Inputs to MRP
MRP requires the following info:
1. Master Production Schedule
2. Specifications or Bill of Material
3. Inventory availability
4. Lead times
5. Lot sizing
6. Safety stock

BOM Example
Level

Product structure for Awesome (A)

Std. 12 Speaker kit w/

B(2) Std. 12 Speaker kit

E(2)

D(2)

Lead times:
A-1; B-2; C-1;
D-1;E-2;F-3;G-2

C(3) amp-booster

F(2) Std. 12 Speaker

E(2)
Packing box and
installation kit of wire,
bolts, and screws

booster assembly

G(1)

D(2)

Amp-booster
12 Speaker

12 Speaker

Materials
Requirement Plan

Materials
Requirement Plan