DESIGN CHECKLIST – HYDRAULIC SERVICES

Project Name:
Project Number:
Engineer:

REVIEW INITIALS/
PROJECT REVIEW MILESTONES AND POINTS DATE NA COMMENTS

Attendees:
30% Review/Concept Review

Dial Before U Dig

Site survey conducted

Implications of existing site/adjacent services assessed and


reported (ie. SA Water mains)

Engineering Services Design Brief prepared and issued

Brief acknowledged by client

Budget estimates - inclusions/exclusions issued

Documentation programme defined

Spatials/weights documented and issued


Drawing No.'s:
Concept layouts reviewed

Inter-discipline concept coordination agreed

Natural gas connection requirements issued to Origin Energy

Fire services connection requirements issued to SA Water

Domestic water connection requirements to SA Water

Sewer connection details received from SA Water – including


depth and position
Attendees:
60% Review

Design brief updated and current

Brief acknowledged by client

Estimates updated and checked with scope

Draft specification prepared


Drawing No.'s:
60% drawings reviewed

Room data sheets received and incorporated

Electrical loads issued to Elec. Discipline

Tundish locations and Water Supply points received from


Mechanical Discipline

Natural gas connection – location, size, pressure confirmation


received from Origin Energy

Fire service connection confirmed with SA Water – network


analysis received

Domestic water connection confirmed with SA Water

Drawings issued to Acoustic Consultant

90% Review/Final Engineering Review Attendees:

Architectural layouts coordinated


DESIGN CHECKLIST – HYDRAULIC SERVICES

REVIEW INITIALS/
PROJECT REVIEW MILESTONES AND POINTS DATE NA COMMENTS

Structural layouts coordinated

Civil layouts co-ordinated and site levels inserted

Sewer drainage – fixture and pipe sizing calculations

Invert Levels confirmed and co-ordinated

Domestic water – pipe sizing calculations checked

Specification coordination with M, E, VT, F done

Electrical power supplies included

Acoustic requirements coordinated

Termination points coordinated

Pre-tender estimate prepared and issued

Associated works schedule completed

Drafting review conducted

Project Analysis sheet prepared

Specification reviewed (Initials)


Drawing No.'s:
Drawings reviewed

Issued to SA Water Corporation

Issued Trade Waste Application

Issued Septic Tank Application to Council

List of items to be attended to:- 30% 60% 90%

 Has been attached to this form YES/NO YES/NO YES/NO

 Has been marked-up on drawings and/or specification YES/NO YES/NO YES/NO

Follow-up required YES/NO YES/NO YES/NO