WPS and PQR (three questions for one WPS and one PQR)
They provided one WPS & one PQR
Thickness on the WPS was 0.4320, and there were two tensile tests on PQR with a
thickness of 0.8 inches each.
First question,
Were tensile tests on the PQR acceptable?
abcd-
Yes
Yes, but specimen #1 is rejected
Yes. But specimen # 2 is rejected
No. the number of test is not educating for the given thickness.
2nd question
-
Choices were
abcd-
Yes
No
No need for bend test
Yes. But specimen # 1 and are rejected.
Third question
Thickness range was mentioned in the WPS
abcd-
Yes
No
Yes, but not the right range
Dont remember
If RBI is not being used, the interval between piping inspections shall reviewed when changing
service from:
abcd-
During radiography, when source side film is not possible, a film side source is used with the
following letter/s on the film
abcd-
F.S
F
B
S.S
E 7018
ER707-E
Dont remember
Dont remember-
Which of the following valves has will never encounter pigging problems
abcd-
Gate
Ball
Slide
Dont remember the forth one
When calibrating UT equipment, the difference in temperature between the probe and part
being examined shall not be more than _____
abcd-
Dont remember
Dont remember
Dont remember
Dont remember
You can start coating activities prior to the following tests except:
-
Flexibility test
Initial service test
Leak test
Hydrotest
Service conditions have been changed for one the piping. Rate of corrosion has to
determined no longer than
a- One year from the time of installation
b- Three months
c- Rate of corrosion need not to be revised
d- 6 months
abcd-
Owner user
Piping engineer
Piping inspector
Corrosion specialist
When you notice a corroded support that is attached to one of the piping, and it is required to
lift the pipe to verify the corrosion, what is your correct action
a- Take the line out of service
b- Ask for a detailed lifting procedure
c- Lift pipe immediately to check the corrosion
d- Dont remember
During a hydrotest, the relief valve has opened when the pressure reached the set point of the
relief valve, what is your correct action
abcd-
Every year
Before and after use
Every two years
Every six months
Mandatory
Optional
Same requirements as primary process piping
Every 10 years
Threaded connections associated with machinery and subject to fatigue damage should be
inspected
Temperature range
Manufacturer name and marking
Flange classification
size
During inspection, you found CUI with a damaged insulation; the piping was class II, the allowed
percentage of insulation remove is
abcd-
100%
50%
33%
Up to the inspector
Service conditions have been changed for one the piping. Determining the probable rate of
corrosion from which the remaining wall thickness at the time of the next inspection can be
a- Left as is
b- Estimated from similar material in comparable service and comparable operating
conditions.
c- Calculated by a piping engineer
d- Calculated by API 570 inspector
During a routine inspection, you notice a bulge in a pressure vessel that is attached to a piping.
Your immediate action is
-