You are on page 1of 1

0.

00
40
Suling-suling

360

240

Suling-suling
40

100

110

235

Pas. Batu

Suling-suling

320

Suling-suling
170
Suling-suling

RINGBALK - 3

Tanah Asli

ROOFTANK
EL.+ 11.250

RINGBALK -1
EL.+ 10.750

LANTAI DAK
EL.+ 9.750

3.20

1.00 0.50 1.20

EL.+ 12.450

120

RINGBALK - 2

95

2.80

EL.+ 15.250

Pas. Batu
Lantai kerja t=10cm

LANTAI 3

3.20

EL.+ 6.550

200

LANTAI 2

3.40

EL.+ 3.350

0.30
0.40

2.00

2.00

0.40

0.00

LANTAI DASAR EL.+ 0.050

- 0.100
ELEVASI - 0.450

ELEVASI - 0.450

- 0.83

5.63

6.50

3.40

0.40

-0.83 (Existing)

1.10 0.50
1.70

4.00

0.50 1.10

- 6.50
- 7.15

4.25

BIDANG
PERSAMAAN + 90.00

4.25

4.25

2.40

5.65

4.40

A'

ELEVASI EXISTING

JARAK

10.80

2.80

10.20

12.20

CROSS SECTION AS.15


SKALA HORISONTAL, 1 : 200
0 0.5 1

12/22/2015 9:53:12 AM

SKALA VERTIKAL, 1 : 200


6

10

0 0.5 1

10

Pasir alas t=5cm

You might also like