Professional Documents
Culture Documents
Huawei
P6
Ericsson
NSN
Yes
Yes
No
Yes
No
Yes
Yes
No
Yes
No
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
No
No
No
Yes
No
No
No
No
No
No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
No
Yes
Yes
Yes
No
Yes
No
Yes
Yes
Yes
Yes
Yes
ISHO cancellation
Feature / trigger
Short description
Handover triggers for detecting uplink and downlink coverage edges (All these triggers
are required to guarantee reliable handovers since the loss of coverage may result from
a number of reasons: uplink vs. downlink, pathloss vs. interference)
UE received pilot power
UE received pilot quality
Downlink connection based transmission power
Mobile transmission power
Uplink block error rate
RNC configuration parameters define for each service type whether load and/or service
based handovers are performed or not
Uplink interference (PrxTotal)
Downlink transmission power (PtxTotal)
Uplink non-real time capacity request rejection rate
Downlink non-real time capacity request rejection rate
Downlink spreading/channelisation code usage
Baseband or Iub resource usage
RNC configuration parameters define for each service type whether load and/or service
based handovers are performed or not
Service priority table in RNC that defines preferred system or hierarchical WCDMA cell
layer
Handover target cell control based on subscriber information
Improved end user experience when unnecessary handovers are avoided, e.g. time to
trigger values, interval between attempts and number of attempts