-7.437
-7.729

37.814
37.819
37.526

10
11

40.000
50.000

36.590
36.630

10
11
12
13
14

0.000
3.772
3.464
3.264
2.956

37.333
37.239
37.546
37.551
37.859

15
16
17

2.756
2.500
3.000

37.864
38.121
38.108

18
19

9.000
12.771

37.108
36.479

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
25.507
21.016
581.538

Total Cut
0.000
0.000
0.000

1,316.010

-2,282.301

Contractor SAPAC

Page 11

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
3 4

38.0

16 17

65

37.8

1514

87

37.6
2

37.4

13
12

37.2

10
11

37.0

18

36.8
36.6
36.4

-15.0

-12.5

-10.0

-7.5

Horiz. = 1 : 162.85 Draw Scale

0 + 275.000

19

Vert. = 1 : 38.86

-5.0

-2.5

0.0

Left Side = 1 : 4.00 Side Slope


Right Side = 1 : 6.00

2.5

5.0

7.5

Left Side = -0.024 Super Elevation

10.0

12.5

Profile Grade = 38.168

Right Side = -0.024

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-50.000
37.248

No. Offset
Level
1
-16.026
36.450

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
28.094
0.000
25.000
670.013
25.507

2
3
4
5
6

-40.000
-30.000
-20.000
-10.000
0.000

36.868
36.798
36.478
36.408
36.388

2
3
4
5
6

-11.462
-7.000
-6.500
-6.744
-6.944

37.591
38.335
38.323
38.079
38.083

7
8
9

10.000
20.000
30.000

36.358
36.398
36.448

7
8
9

-7.237
-7.437
-7.730

37.790
37.795
37.502

10
11

40.000
50.000

36.518
36.488

10
11
12
13
14

0.000
3.771
3.463
3.263
2.956

37.318
37.228
37.535
37.540
37.848

15
16
17

2.756
2.500
3.000

37.852
38.108
38.097

18
19

8.951
13.350

37.105
36.371

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
28.094
25.507
670.013

Total Cut
0.000
0.000
0.000

1,986.022

-2,282.301

Contractor SAPAC

Page 12

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
3 4
16 17

65

37.8

1514
87

37.6
37.4

13
12

37.2

10

11

18

37.0
36.8
36.6
36.4

19

-15.0

-12.5

-10.0

-7.5

Horiz. = 1 : 162.31 Draw Scale

0 + 300.000

Vert. = 1 : 37.17

-5.0

-2.5

0.0

2.5

Left Side = 1 : 4.00 Side Slope


Right Side = 1 : 6.00

5.0

7.5

Left Side = -0.017 Super Elevation

10.0

12.5

Profile Grade = 38.154

Right Side = -0.017

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-50.000
36.968

No. Offset
Level
1
-15.797
36.457

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
27.973
0.000
25.000
700.838
28.094

2
3
4
5
6

-40.000
-30.000
-20.000
-10.000
0.000

36.638
36.508
36.478
36.428
36.328

2
3
4
5
6

-11.640
-7.000
-6.500
-6.746
-6.946

37.496
38.270
38.261
38.015
38.019

7
8
9

10.000
20.000
30.000

36.338
36.358
36.338

7
8
9

-7.241
-7.441
-7.736

37.724
37.727
37.432

10
11

40.000
50.000

36.278
36.368

10
11
12
13
14

0.000
3.764
3.459
3.259
2.954

37.304
37.242
37.547
37.550
37.855

15
16
17

2.754
2.500
3.000

37.859
38.113
38.104

18
19

8.661
13.556

37.161
36.345

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
27.973
28.094
700.838

Total Cut
0.000
0.000
0.000

2,686.860

-2,282.301

Contractor SAPAC

Page 13

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
3 4
16 17
65

37.8
37.6

15
14

87
13
12

37.4
2

37.2

10

11

18

37.0
36.8
36.6
36.4
36.2

-15.0

-12.5

-10.0

-7.5

Horiz. = 1 : 168.34 Draw Scale

0 + 325.000

Vert. = 1 : 38.86

-5.0

-2.5

0.0

2.5

Left Side = 1 : 4.00 Side Slope


Right Side = 1 : 6.00

19

5.0

7.5

10.0

Left Side = -0.009 Super Elevation

12.5

15.0

Profile Grade = 38.140

Right Side = -0.009

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-50.000
36.518

No. Offset
Level
1
-16.020
36.352

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
29.867
0.000
25.000
723.000
27.973

2
3
4
5
6

-40.000
-30.000
-20.000
-10.000
0.000

36.438
36.408
36.388
36.298
36.288

2
3
4
5
6

-11.833
-7.000
-6.500
-6.748
-6.948

37.399
38.204
38.200
37.952
37.954

7
8
9

10.000
20.000
30.000

36.248
36.198
36.188

7
8
9

-7.245
-7.445
-7.742

37.657
37.659
37.361

10
11

40.000
50.000

36.238
36.318

10
11
12
13
14

0.000
3.758
3.455
3.255
2.952

37.290
37.255
37.558
37.560
37.863

15
16
17

2.752
2.500
3.000

37.865
38.117
38.112

18
19

8.398
14.316

37.213
36.226

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
29.867
27.973
723.000

Total Cut
0.000
0.000
0.000

3,409.860

-2,282.301

Contractor SAPAC

Page 14

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
3 4

37.8

16 17

65

1514

37.6
87

37.4
37.2

13
12

10

11

18

37.0
36.8
36.6
36.4
36.2

19

-15.0

-12.5

-10.0

-7.5

Horiz. = 1 : 157.37 Draw Scale

0 + 350.000

Vert. = 1 : 37.17

-5.0

-2.5

0.0

Left Side = 1 : 4.00 Side Slope


Right Side = 1 : 4.00

2.5

5.0

7.5

Left Side = -0.002 Super Elevation

10.0

12.5

Profile Grade = 38.126

Right Side = -0.002

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-40.000
36.318

No. Offset
Level
1
-16.062
36.294

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
29.332
0.000
25.000
739.988
29.867

2
3
4
5
6

-30.000
-20.000
-10.000
0.000
10.000

36.308
36.298
36.288
36.218
36.208

2
3
4
5
6

-12.043
-7.000
-6.500
-6.750
-6.950

37.299
38.139
38.138
37.889
37.889

7
8
9

20.000
30.000
40.000

36.198
36.188
36.118

7
8
9

-7.249
-7.449
-7.748

37.590
37.590
37.291

10

50.000

36.088

10
11
12
13
14

0.000
3.752
3.451
3.251
2.950

37.276
37.269
37.569
37.570
37.870

15
16
17

2.750
2.500
3.000

37.871
38.121
38.120

18
19

8.158
12.378

37.261
36.206

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
29.332
29.867
739.988

Total Cut
0.000
0.000
0.000

4,149.847

-2,282.301

Contractor SAPAC

Page 15

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
16 17
3 4

37.8

1514
65

37.6

13
12

37.4

87

37.2
37.0

18

11

10
9

36.8
36.6
36.4
36.2

-17.5

19

-15.0

-12.5

-10.0

Horiz. = 1 : 165.05 Draw Scale

0 + 375.000

Vert. = 1 : 37.17

-7.5

-5.0

-2.5

0.0

Left Side = 1 : 6.00 Side Slope


Right Side = 1 : 4.00

2.5

5.0

7.5

Left Side = 0.013 Super Elevation

10.0

12.5

Profile Grade = 38.112

Right Side = 0.013

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-50.000
36.238

No. Offset
Level
1
-17.510
36.268

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
28.955
0.000
25.000
728.588
29.332

2
3
4
5
6

-40.000
-30.000
-20.000
-10.000
0.000

36.268
36.268
36.278
36.238
36.236

2
3
4
5
6

-12.540
-7.000
-6.500
-6.753
-6.953

37.096
38.019
38.026
37.773
37.770

7
8
9

10.000
20.000
30.000

36.228
36.238
36.128

7
8
9

-7.257
-7.457
-7.761

37.466
37.463
37.159

10
11

40.000
50.000

36.068
36.038

10
11
12
13
14

0.000
3.739
3.443
3.243
2.947

37.262
37.311
37.608
37.605
37.901

15
16
17

2.747
2.500
3.000

37.898
38.145
38.152

18
19

7.725
12.261

37.364
36.230

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
28.955
29.332
728.588

Total Cut
0.000
0.000
0.000

4,878.435

-2,282.301

Contractor SAPAC

Page 16

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
16 17
3 4

37.8

15
14
65

37.6

13
12

37.4

87

37.2
37.0

18

11

10
9

36.8
36.6
36.4
36.2

19
1

-17.5

-15.0

-12.5

-10.0

Horiz. = 1 : 168.34 Draw Scale

0 + 400.000

Vert. = 1 : 38.86

-7.5

-5.0

-2.5

0.0

Left Side = 1 : 6.00 Side Slope


Right Side = 1 : 4.00

2.5

5.0

7.5

Left Side = 0.015 Super Elevation

10.0

12.5

Profile Grade = 38.110

Right Side = 0.015

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-50.000
36.238

No. Offset
Level
1
-17.958
36.179

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
31.221
0.000
25.000
752.200
28.955

2
3
4
5
6

-40.000
-30.000
-20.000
-10.000
0.000

36.248
36.228
36.188
36.144
36.146

2
3
4
5
6

-12.604
-7.000
-6.500
-6.754
-6.954

37.071
38.005
38.013
37.759
37.756

7
8
9

10.000
20.000
30.000

36.178
36.158
36.058

7
8
9

-7.258
-7.458
-7.763

37.451
37.448
37.144

10
11

40.000
50.000

36.068
36.018

10
11
12
13
14

0.000
3.737
3.442
3.242
2.946

37.260
37.316
37.612
37.609
37.904

15
16
17

2.746
2.500
3.000

37.901
38.148
38.155

18
19

7.679
12.487

37.375
36.173

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
31.221
28.955
752.200

Total Cut
0.000
0.000
0.000

5,630.635

-2,282.301

Contractor SAPAC

Page 17

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
16 17
3 4
15
14
65

37.6

13
12

37.4

87

37.2
37.0

18

11

10
9

36.8
36.6
36.4
36.2
36.0

-17.5

-15.0

-12.5

-10.0

Horiz. = 1 : 173.82 Draw Scale

0 + 425.000

Vert. = 1 : 40.55

-7.5

-5.0

-2.5

0.0

Left Side = 1 : 6.00 Side Slope


Right Side = 1 : 4.00

19

2.5

5.0

7.5

Left Side = 0.015 Super Elevation

10.0

12.5

Profile Grade = 38.125

Right Side = 0.015

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-50.000
36.238

No. Offset
Level
1
-18.551
36.095

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
32.846
0.000
25.000
800.838
31.221

2
3
4
5
6

-40.000
-30.000
-20.000
-10.000
0.000

36.138
36.098
36.088
36.138
36.118

2
3
4
5
6

-12.604
-7.000
-6.500
-6.754
-6.954

37.086
38.020
38.028
37.774
37.771

7
8
9

10.000
20.000
30.000

36.118
36.038
35.998

7
8
9

-7.258
-7.458
-7.763

37.466
37.463
37.159

10
11

40.000
50.000

35.988
35.988

10
11
12
13
14

0.000
3.737
3.442
3.242
2.946

37.275
37.331
37.627
37.624
37.919

15
16
17

2.746
2.500
3.000

37.916
38.163
38.170

18
19

7.679
12.859

37.390
36.095

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
32.846
31.221
800.838

Total Cut
0.000
0.000
0.000

6,431.472

-2,282.301

Contractor SAPAC

Page 18

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
16 17
3 4

37.8

15
14

65

37.6

1312

37.4
37.2

87

37.0

18

11

10
9

36.8
36.6
36.4
36.2
36.0

-17.5

-15.0

-12.5

-10.0

-7.5

Horiz. = 1 : 165.05 Draw Scale

0 + 450.000

Vert. = 1 : 45.62

-5.0

-2.5

0.0

Left Side = 1 : 4.00 Side Slope


Right Side = 1 : 4.00

19

2.5

5.0

7.5

Left Side = 0.015 Super Elevation

10.0

12.5

Profile Grade = 38.158

Right Side = 0.015

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-50.000
35.988

No. Offset
Level
1
-16.795
36.071

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
33.698
0.000
25.000
831.800
32.846

2
3
4
5
6

-40.000
-30.000
-20.000
-10.000
0.000

36.118
36.082
36.068
36.078
36.098

2
3
4
5
6

-12.604
-7.000
-6.500
-6.754
-6.954

37.119
38.053
38.061
37.807
37.804

7
8
9

10.000
20.000
30.000

36.113
36.038
35.978

7
8
9

-7.258
-7.458
-7.763

37.499
37.496
37.192

10
11

40.000
50.000

35.938
36.148

10
11
12
13
14

0.000
3.737
3.442
3.242
2.946

37.308
37.364
37.660
37.657
37.952

15
16
17

2.746
2.500
3.000

37.949
38.196
38.203

18
19

7.679
13.010

37.423
36.090

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
33.698
32.846
831.800

Total Cut
0.000
0.000
0.000

7,263.272

-2,282.301

Contractor SAPAC

Page 19

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
16 17
3 4
15
14

37.8

65

37.6

1312
87

37.4
37.2
9

37.0

18

11

10

36.8
36.6
36.4
36.2
36.0

-17.5

-15.0

-12.5

-10.0

-7.5

Horiz. = 1 : 168.89 Draw Scale

0 + 475.000

Vert. = 1 : 45.62

-5.0

-2.5

0.0

Left Side = 1 : 4.00 Side Slope


Right Side = 1 : 4.00

19

2.5

5.0

7.5

Left Side = 0.015 Super Elevation

10.0

12.5

Profile Grade = 38.209

Right Side = 0.015

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-50.000
36.168

No. Offset
Level
1
-16.907
36.094

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
36.359
0.000
25.000
875.713
33.698

2
3
4
5
6

-40.000
-30.000
-20.000
-10.000
0.000

36.163
36.148
36.088
36.108
36.028

2
3
4
5
6

-12.604
-7.000
-6.500
-6.754
-6.954

37.170
38.104
38.112
37.858
37.855

7
8
9

10.000
20.000
30.000

36.018
35.998
36.088

7
8
9

-7.258
-7.458
-7.763

37.550
37.547
37.243

10
11

40.000
50.000

36.128
36.158

10
11
12
13
14

0.000
3.737
3.442
3.242
2.946

37.359
37.415
37.711
37.708
38.003

15
16
17

2.746
2.500
3.000

38.000
38.247
38.254

18
19

7.679
13.532

37.474
36.011

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
36.359
33.698
875.713

Total Cut
0.000
0.000
0.000

8,138.985

-2,282.301

Contractor SAPAC

Page 20

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
1617
3 4

37.8
37.6
37.4
37.2

1312
87
9

19

-17.5

18

11

10

37.0
36.8
36.6
36.4
36.2
36.0

15
14

65

-15.0

-12.5

-10.0

-7.5

Horiz. = 1 : 172.18 Draw Scale

0 + 500.000

Vert. = 1 : 47.31

-5.0

-2.5

0.0

Left Side = 1 : 4.00 Side Slope


Right Side = 1 : 4.00

2.5

5.0

7.5

Left Side = 0.015 Super Elevation

10.0

12.5

Profile Grade = 38.278

Right Side = 0.015

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-50.000
36.145

No. Offset
Level
1
-17.256
36.076

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
40.131
0.000
25.000
956.125
36.359

2
3
4
5
6

-40.000
-30.000
-20.000
-10.000
0.000

36.148
36.093
36.098
36.018
35.968

2
3
4
5
6

-12.604
-7.000
-6.500
-6.754
-6.954

37.239
38.173
38.181
37.927
37.924

7
8
9

10.000
20.000
30.000

35.988
36.038
36.188

7
8
9

-7.258
-7.458
-7.763

37.619
37.616
37.312

10
11

40.000
50.000

36.218
36.338

10
11
12
13
14

0.000
3.737
3.442
3.242
2.946

37.428
37.484
37.780
37.777
38.072

15
16
17

2.746
2.500
3.000

38.069
38.316
38.323

18
19

7.679
13.823

37.543
36.007

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
40.131
36.359
956.125

Total Cut
0.000
0.000
0.000

9,095.110

-2,282.301

Contractor SAPAC

Page 21

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
16 17
3 4

38.0

15
14
65

37.8

1312

37.6
37.4

87

37.2

18

11

10
9

37.0
36.8
36.6
36.4

19

36.2

-17.5

-15.0

-12.5

-10.0

-7.5

Horiz. = 1 : 166.14 Draw Scale

0 + 525.000

Vert. = 1 : 45.62

-5.0

-2.5

0.0

Left Side = 1 : 4.00 Side Slope


Right Side = 1 : 4.00

2.5

5.0

7.5

Left Side = 0.015 Super Elevation

10.0

12.5

Profile Grade = 38.364

Right Side = 0.015

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-50.000
36.162

No. Offset
Level
1
-17.028
36.219

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
34.758
0.000
25.000
936.113
40.131

2
3
4
5
6

-40.000
-30.000
-20.000
-10.000
0.000

36.238
36.378
36.228
36.198
36.315

2
3
4
5
6

-12.604
-7.000
-6.500
-6.754
-6.954

37.325
38.259
38.267
38.013
38.010

7
8
9

10.000
20.000
30.000

36.278
36.398
36.393

7
8
9

-7.258
-7.458
-7.763

37.705
37.702
37.398

10
11

40.000
50.000

36.378
36.198

10
11
12
13
14

0.000
3.737
3.442
3.242
2.946

37.514
37.570
37.866
37.863
38.158

15
16
17

2.746
2.500
3.000

38.155
38.402
38.409

18
19

7.679
12.942

37.629
36.313

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
34.758
40.131
936.113

Total Cut
0.000
0.000
0.000

10,031.222

-2,282.301

Contractor SAPAC

Page 22

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
16 17
3 4

38.0
37.8

14
15

65
13
12
87

37.6

18

11

10

37.4
37.2

37.0
36.8
36.6
36.4
36.2
-17.5

19

-15.0

-12.5

-10.0

-7.5

Horiz. = 1 : 165.05 Draw Scale

0 + 550.000

Vert. = 1 : 45.62

-5.0

-2.5

0.0

Left Side = 1 : 4.00 Side Slope


Right Side = 1 : 4.00

2.5

5.0

7.5

Left Side = 0.015 Super Elevation

10.0

12.5

Profile Grade = 38.468

Right Side = 0.015

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-50.000
36.258

No. Offset
Level
1
-16.800
36.380

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
33.018
0.000
25.000
847.200
34.758

2
3
4
5
6

-40.000
-30.000
-20.000
-10.000
0.000

36.298
36.328
36.348
36.448
36.428

2
3
4
5
6

-12.604
-7.000
-6.500
-6.754
-6.954

37.429
38.363
38.371
38.117
38.114

7
8
9

10.000
20.000
30.000

36.418
36.388
36.188

7
8
9

-7.258
-7.458
-7.763

37.809
37.806
37.502

10
11

40.000
50.000

36.068
35.898

10
11
12
13
14

0.000
3.737
3.442
3.242
2.946

37.618
37.674
37.970
37.967
38.262

15
16
17

2.746
2.500
3.000

38.259
38.506
38.513

18
19

7.679
12.975

37.733
36.409

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
33.018
34.758
847.200

Total Cut
0.000
0.000
0.000

10,878.422

-2,282.301

Contractor SAPAC

Page 23

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
1617
3 4

15
14

38.2
65

38.0
37.8
37.6

1312
87
2

37.4
37.2
37.0
36.8
36.6
36.4
36.2

-17.5

18

11

10

-15.0

-12.5

-10.0

-7.5

Horiz. = 1 : 172.18 Draw Scale

0 + 575.000

19

Vert. = 1 : 47.31

-5.0

-2.5

0.0

Left Side = 1 : 4.00 Side Slope


Right Side = 1 : 4.00

2.5

5.0

7.5

Left Side = 0.015 Super Elevation

10.0

12.5

Profile Grade = 38.590

Right Side = 0.015

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-50.000
36.526

No. Offset
Level
1
-17.260
36.387

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
37.425
0.000
25.000
880.538
33.018

2
3
4
5
6

-40.000
-30.000
-20.000
-10.000
0.000

36.628
36.708
36.398
36.358
36.483

2
3
4
5
6

-12.604
-7.000
-6.500
-6.754
-6.954

37.551
38.485
38.493
38.239
38.236

7
8
9

10.000
20.000
30.000

36.368
36.198
35.978

7
8
9

-7.258
-7.458
-7.763

37.931
37.928
37.624

10
11

40.000
50.000

35.818
35.638

10
11
12
13
14

0.000
3.737
3.442
3.242
2.946

37.740
37.796
38.092
38.089
38.384

15
16
17

2.746
2.500
3.000

38.381
38.628
38.635

18
19

7.679
13.892

37.855
36.302

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
37.425
33.018
880.538

Total Cut
0.000
0.000
0.000

11,758.960

-2,282.301

Contractor SAPAC

Page 24

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
1617
3 4

15
14

65

38.0
37.8
37.6
37.4
37.2
37.0
36.8
36.6
36.4
36.2
36.0
35.8

12
13
87

18

11

10

5
6

19

-17.5

-15.0

-12.5

-10.0

-7.5

Horiz. = 1 : 188.63 Draw Scale

0 + 600.000

Vert. = 1 : 57.45

-5.0

-2.5

0.0

2.5

Left Side = 1 : 4.00 Side Slope


Right Side = 1 : 4.00

5.0

7.5

10.0

Left Side = 0.015 Super Elevation

12.5

15.0

Profile Grade = 38.735

Right Side = 0.015

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-50.000
36.568

No. Offset
Level
1
-17.957
36.358

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
50.240
0.000
25.000 1095.813
37.425

2
3
4
5
6

-40.000
-30.000
-20.000
-10.000
0.000

36.398
36.348
36.368
36.318
36.138

2
3
4
5
6

-12.604
-7.000
-6.500
-6.754
-6.954

37.696
38.630
38.638
38.384
38.381

7
8
9

10.000
20.000
30.000

35.948
35.828
35.768

7
8
9

-7.258
-7.458
-7.763

38.076
38.073
37.769

10
11

40.000
50.000

35.708
35.568

10
11
12
13
14

0.000
3.737
3.442
3.242
2.946

37.885
37.941
38.237
38.234
38.529

15
16
17

2.746
2.500
3.000

38.526
38.773
38.780

18
19

7.679
16.184

38.000
35.874

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
50.240
37.425
1,095.813

Total Cut
0.000
0.000
0.000

12,854.772

-2,282.301

Contractor SAPAC

Page 25

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
1617
3 4

15
14

65

38.2
38.0
37.8
37.6
37.4
37.2
37.0
36.8
36.6
36.4
36.2
36.0
35.8

13
12
87

18

11

10

1
5

19
7

-17.5

-15.0

-12.5

-10.0

-7.5

Horiz. = 1 : 197.40 Draw Scale

0 + 625.000

Vert. = 1 : 59.14

-5.0

-2.5

0.0

2.5

Left Side = 1 : 4.00 Side Slope


Right Side = 1 : 4.00

5.0

7.5

10.0

12.5

Left Side = 0.015 Super Elevation

15.0

17.5

Profile Grade = 38.888

Right Side = 0.015

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-50.000
36.756

No. Offset
Level
1
-18.015
36.496

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
56.825
0.000
25.000 1338.313
50.240

2
3
4
5
6

-40.000
-30.000
-20.000
-10.000
0.000

36.636
36.629
36.546
36.296
36.186

2
3
4
5
6

-12.604
-7.000
-6.500
-6.754
-6.954

37.849
38.783
38.791
38.537
38.534

7
8
9

10.000
20.000
30.000

35.946
35.936
35.696

7
8
9

-7.258
-7.458
-7.763

38.229
38.226
37.922

10
11

40.000
50.000

35.656
35.586

10
11
12
13
14

0.000
4.740
4.445
4.245
3.949

38.038
38.109
38.405
38.402
38.697

15
16
17

3.749
3.503
4.003

38.694
38.941
38.948

18
19

8.682
17.601

38.168
35.938

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
56.825
50.240
1,338.313

Total Cut
0.000
0.000
0.000

14,193.085

-2,282.301

Contractor SAPAC

Page 26

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
1617
15
14

34
65

38.2
38.0
37.8
37.6
37.4
37.2
37.0
36.8
36.6
36.4
36.2
36.0
35.8
35.6

13
12

87

18

11

10

4 1

6
19
8

-20.0

-17.5

-15.0

-12.5

-10.0

-7.5

Horiz. = 1 : 216.59 Draw Scale

0 + 650.000

Vert. = 1 : 65.90

-5.0

-2.5

0.0

2.5

Left Side = 1 : 4.00 Side Slope


Right Side = 1 : 4.00

5.0

7.5

10.0

12.5

Left Side = 0.022 Super Elevation

15.0

17.5

20.0

Profile Grade = 39.063

Right Side = 0.022

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-50.000
36.786

No. Offset
Level
1
-19.260
36.334

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
67.650
0.000
25.000 1555.938
56.825

2
3
4
5
6

-40.000
-30.000
-20.000
-10.000
0.000

36.686
36.539
36.331
36.368
36.106

2
3
4
5
6

-12.875
-7.000
-6.500
-6.756
-6.956

37.930
38.909
38.920
38.665
38.660

7
8
9

10.000
20.000
30.000

35.846
35.736
35.666

7
8
9

-7.262
-7.462
-7.769

38.353
38.349
38.042

10
11

40.000
50.000

35.660
35.566

10
11
12
13
14

0.000
5.450
5.156
4.956
4.663

38.213
38.333
38.626
38.622
38.915

15
16
17

4.463
4.218
4.718

38.911
39.156
39.167

18
19

9.224
19.940

38.416
35.737

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
67.650
56.825
1,555.938

Total Cut
0.000
0.000
0.000

15,749.022

-2,282.301

Contractor SAPAC

Page 27

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
1617
15
14

3 4
65

38.4
38.2
38.0
37.8
37.6
37.4
37.2
37.0
36.8
36.6
36.4
36.2
36.0
35.8
35.6
35.4

13
12
11

87
9

-20.0

-17.5

-15.0

-12.5

-10.0

Horiz. = 1 : 221.53 Draw Scale

0 + 675.000

18

10

Vert. = 1 : 74.35

19

-7.5

-5.0

-2.5

0.0

2.5

Left Side = 1 : 4.00 Side Slope


Right Side = 1 : 3.00

5.0

7.5

10.0

12.5

Left Side = 0.025 Super Elevation

15.0

17.5

Profile Grade = 39.256

Right Side = 0.025

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-50.000
36.386

No. Offset
Level
1
-21.126
36.050

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
85.125
0.000
25.000 1909.688
67.650

2
3
4
5
6

-40.000
-30.000
-20.000
-10.000
0.000

36.336
36.156
36.036
35.946
35.776

2
3
4
5
6

-13.000
-7.000
-6.500
-6.756
-6.956

38.081
39.081
39.094
38.837
38.832

7
8
9

10.000
20.000
30.000

35.636
35.626
35.546

7
8
9

-7.264
-7.464
-7.772

38.524
38.519
38.212

10
11

40.000
50.000

35.436
35.526

10
11
12
13
14

0.000
6.202
5.910
5.710
5.417

38.406
38.561
38.854
38.849
39.141

15
16
17

5.217
4.973
5.473

39.136
39.380
39.393

18
19

9.908
18.988

38.654
35.627

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
85.125
67.650
1,909.688

Total Cut
0.000
0.000
0.000

17,658.710

-2,282.301

Contractor SAPAC

Page 28

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
1617
15
14
13
12
11

34
65

38.6
38.4
38.2
38.0
37.8
37.6
37.4
37.2
37.0
36.8
36.6
36.4
36.2
36.0
35.8
35.6
35.4

87
9

-22.5

-20.0

-17.5

-15.0

-12.5

-10.0

Horiz. = 1 : 235.78 Draw Scale

0 + 700.000

Vert. = 1 : 79.42

18

10

-7.5

-5.0

-2.5

0.0

2.5

Left Side = 1 : 4.00 Side Slope


Right Side = 1 : 3.00

19

5.0

7.5

10.0

12.5

Left Side = 0.025 Super Elevation

15.0

17.5

20.0

Profile Grade = 39.468

Right Side = 0.025

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-50.000
36.186

No. Offset
Level
1
-21.988
36.046

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
97.491
0.000
25.000 2282.700
85.125

2
3
4
5
6

-40.000
-30.000
-20.000
-10.000
0.000

36.146
36.086
36.036
35.866
35.816

2
3
4
5
6

-13.000
-7.000
-6.500
-6.756
-6.956

38.293
39.293
39.306
39.049
39.044

7
8
9

10.000
20.000
30.000

35.676
35.606
35.586

7
8
9

-7.264
-7.464
-7.772

38.736
38.731
38.424

10
11

40.000
50.000

35.606
35.546

10
11
12
13
14

0.000
7.226
6.934
6.734
6.441

38.618
38.799
39.091
39.086
39.379

15
16
17

6.241
5.997
6.497

39.374
39.618
39.630

18
19

10.932
20.792

38.891
35.604

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
97.491
85.125
2,282.700

Total Cut
0.000
0.000
0.000

19,941.410

-2,282.301

Contractor SAPAC

Page 29

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line

38.8
38.6
38.4
38.2
38.0
37.8
37.6
37.4
37.2
37.0
36.8
36.6
36.4
36.2
36.0
35.8
35.6

1617
15
14
13
12

34
65
87
2

-22.5

-20.0

-17.5

-15.0

-12.5

-10.0

Horiz. = 1 : 252.23 Draw Scale

0 + 725.000

18

11

10

Vert. = 1 : 79.42

-7.5

-5.0

-2.5

0.0

2.5

Left Side = 1 : 4.00 Side Slope


Right Side = 1 : 3.00

19

5.0

7.5

10.0

12.5

15.0

Left Side = 0.025 Super Elevation

17.5

20.0

22.5

Profile Grade = 39.696

Right Side = 0.012

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-50.000
36.146

No. Offset
Level
1
-23.143
35.985

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
110.882
0.000
25.000 2604.663
97.491

2
3
4
5
6

-40.000
-30.000
-20.000
-10.000
0.000

36.276
36.136
35.916
35.886
35.811

2
3
4
5
6

-13.000
-7.000
-6.500
-6.756
-6.956

38.521
39.521
39.534
39.277
39.272

7
8
9

10.000
20.000
30.000

35.746
35.716
35.726

7
8
9

-7.264
-7.464
-7.772

38.964
38.959
38.652

10
11

40.000
50.000

35.716
35.706

10
11
12
13
14

0.000
8.740
8.443
8.243
7.947

38.846
38.951
39.247
39.245
39.541

15
16
17

7.747
7.500
8.000

39.539
39.786
39.792

18
19

12.758
22.599

38.999
35.719

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
110.882
97.491
2,604.663

Total Cut
0.000
0.000
0.000

22,546.072

-2,282.301

Contractor SAPAC

Page 30

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
3 4
65
87

38.8
38.6
38.4
38.2
38.0
37.8
37.6
37.4
37.2
37.0
36.8
36.6
36.4
36.2
36.0
35.8
35.6

-25.0

-22.5

-20.0

-17.5

Horiz. = 1 : 149.15 Draw Scale

0 + 750.000

Vert. = 1 : 77.73

-15.0

-12.5

13

-10.0

Left Side = 1 : 4.00 Side Slope


Right Side = Vert.

12

11
10

-7.5

-5.0

-2.5

Left Side = 0.025 Super Elevation

0.0

2.5

Profile Grade = 39.943

Right Side = 0.025

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-50.000
36.376

No. Offset
Level
1
-24.393
35.977

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
66.298
0.000
25.000 2214.750
110.882

2
3
4
5
6

-40.000
-30.000
-20.000
-10.000
0.000

36.076
35.966
35.986
35.916
35.866

2
3
4
5
6

-13.255
-7.255
-6.755
-7.011
-7.211

38.762
39.762
39.774
39.518
39.513

7
8
9

10.000
20.000
30.000

35.816
35.726
35.686

7
8
9

-7.519
-7.719
-8.027

39.205
39.200
38.892

10
11

40.000
50.000

35.646
35.616

10
11
12
13

0.000
0.000
2.500
2.500

39.093
39.093
39.155
35.854

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
66.298
110.882
2,214.750

Total Cut
0.000
0.000
0.000

24,760.822

-2,282.301

Contractor SAPAC

Page 31

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line

39.0
38.8
38.6
38.4
38.2
38.0
37.8
37.6
37.4
37.2
37.0
36.8
36.6
36.4
36.2
36.0
35.8
35.6
35.4

34
65
87
9

-22.5

-20.0

-17.5

-15.0

-12.5

-10.0

Horiz. = 1 : 235.23 Draw Scale

0 + 775.000

10

Vert. = 1 : 89.55

1617
15
14
13
12
11

18

19

-7.5

-5.0

-2.5

0.0

Left Side = 1 : 3.00 Side Slope


Right Side = 1 : 3.00

2.5

5.0

7.5

10.0

12.5

Left Side = 0.018 Super Elevation

15.0

17.5

20.0

Profile Grade = 40.207

Right Side = 0.018

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-60.000
36.366

No. Offset
Level
1
-23.384
35.886

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
119.070
0.000
25.000 2317.100
66.298

2
3
4
5
6

-50.000
-40.000
-30.000
-20.000
-10.000

36.486
36.006
35.926
35.866
35.786

2
3
4
5
6

-13.717
-7.987
-7.487
-7.742
-7.942

39.105
40.060
40.070
39.815
39.811

7
8
9

0.000
10.000
20.000

35.666
35.616
35.626

7
8
9

-8.247
-8.447
-8.753

39.506
39.502
39.196

10
11
12

30.000
40.000
50.000

35.566
35.436
35.576

10
11
12
13
14

0.000
3.735
3.440
3.240
2.946

39.357
39.425
39.720
39.716
40.011

15
16
17

2.746
2.500
3.000

40.007
40.253
40.262

18
19

7.594
19.208

39.496
35.625

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
119.070
66.298
2,317.100

Total Cut
0.000
0.000
0.000

27,077.922

-2,282.301

Contractor SAPAC

Page 32

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line

39.2
39.0
38.8
38.6
38.4
38.2
38.0
37.8
37.6
37.4
37.2
37.0
36.8
36.6
36.4
36.2
36.0
35.8
35.6

34
65
87
9

-25.0

-22.5

-20.0

-17.5

-15.0

-12.5

Horiz. = 1 : 244.01 Draw Scale

0 + 800.000

10

Vert. = 1 : 91.24

-10.0

1617
15
14
13
12
11

18

19

-7.5

-5.0

-2.5

0.0

Left Side = 1 : 3.00 Side Slope


Right Side = 1 : 3.00

2.5

5.0

7.5

10.0

12.5

Left Side = 0.006 Super Elevation

15.0

17.5

Profile Grade = 40.478

Right Side = 0.006

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-60.000
36.086

No. Offset
Level
1
-24.677
36.006

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
129.263
0.000
25.000 3104.163
119.070

2
3
4
5
6

-50.000
-40.000
-30.000
-20.000
-10.000

36.036
36.016
36.086
35.936
35.836

2
3
4
5
6

-14.045
-8.762
-8.262
-8.513
-8.713

39.547
40.427
40.430
40.179
40.178

7
8
9

0.000
10.000
20.000

35.856
35.776
35.786

7
8
9

-9.015
-9.215
-9.517

39.876
39.875
39.573

10
11
12

30.000
40.000
50.000

35.826
35.936
35.646

10
11
12
13
14

0.000
3.745
3.447
3.247
2.949

39.628
39.650
39.948
39.947
40.245

15
16
17

2.749
2.500
3.000

40.244
40.492
40.495

18
19

7.929
19.594

39.674
35.786

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
129.263
119.070
3,104.163

Total Cut
0.000
0.000
0.000

30,182.085

-2,282.301

Contractor SAPAC

Page 33

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
34
65
2

39.4
39.2
39.0
38.8
38.6
38.4
38.2
38.0
37.8
37.6
37.4
37.2
37.0
36.8
36.6
36.4
36.2
36.0
35.8
35.6
35.4

-25.0

-22.5

-20.0

-17.5

-15.0

-12.5

Horiz. = 1 : 259.36 Draw Scale

0 + 825.000

Vert. = 1 : 103.07

87
9

10

-10.0

-7.5

-5.0

-2.5

0.0

Left Side = 1 : 3.00 Side Slope


Right Side = 1 : 3.00

1617
15
14
13
12
11

18

19

2.5

5.0

7.5

10.0

12.5

Left Side = -0.007 Super Elevation

15.0

17.5

20.0

Profile Grade = 40.748

Right Side = -0.007

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-60.000
36.306

No. Offset
Level
1
-26.255
36.053

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
140.799
0.000
25.000 3375.775
129.263

2
3
4
5
6

-50.000
-40.000
-30.000
-20.000
-10.000

36.286
36.036
36.016
36.116
36.096

2
3
4
5
6

-14.393
-9.540
-9.040
-9.286
-9.486

40.004
40.812
40.809
40.563
40.565

7
8
9

0.000
10.000
20.000

35.966
35.846
35.706

7
8
9

-9.781
-9.981
-10.276

40.269
40.271
39.976

10
11
12
13

30.000
40.000
50.000
60.000

35.596
35.516
35.506
35.486

10
11
12
13
14

0.000
3.765
3.459
3.259
2.954

39.898
39.864
40.169
40.170
40.475

15
16
17

2.754
2.500
3.000

40.477
40.731
40.728

18
19

8.370
20.776

39.833
35.697

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
140.799
129.263
3,375.775

Total Cut
0.000
0.000
0.000

33,557.860

-2,282.301

Contractor SAPAC

Page 34

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line
34
65
87
9

39.8
39.6
39.4
39.2
39.0
38.8
38.6
38.4
38.2
38.0
37.8
37.6
37.4
37.2
37.0
36.8
36.6
36.4
36.2
36.0
35.8
35.6

-27.5 -25.0 -22.5

-20.0 -17.5 -15.0

-12.5 -10.0 -7.5

Horiz. = 1 : 268.68 Draw Scale

0 + 850.000

10

Vert. = 1 : 106.45

1617
15
14
13
12
11

18

-5.0

-2.5

0.0

Left Side = 1 : 3.00 Side Slope


Right Side = 1 : 3.00

19

2.5

5.0

7.5

10.0

12.5

Left Side = -0.019 Super Elevation

15.0

17.5

20.0

Profile Grade = 41.019

Right Side = -0.019

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-50.000
36.276

No. Offset
Level
1
-27.502
36.256

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
151.994
0.000
25.000 3659.913
140.799

2
3
4
5
6

-40.000
-30.000
-20.000
-10.000
0.000

36.336
36.286
36.166
36.196
36.186

2
3
4
5
6

-14.887
-10.318
-9.818
-10.063
-10.263

40.457
41.218
41.209
40.963
40.967

7
8
9

10.000
20.000
30.000

36.036
35.886
35.736

7
8
9

-10.557
-10.757
-11.052

40.673
40.677
40.383

10
11

40.000
50.000

35.646
35.506

10
11
12
13
14

0.000
3.767
3.461
3.261
2.955

40.169
40.096
40.402
40.406
40.712

15
16
17

2.755
2.500
3.000

40.716
40.971
40.961

18
19

8.770
21.162

39.999
35.869

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
151.994
140.799
3,659.913

Total Cut
0.000
0.000
0.000

37,217.772

-2,282.301

Contractor SAPAC

Page 35

INTERCHANGE 128+129.57 (LEG # 01)


0+000 TO 0+862.743
Center Line

34
65
87
9

40.0
39.8
39.6
39.4
39.2
39.0
38.8
38.6
38.4
38.2
38.0
37.8
37.6
37.4
37.2
37.0
36.8
36.6
36.4
36.2
36.0
35.8 4 1
5
6
35.6
-30.0 -27.5 -25.0 -22.5 -20.0 -17.5 -15.0 -12.5 -10.0 -7.5
Horiz. = 1 : 274.71 Draw Scale

0 + 862.743

Vert. = 1 : 108.14

10

1617
15
14
13
12
11

18

-5.0

-2.5

0.0

Left Side = 1 : 3.00 Side Slope


Right Side = 1 : 3.00

19
9

2.5

5.0

7.5

10.0

12.5

Left Side = -0.026 Super Elevation

15.0

17.5

20.0

Profile Grade = 41.157

Right Side = -0.026

Ground Section

Road Section

Sub Areas & Volumes

No. Offset
Level
1
-60.000
38.933

No. Offset
Level
1
-29.072
36.031

Current Section
Previous Section
No. Area
Volume
Distance Volume
Area
0
166.677
0.000
12.743 2030.412
151.994

2
3
4
5
6

-50.000
-40.000
-30.000
-20.000
-10.000

36.056
36.096
36.036
35.986
35.936

2
3
4
5
6

-15.070
-10.651
-10.151
-10.395
-10.595

40.694
41.431
41.418
41.174
41.179

7
8
9

0.000
10.000
20.000

36.086
35.996
36.166

7
8
9

-10.887
-11.087
-11.380

40.887
40.892
40.599

10
11
12
13
14

30.000
40.000
50.000
60.000
70.000

36.236
36.116
36.166
37.800
37.785

10
11
12
13
14

0.000
3.772
3.465
3.265
2.957

40.307
40.210
40.518
40.523
40.831

15
16
17

2.757
2.500
3.000

40.836
41.093
41.080

18
19

9.030
20.741

40.075
36.171

Consultant ITALCONSULT

Date 10/11/2015

Total Areas & Volumes


Curr. Sec. Area
Prev. Sec. Area
Intermediate vol.
Accum. Volumes

Total Fill
166.677
151.994
2,030.412

Total Cut
0.000
0.000
0.000

39,248.185

-2,282.301

Contractor SAPAC

Page 36

You might also like