You are on page 1of 1

JOB BREAKDOWN SHEET FOR WORK ANALYSIS

Operation:

Product:

Name:

List all details for the


(present / proposed)
method: Every detail,
inspection, or delay, etc.
1.

Department:
Date:

Notes: Reminders,
Ideas: Write them down.
distances, tolerances, time, Dont trust memory.
etc.

2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.

Art of Lean, Inc.


www.artoflean.com

You might also like