OVERVIEW OF PIPING LAYOUT

1 What is Piping Layout? (Purpose of Piping Layout)

To determine the following:

a. Equipment Layout
b. Construction & Structure (configuration & elevation)
c. Equipment (vessel) nozzle orientation, platform, lug & ladder (location &
configuration)
d. Piping Arrangement (line routing, location of piping component & instrument)
e. Electrical/ Instrument cable layout, location local panel, junction boxer lighting, etc.
f. Location of buried piping & drip funnels.

2 Related Work for Piping Layout

a. Plot Plan Preparation


b. Design Info Preparation
c. Piping Strength Analysis
d. Piping Material Take-off
e. Piping Drawing Preparation

3 Data Gathering & Verification

a. Collect necessary Documents


b. Verify Accuracy

4 Preparation of Basic Piping Layout Plan

a. Piping Conceptual Routing


b. Equipment Layout
c. Civil/Structure Formation
d. Valve & Instrument Assembly
e. Electrical/Instrument Cable Routing
f. Fire Escape Routes/ Maintenance Area

5 Preparation of Breakdown of Piping Layout

a. By Facilities
b. By Section of Facilities
c. By Structure
d. By Unit

6 Determination of Area of Priority


a. Tight Schedule for Design Info. Issuance
b. Some connection with other company (Hook-Up)
c. Plot Plan to Fix Early
d. Complete Set of Documents
e. Having Lines w/ High Temperature: High Pressure (material to be use is high Grade
(special) material & Large Size)
f. Piping Material to be Ordered Early

7 Preparation of Piping Layout

7.1 Piping Design Input Data   (Before layout preparation)

a. Plot Plan
b. Process Flow Diagram, Piping & Instrument Diagram & Utility Flow Diagram
c. Line Index
d. Client Standard
e. Piping Material Specification (line classes)
f. Equipment Skeleton Drawing (Pressure vessel except H/E)   
g. Piping General Specifications
h. Standard Drawing (standard pipe support, max. supporting span, & typical detail
i. Existing Job Ref. Vendor Catalog (pump/comp.)
j. Instrument Data Sheet Dwg & Catalog
k. Data Sheet (H/E)
l. Vendor Catalog/ Existing Job Ref.
m. Layout Procedure

7.2 Piping Design Input Data   (During layout preparation)

7.2.1 Supplied from instrument department

a. Cable Routing (main/ pipe rack/sub pipe rack & sleeper)


b. Vendor Drawings
c. Tie-in Dimension List
d. Air Supply Tapping Point
e. Piping/Instrument Split of Work

7.2.2 Supplied from Electrical Department

> Cable Routing (main/ pipe rack/sub pipe rack & sleeper)

7.2.3 Supplied from Fire Fighting Section

a. P & ID
b. General Arrangement
c. Typical Detail (Hydrant; monitor)
d. Vendor Drawings
7.2.4 Supplied from Package Department

a. Package Equipment Vendor Drawing


b. Package P & ID

7.2.5 Supplied from Piping Department

a. Piping Special Component Vendor Drawing


b. LC/LG Arrangement

7.2.6 Supplied from Civil Department

> Site Grading Plan

7.3 Piping Design Output Data   (During layout preparation)

7.3.1 Supply to Equipment Department

a. Equipment Installation Height


b. Nozzle Orientation
c. Platform & Ladder
d. Support Lug
e. LG/LC Arrangement
f. Nozzle Force & Moment

7.3.2 Supply to Civil/ Structural Department

a. Equipment Installation Height


b. Pipe Rack
c. Structure
d. Table Top
e. Sleeper
f. Pump Foundation
g. Pipe Support
h. Drip Funnel Location
i. Operating Platform (Misc.)
j. Pipe Trench
k. Embedded Plate
l. U/G Pressure Piping Layout
m. Spill Wall
n. Pit Information
o. Pit Support Foundation Location

7.3.3 Supply to Instrument Department


a. LG/Visual Direction
b. LC Visual Direction
c. CV Direction

7.3.4 Supply to Furnace (Optional)

a. Platform & Stair or Ladder


b. Pipe Support
c. Burner Orientation

7.3.5 Supply to Package Equipment (Optional)

> Package Unit Orientation

7.3.6 Supply to Rotary

> Rotary Machine Orientation

7.4 Piping Design Output Data   (After layout preparation)

> Final Piping Layout

8 Checking of Piping Layout