You are on page 1of 26
12 The lates! otherwise sf 1s: 2062 1:80 coleuictions, schematic: drawings ore prepored ond drawings. material indents, ‘(bolted and/or welded) andi delivered to the work site in to be agreed between the Contractor and the coc jh shop. Receiving. off loading. handling. assembling and ted iteras ond handing over in satistactory condition ine whole of the ned shall b the responsibilty of the Contractor. et reeset ip mcrae aca oneeing huncses, ah Stonath faction Gap Ballo SivcksolEnoaenng —— 3 ‘Technical Speciecation ‘Supply. Fabs Erection of Svucture Stee! ‘Office Bulking , z ASEM A325 Bolts for Structural Joints S2Di6 153613 for Wire Flux Combinations for Submerged-Arc Welding. 8699 for the Manual Matal Arc:Welding of Mild Stee! and. Steel. AWS A-5.1 Mild Steel Covered Arc Welding Electrodes AWS A-5.17 or Bare Mild Steel Bectrodes and forSubmerged Arc 1ss1852 Rolling ond-Cutting Toleronces for Hot Rolled Steel 18:2074 ' d ous Pr ‘Structural Safety of Building - Loading Standards. s1893 feco ations tor Earthquake Resistont Design of Structures isuay s50°0F Struk in Building. ASC tio the Design, Fabscotion ond Erection of Structural Steel 19 for Limits and Fits for Engineering 1S: 4000 for Assembly of Structural Joints using High Tensile ‘6353 for Submerged Arc Welding of Mild Stee! and Low AWS: 9! Welding in Building Construction. 5823 Id Huxe for Monual Metal Arc Welding of Mild Stee! Co Hi for Metal Arc Welders (engaged in welding structures 5:18 I ee 5 in Stee! Plates, aus Practi for Liquid Penetrons Faw Detection Sam =| Poricle Flaw Detection of Woles Asiitss — He Radiographic lesting Asmeion Portticle Inspection ASTM E138 ticle Inspection ASTMOEI 65. 1477 ge of Practice for Painting of Ferrous Metals in Buildings and Alied e lor Use of Steel Iubes in General Building Construction. Erection of Structural Steel work. 14 Technical Speotecation ‘Supply. Fabrication & Erection of Suuctue Stee! {or Otice Buteing testing of steel received at site as per the EIC direction 18. codes.} lime schedule for the completion of the job. ENGINEER ‘and basic (schematic) drawings / details snail be worked eppointed by the client. ‘and Specifications include everything requisite and notwithstanding the foct that every item may not be plementary parts such Gé bolts. clips/cleals ond angles item shall be deemed to be included though not when finithed shall be delivered in a complete and for preparation of the shop {fabrication} drawings. ail the necessary list of bolts and detailed materials ists d to him. The Contractor shal prepare these drawings / d code of practice and submit the some in triplicate in al. The above drawings shail include: Contractor shail revise his shop drawing accordingy drk the lst o! materials etc. without any extra cost. ‘Technical Speciecation + a” ‘Supply . Fabrication & Ereaen of Srvoure Stee! {or Oftce Bulag In case the to suoges! certain alleroions,sbstiuont cr moeteoters ‘of design ° “he sholl provide the necessary drawings together with colculations “approval of the EIC. 1.6 Mareniats 1.6.1 Rolled Si Ing following be vied lor steal structure. tols:a14 Approval o ing procediyres shall be as per 1S:623. Bolls ond np shal be os ef IS:1367 ond ested as per IS:1608. It shall hove a minimum fonsie strenplfy of 440 N/mmd ond minimum elongation es per IS. Washers shall be os per | conlorm i their respective speciticetions, The use of equivalent or Jerials shall be considered only in very special coses subject bt of the Engineer in-Charge in waiting Ls Any d material used, pointed out at ony stage of-work, shall be replaced by ‘own, care shal be laken to prevent any damage 10 the other | Jerials shall He s}ored in such a way as 10 avoid ond preven! deterioration $f steel shall ha} be permitted. steel [shall be stored 300 mm. above ground level. on suitable il not be storedi}in creas. which are ikety 19 be Gug up. This is s0 10 prevent of any kind as well os storagie.of some shall be mode Indards. ‘nuts etc. shall be accompanied by manulaclurers test 4 to produce monuicciuie’s quality certificate tor ihe r ‘are missing ot incomplete or when materiot the Contractor shall conduct all oppropriate in-Charge. at no exire cost, in opproved testing | webs- 100% radiographic 75) of fiest sie weldsy $5 fo longer elc-viltasonic testing italy decroore 10 1 in 10 poslign i folure are tess than | in g of S%of welds. ‘ol | in 20 positions decrease to 1 in SOit follure (1 to the standard praclice lollowed in modern structural tonufactured accurately $0 that the some could be |s having the some identificotion marks Jeet in case where actuol parts have been vsed! as Engineer shall decide whether Ihey are lit dling Techveat Spectecation Supply. Fabsication & Erection of Swucture Stee! for Office Butaing straight and free from twists. t considered nocossary. Q d to, in order to bring it to the specified the properties of the se in design. Local appiication of pressure at room or thermal means may be used for straightening duit to such Jengths that the erection clearance ‘for cleoted g steel to steel should not be greaier than 2 mm at each ends of beams without cleats should not be more practicel reasons. if greater clearance is considered alings or connections shall be provided. ‘ dit be inspected. detective portion segregated and the Iwithin a week of receipt. All materiol before ond atler flee trom Iwist, bends. o any such surface delects. The ‘opplying uniform pressure or by cold working. Bending @ ubin'such @ manner as not to impair the strength of the 5 made on horizontal platiorm in order to ensure horizontal members. The tolerance limit in the marking shal! be 1.7.6 Cutting © may be effected by shearing, sowing or machine flame « shol be reasonably clean and straight. Sheared members - bt sheared edges. ¢ tolerances for members to be all be | mm and }3 mm. The edge preparation 12 mm thick shall be done by flame cutting and ‘lowed only CNC (Computerised Numeric Seo. Fabrication & Erecton of Stwctue fo Oc aang [2 mm. in clometer than the diameter of ine bot! ‘up To 24 mm. thon 3 mm. greater Ctherwise specified. Holes in the light iroming 9 Splice holes may be punched ful cma bebe hole shall be made ae cang't: Hole reaming shall be allowed il the nurnoer ot faulty holes 18% ol the totol number of holes for one joint. Inetel by heating the member up to 850°C-900"C flight rect Slowly os cirected by Engineer-in- Charge. When temperature drops below 500°C. tions shall be checked by meons of templates ond the (0nd template shall no! be more than | mm. ihey are neither twisted nov otherwise with specified combers. il required, eee ‘Technica! Speclecation ‘Supply . Fabrication & Erection of Suuctire Steet {or Olfice Bulking Necessary, washers shall be tapered or otherwise suitably a not bear on the unthreaded body of the boil. The Project Ihrough the nut at least one thread, bly of siructural steel be made by using proper jigs Positioning of members. Cut surfaces wilh sharp edges e¢ of rust and members assembled shall be ciry and clean Cumstances.shall wel. greasy, rusty or ditt Covered parts ‘butt. welds. the re-welding of the roo! is mandatory but ¢ Foo! has been cleaned by back gouging or chipping, 9 Seams 10 cool gradually welding of following layer. the formerly welded layer shail @h{ chipping and wire brushing. The order and method of Pensate for Contraction due to welding in order 10 aM suitable sequence of welding 10 keep the internal Tectia Spectecaton Sots of Sec See tor Ofcn Budeg. inspected Painiing. The weld seams shall comtespond 10 design. and shalt have any defects such os cracks, incomplete penetration, rough burrs. blow holes ond porosity etc. Any weld, which is ive, hammer or o gouging torch jin ony woy. caps and bases nls of struts and compression members depending or shall.be accurately machined and close butted over the Gnd bases, the ends of shatis together with the attached after bolting and/or welding together as the case may be. $0 that the parts connected bult over the entire suriace of ussels, bas ond or welds are provided 10 transmit the nlite loaaing Need not be machined. A bearing face of column base plote, whch & dation, need not be machined provided such face is true ¢ fabricated member shall be cleaned thoroughly of all he [he clecning sho be done to SA 2.5 by copper slog blasting. thin 2:houts of the. copper slag blasting. Enlire steel work with machined surtaces ofter being thoroughly cleaned 10 finish, in cose of exposed steel, shall be appied. All primer IGBC LEED norms. Thickness of coal shal be os per : color shall be as per EIC approval. Al bolls, nuts, washers d ond. dipped in boiled linseed oil. Unless specified sible ofter bolting or intermittent welding shail be given lwo bly. Weis ond odiacen! parent metal shall no! be pointed atked belore delivery in accordanée wilh the opproved af with other motks os to laciliote erection. the labricale from shop to the site in such o sequence. as may be However. accuracy of fil lor fabricated sieel work may rection complete or in parts in shop belore dispatch. For the ivered in bundles or ciaies. the 1equied morking shall be fied to the bundle. while the crates shall be morked 1748 access al cll times to those parts of the Contractor's work serned the fabrication of steel works and shali be afforded all islying himself that the fabrication is being undertaken in Of this specification. The contractor shall furrish necessary aoa technicel and non-technical personne! for shop tests rent and levels of foundations, accuracy of main of starting the erection work and shall be fornon compliance thereo!. In case of any deviations alignment! levels etc., it shall be brought to the notice of the eC wious paris of the stee! structure shall be so erected as to ensure ‘against sell-weigh!, wind. erection stresses and conditions including eq i nd its operation and temporary bracing may be Joe anchored gnd final erection joints shall be completed after the members of tH binyiclure are all positioned. leveled as shown, in drawings and approved The bolted joints|shhat be tightened so that entire surtace of the bolt heads and nuts sholl Ports with) Surfaces, tapered washers shail be used, Alldetects and garages to the structures shall be rectified by the Contractor at his own of the BIC. ing receipt al site, shail be caretully unloaded, examined for delects or sorted Out as per ‘marking and stacked on leveled ground. Jomaged lof delective shall be stacked separately and the same to Be painted in diint live Color] Suck material shall be dealt with under ihe orders of the a Technical Speciecaton Supply Fabscation & Erecton of Structure Stet for Office Bulding ny ection by using mechanical equipment like cranes. Poles and Genicks e used ‘Opproved by the EIC in writing, The Make the following verifications upon the receipt of material at site. moterials ond workmanship conforming to the » s/ mater received ore complete without detects Cleated ends of members connecting slee! to steel should prelerably b 2.0 mm at each end. The erection clearance a! ends of b cleals should be not more than 3mm at each end. Where for Practical » gredlef clearance is necessary. suitably designed seatings should bexgrovid a In bearir tions, the holes may be made not more than 1.5 mri greater than the fio in case of bolts of diometer less thon 25 mm and not cose of bolts of diameter more than 25 mm, unless otherwise specificd}by the FIC. The hole diameter in base plates shall be no! more than 6 the enchor bolt diameter In fictio connedtion the clearance may be mointained, unless specified otherwisd in tHe desi ment The ste porarily shop erected/assembied complete or as amanged with the ihepeptos so thatjoccuracy of fit may be checked belore dispalch. The porls shall be J sambled With sufficient numbers of parallel drifs to bring and keep the parts in phoce. oF punched, through steel jigs with bushes resulting in oll similar pqris b¢ing interchangeable, tne steework may be shop erected in such Position qs omangped with|the inspector/EIC In-case df sho| in using numerically controlled machines controlled by dato generali fare. the shop erection may be dispensed with at the EIC, 1.9 Safety during] Faby Erection. Al steel rhaterfols ig fobricated structures either at fabrication shop or at erectionkite « led only by worker skilled in such jobs-where necessary with load tested litling devices having tested wire rope slings of Correct size. rom damag 185 shguld be well maintained and operated by experienced operate Oxygen pnd linders and their hoses shall have distinctive colours Cylinde in upright position in well-ventilated rooms or in open air no! expoied}io ila nes] naked lights or extreme heo! and should also be in uptight Position When [heylare bping used, All gas cutting works shall be done only through experienFed sfiled gos qutters equipped with gloves. boots, aprons. googles ones y dé make. manner: ‘Gnd should also be provided with gloves and shoes shall be forced 10 use safety belts. ‘during erection that there is no possibility of is completed. ". "Caution", "440 volts", “Don not smoke", “Look ‘ct appropriate places ‘during erection. reference shall be made 10 IS: 7205. Property cleaned of ail loose mill scale, rust, dirt and other forcign ‘oF copper slag blasting as specified in BOG. Except ace area adjacent to edges to be field wekled, all id two coals of paint both of Gppraved Tye "manually by brush as decided by the EIC ance with IS : 1477 (Part-I) and 15:1477 (Part-2) with porary coatings , permanent finishes etc. ¥ shall be given two coats of shop point of different show through. cleaned by effective means betore painting, 112 | tabricction }. Payment le quoted shelbe Incusive of welcing, iveling Of Proctice of Indian Standard institution tor joGH5 of best quality oll paint os specified. Welds. bolls, nuts. 9. Pocking plates etc., shal not be measured nor paid tor shall be deemed to include preparing notches, holes. ut for chequered plates and grating shall be on the bass of s/shal be made for notches, holes less than § sail. mode in ‘tucks / trailers and placing in the yard ot site, section eavioment’s viz Hydro, crane elc. is included in the of fabrication drawings (6 sets min) prior io Bull’ drawings (6 sets min.) on completion of the work ON OF PLANT BUILDING WITHOUT CRANES P 8! ports of the stucture unless the drawings issued for | ANNEXURE- A remedy of delects ‘All faulty welds shalt be rectified Shovid faulty weld be found, ail welds shall be checked and ot detects shail be ‘AS per i5:823 | | _ANNEXURE - B din the erection of plont building containing cranes. D ion Variation Allowed £5.00 mm £5.00 mm + 500 mm from tue vertical + 500 mm from te Vertical for any 10 m length measured between connection levels, bu! not more than ¢ 8.00 mm for 30 _mlength o above £5.00 mm on true span £5.00 mm [SEP eE Ess o€ement of top chord et | 17250 of the span or 20 mm russ from verlical plone | whichever is less ctor shail be of !ested quality as per specifications below terials shall be provided by the Contractor. pe conforming 10 1S:1367 and 18:4218. conforming 10 15:2016. Technica! Spectecation Sy ani Erecton of Structure See! (or Office Building . or embedded in concrete shall be pioced 2s per drawings before and during pouring of oF steel templates ond other devices. Positioning shall be: nominal diameter. th of the bolt nominal ca. |with concrete shall be greased and protected trom vie clothn/polythene. of anchor bolts including sleeves and nuts shail be on ished ‘A sample bolt shall be got appinved trom Engineer- fe separaiely specified. shall be on weight basis and rate shall +910 ooammaaaaieeieametaed \. bolting, riveting, welding elc. shall contorm to the for structural Steer’. The meto! inserts shall be of the Engineer-in-Chorge. shail be in brick masonry. plain or reinforced concrete p securely placed in the member that ils position is not disturbed ple tempiotes, spacer blocks. dummy structures end staging shatt the shuttering ond adjustment of reinlorcement shall metal inserts il situation so requires. Where so ae | shall re two coats of anti-corrosive epoxy primer ond where jute a cloth wrapping and tying. on of actual weigh! of the metal inserts. Rate for metal ply. . fixing. tying. tuming, tack welding. welding on such] 9} Pipe {lor puddle ficnges) cutting and adjusting the ry packing, il required with cement mortor 1:3, pe ae e ef 2a ¢ ) 1S:3502: Steel for checkered plate shall conform 10 be free from harmtul surtace defects such as cracks. be cut to shape and fied to bearing members os ‘0s ditected by Engineer in-Charge. The edges sholl ‘ends shall’be lelt. The plotes may be spiced ‘but in that cose care should be taken so that ‘of weight of checkered plates actually loid, the rate Gg size, making holes to required shape. smoothing ends, g, fking in positions etc. complete. ‘dul type as per Conlractors/Suppiliers design, using be Jobricated, out of MS. tlals. the steel shall conform to 2 quailty. t shall be cleatly rolled and shall be [ree trom supporting structure shown on design drawings. the ion drawings and get the some approved as per drowings for siruciural stee! work. ¢ @} per the design drawings supplied to the Contractor brication drawings prepared by the Contractor ‘ou! type and designed fo Carty specilied loads willy WwW tioned jn schedule of rates ‘span for. fabrication be provided , The rates shall looding. have threads as per 1S:554. All \eans of suijable clomps or bY jer-ie i clomps ond Technical Speciation Supply. Febacaiion & Erecton of Structure Steet {or Offce Bulking .« these soll be copable of camying G a2 ot 0 concentrated load of 10 kN of mid spon ‘obove loading condition shall be ‘or 6mm whichever is less. The design ‘x procurement the Contractor shot gs and manulociurers ilerature and ge! the some with nosing: of checkered plote of ‘the bosis of weight of the crea of MS. Grotings ‘and boss of the area of MS. Gratings ond frome octvally ‘i linclude cos! of preparation of fobncation drawings, sie, tabsicaling, welding, bolting. smoothing nds Full deductions shall be made [or ol ‘iso include all incidental costs and unloading, storing, sale custody. watch ond ond fittings|shall conform 10 15:1239 ond shall be of medium grode. All filfings shall be malleable iron fittings as welded or joinad with screwed couplings. Care shall be [ngs De Kom tile ands of the pipe ond il required the veruica: mene’ ‘with cemept mortar os speci fied. The pipe shall be fixed to pive oF ‘means of welding, Alter fixing. Ihe pipe a coal of white paint or aluminum paint over 0 coat of Primer OF ‘be mode of running meter basés of the aclual length of hand rail fixed fifings. it any, lransportation. cutting of evi ‘welding. fixing. poiniing, etc. all complele oF Pe a swash. ne eines kn eet Poeen * OM it 1.48.4 ~ Paymer Payment shcfl be} way TT 1494 Soppe This specilict Heian tact aetna inane alot 0S rungs. | the use of expansion tosteners for providing fixtures to Expansion Fasteners - fhe outer diameter for these fasteners shall be equol to ‘of the fixtures so that they can be installed directly fixture kept in position. | Type. The outer diometer of this type of fasteners shall be ‘mounting hole of the fixture so that they can be installed ‘betore the ficiure can be placed in position ond holes by means of bolts, (5. on fasteners al the specified places according to ation with the help of necessory tools specified by ‘BppFoval o Engineer in-Chorge. Tho Cont actor shal ‘Charge for every installation of expansion fasteners ia Dasis. The rate shail include, cost of feastenens, nubs . Necessary scalloiding, dling with electric dril, labor. of all labor, materials cnd equipment and ary lo complete the work of grouting of blockouts g of base plates. shall be of potable quality. admixture lke ‘groutex CRS-NS grou! (by cemeni equivalent shall be of a standard brand from o repuied = by the Engineer-in-Charge prior to its use on works, have 1o be grouled shall be cleaned thoroughly by belore taking up thé grouting operations: << Technica! Specieeation ‘Supply. Fabrication & Erection of Structure Sie! Ofice Bulking . 2 pees the spaces fo be grouted and permanently retain its 5 ‘will be held firmly in set position. The amount of pl 10.0 minimum. njs.or wedges shail be done as per instruction of Enginee:- ns shall be 50mm less than the space between Iwo ever is less. The length of shim shall be same as 55 shall be kep! as required. however minimum numoer between the grouting mixture and the hardened top of the foundation should be cleaned thoroughly . Foundation lop shall be chipped thoroughly to. Oil and grease spots must be removed. underithe structure the grout shail be held firmly in 100 mm higher than the bottom of the structure to to force the grout completely under the structure the foundation top as described herein above. it also tion immediately preceding grouting. Ako. to promote top shail be wet. Alter the siructure is installed and the Gir, all dust and foreign matiers shall be blown olf top shall be wetted thoroughly, and a sight steam, Sipe Fatrcaion 8 ‘ {er Ofica Buiing placing of glo ‘grout, ogein using compressed air oll excess water on foundation 67 bolt holes shail be blown off 1.26 Grouting of Pockels and under base plates of structure. have been broadly; gories, €.9. non-shrinking grout ond ordinary grou! shovid be kept minimum to make the mx €| used for olf structure frame supporls or platform having OIpul shall consist of | port of ordinary portland cement parts # ONG mixed 10 the minimum consistency required. Water ‘on piles or paving. {he strips shall be dragged back and:froth continuoush. bution. Supply of compressed air, hose and o nozle wit 'e teach under the base plate to bow all Ihe dit ond with rods wil cory the grou! under the equipment Atler grout has appeared ail round the equipment vel of the bottom ol the base, it is permissible to pour grout O Ihe equipment. Pouring and agitation of the grout '§ reached about 100 mm higher than the boltom of #5 ore 10 be removed and the grout thoroughly packed . When the grout has taken an inifial set, and further thow is to be Fut irom around the outside of the base. down to 0 level Ing form on one side of the base plate only. Continuow {or Ofice Outing ms and wedges and final alignment checking shall b ‘harden for @ period of § days. At the end of this jay be removed. the anchor bolls are fighlened uniformly. lui should now be re-checked. if serious misalignment is Gfouling has not been done properly. and it may be necessary to Wl. realign cng! grout again. If he alignment is correct, the voids lelt by Hien it itis c}} must be filled up wilh the similar mixture of grout. 1.22 Fasrican: iP RECTION GF STEEL EMBEDMENT PARTS IN CONCRETE bi the chile fequirements for the supply and fabrication and/or erection of d Pe bed iin parts by the Contractor in concrete. The extent and Sei sect rs tobe bedd d shall be as per ihe detailed Drawings. 1.222 oli embedding in concrete shal be either: iunished by the Engineer-in d ond fabricated by the Contractor in accordance with the ated in ‘detailed drawings. The siee! parts shall be furnished any ct area the Contractor shall make his own arrangements, ot the some to the work site. { ‘shail include items such as anchor bolts. anchor bolt pipe @ors and walls, equipments mounting plates, steel pieces ao 19 equipment foundation. pump house and discharge tures. ladders, roof ventilator suppor! frames. steel pieces as for ‘end lier plate covers. concrcte inserts, expansion bolls, ouxlicry ent suppars. lugs and plugs for dour unl wirxlow iraines, dowel bors $ cellahpous frames, loose tintels etc. Erection of material shall fers for ting in place and grouting as required. The grouling b er the direction of the Engineer-in- Charge. Qn ilustration of the type of steel items 1o be considered me items may nol appear in the actual steel parts to be ch iems onty. embedment parts in accordance with the drawings clding setting materials in concrete ot touting pieces in &. scatlolding. tools and services necessary fo ond bading, storing, handling and erection. Contractor shail for field welding os requited in accordance with IS:816 Material are to be pointed with one coat of approved ©us paint without any extra Cost fo the Client, dule of Items. the Contractor shail fabricate the ste! an! clauses specilied elsewhere in this Specification. The ss shall however be prepared by the Contractor and Contractor shall provide necessary temporary bracing or supports ensure wtallation gi the materials. All material shall be erecied plumb and i@ Ud loFahion show in the Drawings al. c @ 6 eee Technical Spectecaton ‘Supoty.Fabreation & Erecion of Stuctire Stes! | for Otice Bung filing the blockouts ond foundation bolt holes. Cement, sand mix in 1H i ‘gluminum powder (obove 0.005% by weight of cement) or antishrink} ‘pproved quality shall be fist blended thoroughly in the facturer's specification. Grout shall then be prepared by mixing thi i in the proportion of 2 parts by weigh! of cement to ‘one port by -|Any grout, which has stood for more than hat an hour atter mining, shit mediately atter preparation, the grout shat be poured into the blockou! either irom the sides or through the holes provided for this purpose in t YY Using special equipment for pressure grouting. I! shall be ensured by tapping of bolts that the blockouts are compietely filed without 1@ Pouring shall cease as soon each hole is filled and any excess grou} surface of Ihe concrete foundation shall be completely : 7 Z 3 2 a i shall bd ing the space belween the underside of base plate and the top of t rele. Alter gr completed as specified above, space between the top surfoce Concrete and the underside of the bose plate shall be filed wi of cement and sand in proportion of 1:1 by weight and blended ‘der (about 0.005% by weight of cement) or with anti- suitable proportion to the cement mortar in accordance of the Manufacturer and subject to the approval of the i. Cement, fond and aluminum powder or approved anti-shrinkage admixture sholl fist be blend rough in the required proportion. The mortar shall then be prepared by © quantity of water. which will produce a sufficiently workable mix 10 enable compiete and prdper compaction of the mortor. fi, The mortar shgil then be placed below the base plale and rammed in a horizontal direction h side nil Ihe mortar oozes OUI IhfOUgH the grout holes provided in the basp iv. When it that the ¢enter of base has been properly filled, the mortar outside the base plate shall be briefly rammed to ensure compaction below the edge. v Any mort ch has sod for more than half cn hour after mixing, shall not be used in th] Curing The work shal bf ured fer ojperiod oo loos 7 doys commencing kom 24 hous eter fe oul onc underaang operation he ung sone Sone at Gunny bogs laces’ Teonnics! Spectecation | ‘Supply , Fabrication & reesen of Seu Stel for Ofice Bung The Engineer| sullicient copies of the shop ond assembly drav.ngs of the steel g the necessary information for erection. Wherever BAR | PRIMER FR - 1101 (RFU) Colour ‘Off White / Dark Admical Grey | Pink 28 per IS : 5-1978 Finish _ Textured Matt ‘Smooth & Uniform Drying time for eath Chat Touch dry - 08 hours | 2 Hours, Hard dry - 72 | | 24 Hours ‘Thinner Setter WP - 913 ( If Required) | Setter WP- 913 ( If Required) Flash Point Above 30° Above 30°C Solid Contains 67% Approx 58 % Approx ‘Scratch Hardness: Conforms to IS :101 Conforms to IS :101 Specific Gravity | 125 4.15 Resistance to Lt u | Conforms to 1S :101 Contorms to IS :101 Prameson ior under Conforms to IS :101 Conforms to IS :101 conditions Intumescence’s R4tio| 400% Approximately. Not applicable Toxicity Non-TERig, Non-Toxic Shelf Life +YearathdemTemp when | 1 Year at Room Temp when stored indoors in steel ‘stored indoors in steel | | containers. containers. Packing Size Sturdy 20 Kgs. W'S. Drums. | Sturdy 20 Kgs. M.S. Drums Apptication By Brush / Trowel By Brush / Spray CERTIFICA’ ee The producti tes 4/8 certified at CBR! Roorkee for one hour fire rating as per ASTM E-119 & ‘SAFETY “uEXUS" no known(hbalth hazards during or after application. ‘However, tion may be required during application since it is solvent based. METHOD 1. Clean the: dust etc. 2. Apply one: |Anti-Corrosive Primer. 3. Apply one ‘Stee! Bar FR-1101 by brush. Allow it to dry for approximately FR-1101 in multiple coats allowing Approx. 8-10hours time lup 10 the desired thickness Apply the top coat, if required 4, 4mm dey codtitg Heke ‘achieved in 4/5 coats. ‘5. Use thinner JU thinning (if required) & for cleaning brush/equipment 10 a n 3B PREFERENCE DE- NOCIL, Cynomide ‘Dow Coming .Water .GE SAIL TISCOJSPLISW ARCELOR MITTALRINL “ISW.JSPL ,Corus “Tato. ARCELOR MITTAL, Pidilite , Chemetoll - Roi International,Nyucame. Asian Shalitex or approved equivalent Supreme Ind. Lid or approved equivalent Beardshell or approved equivalent Qwens Coming or approved “Bquivalent * BITUMAT‘or approved equivalent ADVANI ESAB,ROYAL ARCH oF ‘approved equivalent ESAB MAKE ‘OK AUTROD 12.22 WIRE ;ROYAL ARCH or approved equivalent

You might also like