PENGERANG POWER SON BHD
(Company No. 1089480-4)
Level 51, Tower 2, PETRONAS Twin Towers
Kuala Lumpur Oty Cente
50086 Kuala Lumut, Malaysia
PETRONAS
ORRERTERGRERR
PETRONAS TECHNICAL SERVICES SON BHD
‘(Company No. 347848-X)
‘Tower 2, PETRONAS Twin Towers
‘Kuala Lumpur Oty Centre
PETRONAS £0088 Kuala Lumour Malaysia
SIEMENS SIEMENS <4 MMC.
SIEMENS AG SIEMENS Malaysia Sén Bhd “MMC Engineering Services Sdn Bhd
Sumees a3 Shomensifalayse Sen ht Unt 702, Level ama Zia,
tpeseu Jato ett Puna Oagang Save 16, Nov isenTesk Pemsian
Kaen Beating ya, Seunge, 5350 EanaurTun Rank cheas,
‘S087 Statte, Gomany ateyos 000 uns tumpar
ir
PCP-MMC-QAC-MST-UG-010180
PENGERANG COGENERATION PLANT MY1008
445484571 &ABG020
can 5" prora0 UG
= on
cove [mearoe] ava bf [| emmn toms (| Pn
aa = Sil ee
aaa = oe oe
cows [rreoras moran Wh
mans [oorooree mani METHOD STATEMENT FOR LAYING OF QUARRY
forves [owsatei frig “See | DUST BITUMEN PREMIX AT TANK FOUNDATION
a
Hersing Restricted
00/00
A Mc... MY1008-UG-&ABG020-010180 a
/6
“Seager nace wena rere Seeestanotnarnhegensgu Bl sca NEOOE MASSA ESR SANURPENGERANG COGEN PLANT PROJECT
‘Owner Doc. No | PCP-MMC-QAC-MST-UG-010160
MMC... reese. Rev. 00/00
Doc No MY1008-UG-&ABGO20-010180
METHOD STATEMENT FOR LAYING OF QUARRY DUST BITUMEN PREMIX AT TANK
Page 2 of 6
FOUNDATION
TABLE OF CONTENTS
1, OBJECTIVE
2. SCOPE OF WORK,
3, REFERENCE DOCUMENTS,
4, TOOLS AND EQUIPMENT.
5, WORKS PROCEDURE...
6. RECORDS...
7. SUPERVISION AND LABOUR...
8. INSPECTION AND TESTING." PENGERANG COGEN PLANT PROJECT
‘OwnerDoc. No | PCP-MMC-GAC-MST-UG-010160
MMC... wwner boc Rev. 00/00
Doc No | MY1008-UG-8ABG020-010180
METHOD STATEMENT FOR LAYING OF QUARRY DUST BITUMEN PREMIX ATTANK | 4. org
FOUNDATION o
1.0 OBJECTIVE
This Method Statement acts as a guideline for laying of quary dust bitumen
premix on the top of Treated Water Tanks, Demineralized Water Tank
Condensate Water Tank, Polished Condensate Water Tank and Fire Water Tank
Foundation in a safe manner and acceptable method to meet the
Tequirements and achieve required standards with regards to materials.
workmanship and final product,
2.0 SCOPE OF WORK
‘This method staternent describes the necessary construction activities for laying
quarry dust bitumen premix works. This document covers all the necessary
felevant procedures and processes in relation to the provision of all
responsibilities of personnel involved, supply, execution procedure, tool,
equipment, safety factors, document to be recorded, inspection and testing to
be carried out.
3.0 REFERENCE DRAWINGS/DOCUMENTS
3.1 Approved for Construction Drawing list for Foundation Layouts & Details as
following:-
a. Treated Water Tank (Unit 01) - MY1008-00UGA01-&CLC070-033151
REV.01-03
b, Treated Water Tank (Unit 02) - MY1008-00UGA02-&CLC070-033152
REV.01-03
cc, Demineralized Water Tank (Unit 01) - MY1008-00UGCO1-&CLCO70-
033251 REV.01-03
d. Demineralized Water Tank (Unit 02) - MY1008-00UGC02-&CLCO70-
033252 REV.01-03
e. Demineralized Water Tank (Unit 03) - MY1008-00UGC03-&CLC070-
033253 REV.01-03
f. Condensate Water Tank (Unit 01) - MY1008-30UGX01-&CLCO70-033951
REV.01-03
g. Condensate Water Tank (Unit 02) - MY1008-30UGX02-&CLC070-033952
REV.01-03