System which we are following Interaction between department including gurgaon and Sweden Control of documents Control of records Quality policy Quality objectives Jog description MR Departmental communication Purchasing Incoming Production Special process Welding Painting Galvanizing Identification and traceability for cut parts, welding, lifting lug, painting Product preservation up to despatch Inward material storage Finished product storage Material handing Protection Packing Calibration Measurement, Analysis and Improvement 2) Drawing First angle projection: Other companies following third angle projection Welding symbol as per ISO 2553 Referring cut section which is typical in camfil drawings Referring special notes given in mechanical assembly drawings which is typical in camfil drawings Verifying BOM for completeness 3) Standards: ASME II A & C, ASME V, ASME VIII, ASME IX Material: IS 2062, 808, 1852 & EN 10025 part 1, 2 ASME B 16.5, 16.9, 16.11 SA 500, 106, 312 IS 1239, SA 240, 312, 480, 500, 105, 234, 182, 479, 700, 999, 370 Fasteners: A4-70, A2-70 ASTM F 193, 194, 593, 594 HDG: ISO 1461 & ASTM A 123 Gasket:
ASTM 1056 RE 41, 42, 43
Pre cut parts: ISO 2768 class C Fabrication: ISO 13920 General class BH, Flanges class F Weld defects: ISO 5817 general class C, lifting points class B Painting: ISO 19840 Pickling: ASTM A 967 4) Inward Technical specification MIR MTC register 5) Pre fit up Change over process Identification and Traceability Best practices SS sensitivity Tools identification Trial piece bending 6) Fit up & Welding Change over process Route card Best fabrication practices SS sensitivity Tools identification WPS, PQR & WPQR Weld sequence Temporary restraints Dead weight purpose WIND barrier purpose Report preparation and documentation