DOP1000-PRC-002-0-02
Business Risk
Process Measure
Local/Project Variation
END End
Activity Steps
1.0
1.0
1.1
Quality Mgmt.
Project Engineers
RIS
K
HSE Alert
Discipline Lead
X X
HSE
Project Manager
Decision
Additional Note
PURPOSE,
PURPOSE, SCOPE,
SCOPE,
DEFINITIONS,
DEFINITIONS,
REVISION
REVISION HISTORY
HISTORY
ST
Involved in Activity
Client
Start
Prepared by:
Afif Abdo
Verified by:
Nasser Iguertsira
Approved by:
Tewfik Ferhat
Revision Status:
03
Construction
Procurement Management
Suppliers
Responsible and
Accountable for Activity
ST
Responsible
for Activity
Legend
1.9
1.2
1.3
1.4
1.5
1.6
No
Yes
1.7
No
Paper copies of this Process Map are UNCONTROLLED. Please refer to the B&R-C website for the current version.
Page 1 of 10
Business Risk
Process Measure
Local/Project Variation
END End
Activity Steps
No
Quality Mgmt.
RIS
K
HSE Alert
Project Engineers
X X
HSE
Discipline Lead
Decision
Additional Note
Project Manager
Involved in Activity
PURPOSE,
PURPOSE, SCOPE,
SCOPE,
DEFINITIONS,
DEFINITIONS,
REVISION
REVISION HISTORY
HISTORY
Client
Start
Construction
Prepared by:
Afif Abdo
Verified by:
Nasser Iguertsira
Approved by:
Tewfik Ferhat
Revision Status:
03
Procurement Management
Suppliers
Responsible and
Accountable for Activity
ST
Responsible
for Activity
Legend
Yes
1.8
1.9
2.0
DETAIL DESIGN
2.1
2.2
2.3
2.4
2.5
Submit bids.
1.1
Yes
Paper copies of this Process Map are UNCONTROLLED. Please refer to the B&R-C website for the current version.
Page 2 of 10
HSE
HSE Alert
Business Risk
Process Measure
Local/Project Variation
END End
Activity Steps
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14
2.15
Client
Additional Note
Prepared by:
Afif Abdo
Verified by:
Nasser Iguertsira
Approved by:
Tewfik Ferhat
Revision Status:
03
Construction
RIS
K
Start
Procurement Management
X X
Decision
Quality Mgmt.
Involved in Activity
Project Engineers
Discipline Lead
Project Manager
Responsible and
Accountable for Activity
ST
Responsible
for Activity
Suppliers
Legend
PURPOSE,
PURPOSE, SCOPE,
SCOPE,
DEFINITIONS,
DEFINITIONS,
REVISION
REVISION HISTORY
HISTORY
Paper copies of this Process Map are UNCONTROLLED. Please refer to the B&R-C website for the current version.
Page 3 of 10
HSE
HSE Alert
Business Risk
Process Measure
Local/Project Variation
END End
Activity Steps
2.16
2.17
Client
Additional Note
Prepared by:
Afif Abdo
Verified by:
Nasser Iguertsira
Approved by:
Tewfik Ferhat
Revision Status:
03
Construction
RIS
K
Start
Procurement Management
X X
Decision
Quality Mgmt.
Involved in Activity
Project Engineers
Discipline Lead
Project Manager
Responsible and
Accountable for Activity
ST
Responsible
for Activity
Suppliers
Legend
PURPOSE,
PURPOSE, SCOPE,
SCOPE,
DEFINITIONS,
DEFINITIONS,
REVISION
REVISION HISTORY
HISTORY
Paper copies of this Process Map are UNCONTROLLED. Please refer to the B&R-C website for the current version.
Page 4 of 10
Business Risk
Process Measure
Local/Project Variation
END End
Activity Steps
2.18
Provide Construction/Hookup/Commissioning/Maintenance
Support.
2.19
Client
Quality Mgmt.
RIS
K
HSE Alert
Project Engineers
X X
HSE
Discipline Lead
Decision
Additional Note
Project Manager
Involved in Activity
Start
Prepared by:
Afif Abdo
Verified by:
Nasser Iguertsira
Approved by:
Tewfik Ferhat
Revision Status:
03
Construction
Procurement Management
Suppliers
Responsible and
Accountable for Activity
ST
Responsible
for Activity
Legend
PURPOSE,
PURPOSE, SCOPE,
SCOPE,
DEFINITIONS,
DEFINITIONS,
REVISION
REVISION HISTORY
HISTORY
END
Paper copies of this Process Map are UNCONTROLLED. Please refer to the B&R-C website for the current version.
Page 5 of 10
Business Risk
Process Measure
Local/Project Variation
Activity Steps
Author/Revised by:
END End
Quality Mgmt.
RIS
K
HSE Alert
Project Engineers
X X
HSE
Discipline Lead
Decision
Additional Note
Project Manager
Involved in Activity
PURPOSE,
PURPOSE, SCOPE,
SCOPE,
DEFINITIONS,
DEFINITIONS,
REVISION
REVISION HISTORY
HISTORY
Client
Start
Prepared by:
Afif Abdo
Verified by:
Nasser Iguertsira
Approved by:
Tewfik Ferhat
Revision Status:
03
Construction
Procurement Management
Suppliers
Responsible and
Accountable for Activity
ST
Responsible
for Activity
Legend
Approved By :
Date:
Tewfik Ferhat
Mar-04
Printed names here confirm the document has been signed off and the original is held by the Quality Direction.
Paper copies of this Process Map are UNCONTROLLED. Please refer to the B&R-C website for the current version.
Page 6 of 10
Purpose
The purpose of this PRC is to present an outline of the activities sequence and department/personnel
responsabilities for detail design of a facility.
Scope
Definitions
Concptual Design is the phase of a project during which the essential design parameters are established
and optimized. The principle objectives are to develop the necessary flow schemes, layout, weight and
cost data to a sufficient level of detail for the client to sanction the project.
The detail design phase of a project is the period during which the design of all systems and facilities is
progressed to an "Approved for Construction" status. This phase also normally includes the specification
and procurment of all necessary equipment and materials.
Revision
History
12-Sep-01
3-Jul-02
1-Sep-02
23-Mar-04
Rev 0 - Creation
Rev 1 - Logigramme Review
Rev 2 - Codfication modification
Rev 3 - Content review
Additional Notes
Note 1.0
The business unit or local office will provide a client detail design basis definition specific for the type of
project under investigation. This is in the form of a check list or matrix detailing the documentation
required.
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version.
Page 9 of 10
Attachments Section
Detail Design (Hydrocarbon)
DOP1000-PRC-002-0-02
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version.
Page 10 of 10