MBFZ INFRASTRUCTURE STATUS APPR

Project

The construction of
roads,sidewalks, water
distribution lines, sewage
collection system.lift
station, force main, stormwater drains and
channels,electrical
distribution and
communication network
with related civil works

Authrity/Entity

Contact person

National Water Commission

O'neil Shand

Jamaica Public Service Co. Ltd.

Sane Facey

Land Survey Department/Grantley


Kindness and Assoc.

Grantley kindness

NEPA

St. James Parish Council

Mrs. Kerr-Reid

RASTRUCTURE STATUS APPROVAL REPORT 2008-11-19


Title/Post

Technical Services Manager

Customer Services Manager

Activity

Water Supply and Sewage

Electrical Distribution

Action to date
Designs were done by
consultants and drawings
submitted to the PAJ. The PAJ
made submission to NWC 21-82008.

Designs were done by


consultants and drawings
submitted to the PAJ. The PAJ
made submission to JPS 21-82008. The JPS responded to the
consultants by letter dated 10-102008 for the adjustment to be
made to the designs to facilitate
provisional approval.

Submission were made by our


our Consultants.
PAJ's Consultant-Land Surveyor

Planner

Subdivision

Environmental approval

No action required by the PAJ

Development Approval

Designs were done by


consultants and drawings
submitted to the PAJ. The PAJ
made submission to PC 19-82008 and awaits its
comments/approval.

Status
Designs to be submitted
to the commission
meeting for consideration
and approval. This based
on checks made by the
PAJ'S representative.

The concerns of the JPS


were addressed by the
consultants. These were
reveiwed by the PAJ and
recommendations made.
The revised dedesigns
were received by PAJ 1711-2008 and reveiwed
and letter prepared for
Mr. Egdhill signiture.

Consultants are actively


pursuing approval. Our
checks revealed that the
approval to be signed.

the drawings/designs
were submitted by PC to
the NWA for its review
and comments. No
response has been
received by the PC to
date.