BACK UP DATA PENGUKURAN TIMBUNAN

KEGIATAN

: PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN

: LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU


: EKONOMI (STIE) SYARIAH KAB. BENGKALIS
: KABUPATEN BENGKALIS

LOKASI

TAHUN ANGGARAN: 2015


No

Panjang

Lebar

Tinggi

1.000

###

1.000

5.700

2.100

Luas

Volume

M2

M3

1.000

0.700

0.950

5.700

5.415

3.300

0.950

6.930

6.584

1.000

5.700

0.950

5.700

5.415

1.000

2.100

0.950

2.100

1.995

3.300

1.000

0.900

3.300

2.970

3.300

5.700

0.980

18.810

18.434

3.300

0.850

10.890

9.257

3.300

5.700

1.200

18.810

22.572

10

3.300

2.150

1.050

7.095

7.450

11

3.350

0.960

0.900

3.216

2.894

12

3.350

5.700

1.050

19.095

20.050

13

3.350

3.300

0.950

11.055

10.502

14

3.350

5.700

1.100

19.095

21.005

15

3.350

2.150

1.000

7.203

7.203

16

3.420

0.950

0.900

3.249

2.924

17

3.420

5.700

1.050

19.494

20.469

18

3.420

3.300

0.980

11.286

11.060

19

3.420

5.700

0.850

19.494

16.570

20

3.420

2.150

0.850

7.353

6.250

21

3.350

0.950

0.900

3.183

2.864

22

3.350

5.700

0.920

19.095

17.567

23

3.350

3.300

0.950

11.055

10.502

24

3.350

5.700

0.920

19.095

17.567

25

3.350

2.150

0.980

7.203

7.058

26

3.320

1.000

0.900

3.320

2.988

27

3.320

5.700

0.850

18.924

16.085

28

3.320

3.300

0.820

10.956

8.984

293.705

283.334

###

0.700

Kuantita
s

(N)

SUB TOTAL

Diperiksa Oleh :
KONSULTAN PENGAWAS
CV. MULTY DESEKO

Lembar 1

Dibuat Oleh :

KONTRAKTOR PELAKSANA
PT. TIGA PUTRA WIJAYA

ADE DESRY KURNIAWAN, A.Md


Inspector

Lembar 2

MUSMULYADI
Pelaksana Lapangan

BACK UP DATA PENGUKURAN TIMBUNAN


KEGIATAN

: PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN

: LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU


: EKONOMI (STIE) SYARIAH KAB. BENGKALIS
: KECAMATAN BENGKALIS

LOKASI

TAHUN ANGGARAN: 2015


No

Panjang

Lebar

Tinggi

Kuantita
s

Luas

Volume

M2

M3

18.924

15.139

29

3.320

5.700

0.800

30

3.320

2.150

0.780

7.138

5.568

31

2.130

0.900

0.550

1.917

1.054

32

2.130

5.700

0.580

12.141

7.042

33

2.130

3.300

0.800

7.029

5.623

34

2.130

5.700

0.850

12.141

10.320

35

2.130

3.360

0.670

7.157

4.795

36

3.350

0.900

0.450

3.015

1.357

37

3.350

5.700

0.450

19.095

8.593

38

3.350

3.300

0.450

11.055

4.975

39

3.350

5.700

0.650

19.095

12.412

40

3.350

0.900

0.520

3.015

1.568

41

3.350

2.250

0.600

7.538

4.523

42

3.400

3.300

0.550

11.220

6.171

43

3.400

2.100

0.480

7.140

3.427

44

3.400

3.300

0.480

11.220

5.386

45

3.400

0.900

0.500

3.060

1.530

46

3.400

2.250

0.500

7.650

3.825

47

3.400

3.300

0.520

11.220

5.834

48

3.400

2.250

0.550

7.650

4.208

49

3.400

3.300

0.550

11.220

6.171

50

3.400

0.900

0.500

3.060

1.530

51

3.400

2.250

0.500

7.650

3.825

52

3.400

0.930

0.600

3.162

1.897

53

3.400

5.700

0.550

19.380

10.659

54

3.400

3.300

0.650

11.220

7.293

55

3.400

5.700

0.500

19.380

9.690

263.491

154.413

(N)

56

SUB TOTAL

Diperiksa Oleh :
KONSULTAN PENGAWAS
CV. MULTY DESEKO

Lembar 3

Dibuat Oleh :

KONTRAKTOR PELAKSANA
PT. TIGA PUTRA WIJAYA

ADE DESRY KURNIAWAN, A.Md


Inspector

Lembar 4

MUSMULYADI
Pelaksana Lapangan

BACK UP DATA PENGUKURAN TIMBUNAN


KEGIATAN

: PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN

: LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU


: EKONOMI (STIE) SYARIAH KAB. BENGKALIS
: KECAMATAN BENGKALIS

LOKASI

TAHUN ANGGARAN: 2015


No

Panjang

Lebar

Tinggi

57

3.400

0.900

0.560

58

3.400

2.250

59

2.150

60

Kuantita
s

Luas

Volume

M2

M3

3.060

1.714

0.550

7.650

4.208

0.900

0.580

1.935

1.122

2.150

5.700

0.450

12.255

5.515

61

2.150

3.300

0.450

7.095

3.193

62

2.150

5.700

0.540

12.255

6.618

63

2.150

0.900

0.450

1.935

0.871

64

2.150

2.250

0.450

4.838

2.177

65

3.350

0.950

0.600

3.183

1.910

66

3.350

5.700

0.500

19.095

9.548

67

3.350

3.300

0.500

11.055

5.528

68

3.350

5.700

0.600

19.095

11.457

69

3.350

2.150

0.450

7.203

3.241

70

3.350

0.900

0.750

3.015

2.261

71

3.350

5.700

0.550

19.095

10.502

72

3.350

3.300

0.570

11.055

6.301

73

3.350

5.700

0.600

19.095

11.457

74

3.350

2.150

0.530

7.203

3.817

75

3.400

0.900

0.580

3.060

1.775

76

3.400

5.700

0.550

19.380

10.659

77

3.400

3.300

0.480

11.220

5.386

78

3.400

5.700

0.550

19.380

10.659

79

3.400

2.150

0.450

7.310

3.290

80

3.400

0.950

0.500

3.230

1.615

81

3.400

5.700

0.600

19.380

11.628

82

3.400

3.300

0.600

11.220

6.732

83

3.400

5.700

0.550

19.380

10.659

84

3.400

2.150

0.400

7.310

2.924

290.985

156.764

(N)

SUB TOTAL

Diperiksa Oleh :
KONSULTAN PENGAWAS
CV. MULTY DESEKO

Lembar 5

Dibuat Oleh :

KONTRAKTOR PELAKSANA
PT. TIGA PUTRA WIJAYA

ADE DESRY KURNIAWAN, A.Md


Inspector

Lembar 6

MUSMULYADI
Pelaksana Lapangan

BACK UP DATA PENGUKURAN TIMBUNAN


KEGIATAN

: PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN

: LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU


: EKONOMI (STIE) SYARIAH KAB. BENGKALIS
: KECAMATAN BENGKALIS

LOKASI

TAHUN ANGGARAN: 2015


No

Panjang

Lebar

Tinggi

85

3.350

0.950

0.450

86

3.350

5.700

87

3.350

88

Kuantita
s

Luas

Volume

M2

M3

3.183

1.432

0.500

19.095

9.548

3.300

0.500

11.055

5.528

3.350

5.700

0.450

19.095

8.593

89

3.350

2.150

0.400

7.203

2.881

90

1.000

0.970

0.550

0.970

0.534

91

1.000

5.700

0.450

5.700

2.565

92

2.160

3.300

0.400

7.128

2.851

93

0.980

5.700

0.460

5.586

2.570

94

0.970

2.150

0.450

2.086

0.938

95

6.980

6.950

0.480

48.511

23.285

96

6.980

5.700

0.520

39.786

20.689

169.397

81.413

(N)

SUB TOTAL

JUMLAH TOTAL TIMBUNAN

Diperiksa Oleh :
KONSULTAN PENGAWAS
CV. MULTY DESEKO

Lembar 7

###

675.92

Dibuat Oleh :

KONTRAKTOR PELAKSANA
PT. TIGA PUTRA WIJAYA

ADE DESRY KURNIAWAN, A.Md


Inspector

Lembar 8

MUSMULYADI
Pelaksana Lapangan

P DATA PENGUKURAN TIMBUNAN

GKATAN SARANA DAN PRASARANA APARATUR

TAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU


OMI (STIE) SYARIAH KAB. BENGKALIS

Keterangan

KONTRAKTOR PELAKSANA
PT. TIGA PUTRA WIJAYA

Lembar 9

MUSMULYADI
Pelaksana Lapangan

Lembar 10

P DATA PENGUKURAN TIMBUNAN

GKATAN SARANA DAN PRASARANA APARATUR

TAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU


OMI (STIE) SYARIAH KAB. BENGKALIS

Keterangan

Salah Cat

KONTRAKTOR PELAKSANA
PT. TIGA PUTRA WIJAYA

Lembar 11

MUSMULYADI
Pelaksana Lapangan

Lembar 12

P DATA PENGUKURAN TIMBUNAN

GKATAN SARANA DAN PRASARANA APARATUR

TAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU


OMI (STIE) SYARIAH KAB. BENGKALIS

Keterangan

KONTRAKTOR PELAKSANA
PT. TIGA PUTRA WIJAYA

Lembar 13

MUSMULYADI
Pelaksana Lapangan

Lembar 14

P DATA PENGUKURAN TIMBUNAN

GKATAN SARANA DAN PRASARANA APARATUR

TAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU


OMI (STIE) SYARIAH KAB. BENGKALIS

Keterangan

M3

KONTRAKTOR PELAKSANA
PT. TIGA PUTRA WIJAYA

Lembar 15

MUSMULYADI
Pelaksana Lapangan

Lembar 16

REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN
PEKERJAAN

:
:

NO. PAKET
:
LOKASI
:
TAHUN ANGGARAN :

NO.

PENINGKATAN SARANA DAN PRASARANA APARAT


LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH
EKONOMI (STIE) SYARIAH KAB. BENGKALIS
5/ULP/POKJA I/DINASPU/V/2015
KABUPATEN BENGKALIS
2015

URAIAN PEKERJAAN

A.

LANTAI I ( SATU )

I
II
III

PEKERJAAN PENDAHULUAN
PEKERJAAN TANAH/ PASIR
PEKERJAAN STRUKTUR
JUMLAH PEKERJAAN LANTAI - I -

B.
I

LANTAI II ( DUA )
PEKERJAAN STRUKTUR
JUMLAH PEKERJAAN LANTAI - II -

C.
I

LANTAI III ( TIGA )


PEKERJAAN STRUKTUR
JUMLAH PEKERJAAN LANTAI - III -

(
(
)
(
(
(

A ) JUMLAH HARGA
B ) PAJAK PERTAMBAHAN NILAI ( PPn ) = 10 % x ( A
C ) JUMLAH TOTAL HARGA PEKERJAAN = ( A ) +
B)
D ) DIBULATKAN
Terbilang :

REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)

PENINGKATAN SARANA DAN PRASARANA APARATUR


LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU
EKONOMI (STIE) SYARIAH KAB. BENGKALIS

JUMLAH HARGA
PEKERJAAN
( Rp )

34,637,355.10
397,044.00
570,757,500.41
605,791,899.51

1,358,357,925.39
1,358,357,925.39

694,889,627.68
694,889,627.68
2,659,039,452.57
265,903,945.26
2,924,943,397.83
2,924,943,000.00

Bengkalis, 18 Mei 2015


Penawar,

PT. TIGA PUTRA WIJAYA

SUDIRMAN, ST
Kepala Cabang

DAFTAR KUANTITAS DAN HARGA


Rencana Anggaran Biaya ( RAB )
KEGIATAN
PEKERJAAN

: PENINGKATAN SARANA DAN PRASARANA APARATUR


: LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKO
SYARIAH KAB. BENGKALIS

NO. PAKET
: 5/ULP/POKJA I/DINASPU/V/2015
LOKASI
: KABUPATEN BENGKALIS
TAHUN ANGGARAN : 2015

NO.

URAIAN PEKERJAAN

SATUAN

VOL

A. LANTAI I (SATU)
I PEKERJAAN PENDAHULUAN
1

Pek. Pembersihan Lokasi

M2

826.97

Pek. Papan Nama Proyek

Ls

1.00

Pek. Pembuatan Direksi Keet

M2

20.00

II

PEKERJAAN TANAH/ PASIR

Pek. Galian Tanah Pondasi

M3

8.07

III

PEKERJAAN STRUKTUR

1
2
3
4
5
6
7

Pek. Cor Balok Sloof ( 1S4 - 15/20 ) Beton + Tulangan + Bekisting ( K 250 )
Pek. Cor Kolom Teras ( K9 ) Beton K 250 + Tulangan + Bekisting
Pek. Cor Kolom Lantai 1 Beton K 250 + Tulangan + Bekisting
Pek. Cor Kozen Pintu Utama Beton K 225 + Tulangan + Bekisting
Pek. Cor Balok Latey Selasar (B4 - 20/30) Beton K 225 + Tulangan + Bekisting Elv. + 2.25 m
Pek. Cor Plat Canopy Selasar T = 10 cm, Beton K 225 + Tulangan + Bekisting
Pek. Kepala Tiang Selasar 50/80, T = 10 cm, Beton K 225 + Tulangan + Bekisting

M3
M3
M3
M3
M3
M3
M3

0.59
3.91
71.59
1.50
8.78
4.77
1.64

B. LANTAI II ( DUA )
I PEKERJAAN STRUKTUR
1

Pek. Cor Balok Lantai (2B6 30/60) Beton K 225 + Tulangan + Bekisting

M3

3.89

Pek. Cor Balok Lantai ( 2B1 25/45 ) Beton K 225 + Tulangan + Bekisting

M3

32.74

Pek. Cor Balok Lantai ( 2B2 25/45 ) Beton K 225 + Tulangan + Bekisting

M3

4.05

Pek. Cor Balok Lantai ( 2B2 25/40 ) Beton K 225 + Tulangan + Bekisting

M3

20.52

Pek. Cor Balok Lantai ( 2B4 20/35 ) Beton K 225 + Tulangan + Bekisting

M3

16.38

NO.

URAIAN PEKERJAAN

SATUAN

VOL

Pek. Cor Balok Lantai ( 2B5 15/20 ) Beton K 225 + Tulangan + Bekisting

M3

2.86

Pek. Cor Balok Lantai ( 2B7 - 20/30 ) Beton K 225 + Tulangan + Bekisting

M3

2.86

Pek. Cor Balok Latey Teras (2B1 25/45) Beton K 225 + Tulangan + Bekisting Elv, +3,35 cm

M3

2.43

Pek. Cor Ring Balok Teras (3B1 25/45) Beton K 225 + Tulangan + Bekisting Elv, + 6.85 cm

M3

2.43

10

Pek. Cor List Plank Teras T = 10 cm, Beton K 225 + Tulangan + Bekisting

M3

4.54

11

Pek. Cor Plat Lantai K 225 + Tulangan + Bekisting

M3

79.19

12

Pek. Cor Plat Daag Selasar T = 10 cm, Beton K 225 + Tulangan + Bekisting

M3

18.81

13

Pek. Cor Kolom Lantai 2 Beton K 250 + Tulangan + Bekisting

M3

34.34

14

Pek. Cor Kolom Pedastal 1 Elv + 4.00 s/d Elv + 5.00 Beton K 225 + Tulangan + Bekisting

M3

0.54

15

Pek. Cor Ring Balok (RB3 20/30 ) Beton K 225 + Tulangan + Bekisting Elv. + 5.00

M3

3.00

NO.

URAIAN PEKERJAAN

SATUAN

VOL

C. LANTAI III ( TIGA )


I PEKERJAAN STRUKTUR
1

Pek. Cor Balok Lantai (3B6 30/60) Beton K 225 + Tulangan + Bekisting

M3

3.89

Pek. Cor Balok Lantai ( 3B1 25/45 ) Beton K 225 + Tulangan + Bekisting

M3

20.39

Pek. Cor Balok Lantai ( 3B2 25/45 ) Beton K 225 + Tulangan + Bekisting

M3

10.53

Pek. Cor Balok Lantai ( 3B3 25/40 ) Beton K 225 + Tulangan + Bekisting

M3

18.24

Pek. Cor Balok Lantai ( 3B5 15/20 ) Beton K 225 + Tulangan + Bekisting

M3

2.09

Pek. Cor Balok Lantai ( 3B7 20/30 ) Beton K 225 + Tulangan + Bekisting

M3

1.58

Pek. Cor Plat Lantai K 225 + Tulangan + Bekisting

M3

60.09

Bengkalis, 18

PT. TIGA PUTR

SUDIRMA

Kepala Ca

R KUANTITAS DAN HARGA

ncana Anggaran Biaya ( RAB )

NGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE)


NGKALIS

HARGA SATUAN

JUMLAH HARGA

(Rp)

( Rp)

1,830.00

1,513,355.10

350,000.00

350,000.00

1,638,700.00

32,774,000.00

Sub Jumlah

49,200.00

Sub Jumlah

5,982,884.80
6,278,226.85
6,278,226.85
6,278,226.85
5,253,897.60
5,591,616.34
6,709,085.40

Sub Jumlah

34,637,355.10

397,044.00

397,044.00

3,529,902.03
24,547,866.98
449,458,260.19
9,417,340.28
46,129,220.93
26,672,009.94
11,002,900.06

570,757,500.41

6,161,662.95

23,968,868.88

6,212,807.70

203,407,324.10

6,125,313.00

24,807,517.65

6,709,085.40

137,670,432.41

5,938,726.80

97,276,344.98

HARGA SATUAN

JUMLAH HARGA

(Rp)

( Rp)

6,252,135.00

17,881,106.10

5,253,897.60

15,026,147.14

6,212,807.70

15,097,122.71

6,212,807.70

15,097,122.71

5,591,616.34

25,385,938.18

5,591,616.34

442,800,097.95

5,591,616.34

105,178,303.35

6,278,226.85

215,594,310.03

6,306,660.00

3,405,596.40

5,253,897.60

15,761,692.80

Sub Jumlah

1,358,357,925.39

HARGA SATUAN

JUMLAH HARGA

(Rp)

( Rp)

6,161,662.95

23,968,868.88

6,212,807.70

126,679,149.00

6,125,313.00

64,499,545.89

6,709,085.40

122,373,717.70

6,252,135.00

13,066,962.15

5,253,897.60

8,301,158.21

5,591,616.34

336,000,225.86

Sub Jumlah
Bengkalis, 18 Mei 2015
Penawar,
PT. TIGA PUTRA WIJAYA

SUDIRMAN, ST
Kepala Cabang

694,889,627.68

DAFTAR ANALISA HARGA SATUAN PEKERJAAN


KEGIATAN
PEKERJAAN
NO. PAKET
LOKASI
TAHUN ANGGARAN
No.

: PENINGKATAN SARANA DAN PRASARANA APARATUR


: LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGG
EKONOMI (STIE) SYARIAH KAB. BENGKALIS
: 5/ULP/POKJA I/DINASPU/V/2015
: KABUPATEN BENGKALIS
: 2015

Jenis Pekerjaan

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan

1 M2 MEMBERSIHKAN LOKASI DAN LAPANGAN


TENAGA
Pekerja
Mandor

0.0100 Oh
0.0050 Oh

108,000.00
150,000.00
Jumlah

1 M2 PEK. KANTOR DIREKSI KEET, DEGAN LANTAI PLESTERAN


BAHAN
Dolken Kayu 8 - 10 / 400 cm
Kayu Balok
Paku
Besi Strip
Semen Portland
Pasir Pasang
Pasir Beton
Koral Beton
Bata Merah Kelas I
Seng Plat
Jendela Nako
Kaca Polos
Kunci Tanam
Plywood 4 mm
TENAGA
Tukang Kayu
Tukang Batu
Pekerja
Kepala Tukang
Mandor

1.2500
0.0900
0.6500
1.1000
35.0000
0.1500
0.1000
0.1300
30.0000
0.2500
2.0000
0.0800
0.1500
0.0600

Btg
M3
Kg
Kg
Kg
M3
M3
M3
Bh
Lbr
Bh
M2
Bh
Lbr

30,000.00
2,750,000.00
25,000.00
20,000.00
1,700.00
425,000.00
465,000.00
575,000.00
1,200.00
65,000.00
185,000.00
95,000.00
110,000.00
95,000.00

2.0000
1.0000
2.0000
0.3000
0.0500

Oh
Oh
Oh
Oh
Oh

118,000.00
118,000.00
108,000.00
138,000.00
150,000.00
Jumlah

1 M2 PEMBUATAN BEDENG BURUH


BAHAN
Dolken Kayu 8 - 10 / 400 cm
Kayu Balok
Paku
Semen Portland
Pasir Beton
Koral Beton
Seng Gelombang BJLS 32
Plywood 4 mm
TENAGA

1.2500
0.1860
0.3000
18.0000
0.0300
0.0500
0.2000
1.3500

Btg
M3
Kg
Kg
M3
M3
Lbr
Lbr

30,000.00
2,750,000.00
25,000.00
1,700.00
465,000.00
575,000.00
110,000.00
95,000.00

No.

Jenis Pekerjaan
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan
2.0000
1.0000
0.2000
0.0500

Oh
Oh
Oh
Oh

118,000.00
108,000.00
138,000.00
150,000.00
Jumlah

1 M2 PENGUPASAN HUMUS TANAH


TENAGA
Pekerja
Mandor

0.1400 Oh
0.0070 Oh

108,000.00
150,000.00
Jumlah

No.

Jenis Pekerjaan

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan

1 M2 PENGUKURAN DAN PEMASANGAN BOWPLANK


BAHAN
Kayu 5/7
Paku Biasa 2 - 5"
Papan 3/20

0.0012 M3
0.0200 Kg
0.0007 M3

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

0.1000
0.1000
0.0100
0.0050

Oh
Oh
Oh
Oh

2,200,000.00
25,000.00
1,800,000.00

118,000.00
108,000.00
138,000.00
150,000.00
Jumlah

1 M3 GALIAN TANAH SEDALAM 1 M


TENAGA
Pekerja
Mandor

0.4000 Oh
0.0400 Oh

108,000.00
150,000.00
Jumlah

1 M3 URUGAN KEMBALI
TENAGA
Pekerja
Mandor

0.1920 Oh
0.0400 Oh

108,000.00
150,000.00
Jumlah

1 M3 PEMADATAN ( PAKAI ALAT )


TENAGA
Pekerja
Mandor

0.5000 Oh
0.0400 Oh

108,000.00
150,000.00

ALAT
Jump Stamper

0.0500 Jam

150,000.00
Jumlah

1 M3 URUGAN TANAH BIASA


BAHAN
Tanah Timbunan

1.2000 M3

165,000.00

TENAGA
Pekerja
Mandor

0.3300 Oh
0.0100 Oh

108,000.00
150,000.00
Jumlah

10

1 M3 URUGAN TANAH PILIHAN


BAHAN
Tanah Urugan Pilihan

1.2000 M3

350,000.00

TENAGA
Pekerja
Mandor

0.3000 Oh
0.0100 Oh

108,000.00
150,000.00

ALAT

No.

Jenis Pekerjaan
Wheel Loader
Dump Truck
Vibro Roller
Water Tanker
Alat Bnatu

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan
0.0178
0.2289
0.0100
0.0070
1.0000

Jam
Jam
Jam
Jam
Ls

560,000.00
385,000.00
485,000.00
278,000.00
5,000.00
Jumlah

No.

11

Jenis Pekerjaan

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan

1 M3 TIMBUNAN PASIR URUG


BAHAN
Pasir Urug

1.2000 M3

415,000.00

TENAGA
Pekerja
Mandor

0.3000 Oh
0.0100 Oh

108,000.00
150,000.00
Jumlah

12

1 M3 TIMBUNAN AGREGRAT KELAS A


BAHAN
Agregrat Kelas A

1.2000 M3

850,000.00

TENAGA
Pekerja
Mandor

0.0625 Oh
0.0089 Oh

108,000.00
150,000.00

ALAT
Wheel Loader
Dump Truck
Vibro Roller
Water Tanker
Alat Bnatu

0.0089
0.0284
0.0117
0.0214
1.0000

560,000.00
385,000.00
485,000.00
278,000.00
5,000.00

Jam
Jam
Jam
Jam
Ls

Jumlah
13

1 M3 URUGAN / RABAT KERIKIL


BAHAN
Kerikil

1.2000 M3

575,000.00

TENAGA
Pekerja
Mandor

0.3000 Oh
0.0100 Oh

108,000.00
150,000.00
Jumlah

14

1 M2 PEMADATAN ( PAKAI ALAT )


TENAGA
Pekerja
Mandor

0.5000 Oh
0.0400 Oh

108,000.00
150,000.00

ALAT
Jump Stamper

0.0500 Jam

150,000.00
Jumlah

15

1 M3 BETON COR 1:3:5


BAHAN
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Kepala Tukang

0.8700 M3
0.5200 M3
218.0000 Kg

575,000.00
465,000.00
1,700.00

1.6500 Oh
0.2500 Oh
0.0250 Oh

108,000.00
118,000.00
138,000.00

No.

Jenis Pekerjaan
Mandor

Indeks dan
Satuan
0.0800 Oh

Harga Bahan dan


Upah
(Rp)
150,000.00
Jumlah

No.

Jenis Pekerjaan

16

1 Kg PEMBESIAN DENGAN BESI POLOS DAN ULIR

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan

BAHAN
Besi Beton
Kawat Ikat Beton

1.0500 Kg
0.0150 Kg

TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor

0.0070
0.0070
0.0070
0.0030

Oh
Oh
Oh
Oh

14,000.00
45,000.00

108,000.00
118,000.00
138,000.00
150,000.00
Jumlah

17

1 Lbr WIRE MESH 5,4 x 2,1 TYPE M8 - 150


BAHAN
Wire Mesh 5,4 x 2,1 Type M8 - 150
Kawat Ikat Beton

1.1000 Lbr
0.2500 Lbr

850,500.00
45,000.00

TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor

0.1342
0.0070
0.0070
0.0178

108,000.00
118,000.00
138,000.00
150,000.00

Oh
Oh
Oh
Oh

Jumlah
18

1 M2 PEKERJAAN BEKISTING PLAT LANTAI


BAHAN
Paku 2" - 5"
Minyak Bekisting
Kayu
Plywood tebal 9 mm
Kayu Dolken

0.0400
0.2000
0.0144
0.3500
6.0000

Kg
Ltr
M3
Lbr
Btg

25,000.00
25,000.00
2,750,000.00
140,000.00
30,000.00

TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.3200
0.3300
0.0330
0.0060

Oh
Oh
Oh
Oh

108,000.00
118,000.00
138,000.00
150,000.00
Jumlah

19

1 M3 BETON COR 1:2:3


BAHAN
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.8200 M3
0.5400 M3
340.0000 Kg

1.6500
0.2500
0.0250
0.0800

Oh
Oh
Oh
Oh

575,000.00
465,000.00
1,700.00

108,000.00
118,000.00
138,000.00
150,000.00
Jumlah

20

1 M3 BETON COR K-250

No.

Jenis Pekerjaan
BAHAN
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan

0.5000 M3
0.4900 M3
352.5000 Kg

1.6500
0.2500
0.0250
0.0800

Oh
Oh
Oh
Oh

575,000.00
465,000.00
1,700.00

108,000.00
118,000.00
138,000.00
150,000.00
Jumlah

No.

21

Jenis Pekerjaan

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan

1 M3 MEMBUAT PONDASI BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Ulir
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.2000
1.5000
0.4000
202.7274
3.0000
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

3.9000
0.3500
1.0400
1.0500
0.2450
0.1650

Oh
Oh
Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00
138,000.00
150,000.00
Jumlah

22

1 M3 MEMBUAT SLOOF 30 x 60 CM BETON BERTULANG K 225 + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.1875
2.0000
0.6000
156.5977
3.0000
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

4.8500
0.3500
1.5600
1.4000
0.3310
0.1700

Oh
Oh
Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00
138,000.00
150,000.00
Jumlah

23

1 M3 MEMBUAT SLOOF 25 x 45 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi

0.1875
2.0000
0.6000
190.1593
2.8524
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

4.8500
0.3500
1.5600
1.4000

Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00

No.

Jenis Pekerjaan
Kepala Tukang
Mandor

Indeks dan
Satuan
0.3310 Oh
0.1700 Oh

Harga Bahan dan


Upah
(Rp)
138,000.00
150,000.00
Jumlah

No.

24

Jenis Pekerjaan

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan

1 M3 MEMBUAT SLOOF 25 x 40 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.1875
2.0000
0.6000
198.3391
2.9751
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

4.8500
0.3500
1.5600
1.4000
0.3310
0.1700

Oh
Oh
Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00
138,000.00
150,000.00
Jumlah

25

1 M3 MEMBUAT SLOOF 20 x 30 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.1875
2.0000
0.6000
199.6569
2.9949
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

4.8500
0.3500
1.5600
1.4000
0.3310
0.1700

Oh
Oh
Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00
138,000.00
150,000.00
Jumlah

26

1 M3 MEMBUAT SLOOF 15 x 20 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi

0.1875
2.0000
0.6000
192.2622
2.8839
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

4.8500
0.3500
1.5600
1.4000

Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00

No.

Jenis Pekerjaan
Kepala Tukang
Mandor

Indeks dan
Satuan
0.3310 Oh
0.1700 Oh

Harga Bahan dan


Upah
(Rp)
138,000.00
150,000.00
Jumlah

No.

27

Jenis Pekerjaan

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan

1 M3 MEMBUAT KOLOM 40 x 40 CM BETON BERTULANG K 250 + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.0393
4.0000
0.6000
195.9389
3.0000
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

7.3000
0.3500
3.3000
2.1000
0.5700
0.1800

Oh
Oh
Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00
138,000.00
150,000.00
Jumlah

28

1 M3 MEMBUAT KOLOM 35 x 35 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.1667
4.0000
0.6000
195.9389
3.0000
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

7.3000
0.3500
3.3000
2.1000
0.5700
0.1800

Oh
Oh
Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00
138,000.00
150,000.00
Jumlah

29

1 M3 MEMBUAT KOLOM PEDESTEL 30 x 30 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi

0.4000
4.0000
0.6000
140.0000
2.1000
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

7.3000
0.3500
3.3000
2.1000

Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00

No.

Jenis Pekerjaan
Kepala Tukang
Mandor

Indeks dan
Satuan
0.5700 Oh
0.1800 Oh

Harga Bahan dan


Upah
(Rp)
138,000.00
150,000.00
Jumlah

No.

30

Jenis Pekerjaan

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan

1 M3 MEMBUAT KOLOM 25 x 25 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.3333
4.0000
0.6000
208.0000
3.1200
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

7.3000
0.3500
3.3000
2.1000
0.5700
0.1800

Oh
Oh
Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00
138,000.00
150,000.00
Jumlah

31

1 M3 MEMBUAT KOLOM 20 x 20 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.6666
4.0000
0.6000
244.0000
3.6600
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

7.3000
0.3500
3.3000
2.1000
0.5700
0.1800

Oh
Oh
Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00
138,000.00
150,000.00
Jumlah

32

1 M3 MEMBUAT KOLOM 11 x 15 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi

0.6666
4.0000
0.6000
115.0000
1.7250
0.5000
0.4900
275.0000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

7.3000
0.3500
3.3000
2.1000

Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00

No.

Jenis Pekerjaan
Kepala Tukang
Mandor

Indeks dan
Satuan
0.5700 Oh
0.1800 Oh

Harga Bahan dan


Upah
(Rp)
138,000.00
150,000.00
Jumlah

No.

33

Jenis Pekerjaan

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan

1 M3 MEMBUAT KOLOM 40 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.6666
4.0000
0.6000
181.0000
2.7150
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

7.3000
0.3500
3.3000
2.1000
0.5700
0.1800

Oh
Oh
Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00
138,000.00
150,000.00
Jumlah

34

1 M3 MEMBUAT KOLOM 35 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.6666
4.0000
0.6000
231.0000
3.4650
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

7.3000
0.3500
3.3000
2.1000
0.5700
0.1800

Oh
Oh
Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00
138,000.00
150,000.00
Jumlah

35

1 M3 MEMBUAT KOLOM 30 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi

0.6666
4.0000
0.6000
227.0000
3.4050
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

7.3000
0.3500
3.3000
2.1000

Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00

No.

Jenis Pekerjaan
Kepala Tukang
Mandor

Indeks dan
Satuan
0.5700 Oh
0.1800 Oh

Harga Bahan dan


Upah
(Rp)
138,000.00
150,000.00
Jumlah

No.

36

Jenis Pekerjaan

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan

1 M3 MEMBUAT KOLOM 20 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.6666
4.0000
0.6000
292.0000
4.3800
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

7.3000
0.3500
3.3000
2.1000
0.5700
0.1800

Oh
Oh
Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00
138,000.00
150,000.00
Jumlah

37

1 M3 MEMBUAT BALOK 30 x 60 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.1785
3.2000
1.6000
166.7323
2.5010
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

7.3000
0.3500
3.3000
2.1000
0.5700
0.1800

Oh
Oh
Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00
138,000.00
150,000.00
Jumlah

38

1 M3 MEMBUAT BALOK 1, 25 x 45 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi

0.1785
3.2000
1.6000
169.7098
2.5458
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

7.3000
0.3500
3.3000
2.1000

Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00

No.

Jenis Pekerjaan
Kepala Tukang
Mandor

Indeks dan
Satuan
0.5700 Oh
0.1800 Oh

Harga Bahan dan


Upah
(Rp)
138,000.00
150,000.00
Jumlah

No.

39

Jenis Pekerjaan

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan

1 M3 MEMBUAT BALOK 2, 25 x 45 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.1785
3.2000
1.6000
164.6160
2.4692
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

7.3000
0.3500
3.3000
2.1000
0.5700
0.1800

Oh
Oh
Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00
138,000.00
150,000.00
Jumlah

40

1 M3 MEMBUAT BALOK 25 x 40 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.1785
3.2000
1.6000
197.4966
3.3857
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

7.3000
0.3500
3.3000
2.1000
0.5700
0.1800

Oh
Oh
Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00
138,000.00
150,000.00
Jumlah

41

1 M3 MEMBUAT BALOK 20 x 60 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi

0.1785
3.2000
1.6000
169.0000
2.5350
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

7.3000
0.3500
3.3000
2.1000

Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00

No.

Jenis Pekerjaan
Kepala Tukang
Mandor

Indeks dan
Satuan
0.5700 Oh
0.1800 Oh

Harga Bahan dan


Upah
(Rp)
138,000.00
150,000.00
Jumlah

No.

42

Jenis Pekerjaan

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan

1 M3 MEMBUAT BALOK 20 x 40 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.1785
3.2000
1.6000
187.0000
2.8050
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

7.3000
0.3500
3.3000
2.1000
0.5700
0.1800

Oh
Oh
Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00
138,000.00
150,000.00
Jumlah

43

1 M3 MEMBUAT BALOK 20 x 35 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.1785
3.2000
1.6000
152.2692
2.8500
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

7.3000
0.3500
3.3000
2.1000
0.5700
0.1800

Oh
Oh
Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00
138,000.00
150,000.00
Jumlah

44

1 M3 MEMBUAT BALOK 20 x 30 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi

0.1785
3.2000
1.6000
113.8784
1.7082
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

7.3000
0.3500
3.3000
2.1000

Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00

No.

Jenis Pekerjaan
Kepala Tukang
Mandor

Indeks dan
Satuan
0.5700 Oh
0.1800 Oh

Harga Bahan dan


Upah
(Rp)
138,000.00
150,000.00
Jumlah

No.

45

Jenis Pekerjaan

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan

1 M3 MEMBUAT BALOK 15 x 20 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.1785
3.2000
1.6000
172.0000
2.5800
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

7.3000
0.3500
3.3000
2.1000
0.5700
0.1800

Oh
Oh
Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00
138,000.00
150,000.00
Jumlah

46

1 M3 MEMBUAT TANGGA BETON BERTULANG (170 Kg + BEKISTING )


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
Plywood 9 mm
Dolken 8 / 4 m
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.2500
3.0000
1.2000
170.0000
3.0000
0.7800
0.5200
323.0000
2.5000
14.0000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg
Lbr
Btg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00
140,000.00
30,000.00

5.6000
0.3500
2.3000
1.4000
0.4050
0.2020

Oh
Oh
Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00
138,000.00
150,000.00
Jumlah

47

1 M3 MEMBUAT PLAT DAAG BETON BERTULANG + BEKISTING


Beton
Besi Tulangan
Bekisting

1.0000 M3
120.4534 Kg
8.3000 M2

1,337,750.00
18,373.00
353,554.00
Jumlah

48

1 M3 MEMBUAT PLAT CANOPY BETON BERTULANG + BEKISTING


Beton
Besi Tulangan
Bekisting

1.0000 M3
196.7890 Kg
7.6820 M2

1,337,750.00
18,373.00
83,085.40
Jumlah

No.
49

Jenis Pekerjaan

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan

1 M' SALURAN KELILING PAS. BATA 1/2 BATU


Pas. Bata 1/2 Batu 1 : 4
Plesteran 1 : 2
Cor Beton 1 : 3 : 5
Besi Gril 19 mm + Besi Siku

0.5000
1.0000
0.0225
1.0000

M2
M2
M3
M'

149,570.00
80,300.80
1,335,800.00
115,000.00
Jumlah

No.

Jenis Pekerjaan

50

1 M2 PEKERJAAN BEKISTING LIST PLANK BETON

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan

BAHAN
Paku 2" - 5"
Minyak Bekisting
Kayu
Plywood tebal 9 mm

0.0400
0.2000
0.0072
0.3470

Kg
Ltr
M3
Lbr

25,000.00
25,000.00
2,750,000.00
140,000.00

TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0320
0.0330
0.0033
0.0060

Oh
Oh
Oh
Oh

108,000.00
118,000.00
138,000.00
150,000.00
Jumlah

51

1 M2 PAS. DINDING BATU BATA 1/2 BATU 1 : 4


BAHAN
Batu Bata
Semen
Pasir Pasang
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

80.0000 Bh
0.4500 Kg
0.0450 M3

0.0400
0.2000
0.0200
0.0200

Oh
Oh
Oh
Oh

1,200.00
1,700.00
425,000.00

108,000.00
118,000.00
138,000.00
150,000.00
Jumlah

52

1 M2 PAS. DINDING BATU BATA 1/2 BATU 1 : 2


BAHAN
Batu Bata
Semen
Pasir Pasang
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

80.0000 Bh
0.5000 Kg
0.0500 M3

0.0400
0.2000
0.0200
0.0200

Oh
Oh
Oh
Oh

1,200.00
1,700.00
425,000.00

108,000.00
118,000.00
138,000.00
150,000.00
Jumlah

53

1 M2 PLESTERAN 1 : 2
BAHAN
Semen
Pasir Pasang
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

10.2240 Kg
0.0200 M3

0.3000
0.1500
0.0150
0.0150

Oh
Oh
Oh
Oh

1,700.00
425,000.00

108,000.00
118,000.00
138,000.00
150,000.00
Jumlah

54

1 M2 PAS. PONDASI BATU BATA 1 BATU 1:4

No.

Jenis Pekerjaan
BAHAN
Batu Bata
Semen
Pasir Pasang
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan

140.000 Bh
26.5500 Kg
0.0930 M3

0.6500
0.2000
0.0200
0.0300

Oh
Oh
Oh
Oh

1,200.00
1,700.00
425,000.00

108,000.00
118,000.00
138,000.00
150,000.00
Jumlah

LISA HARGA SATUAN PEKERJAAN

INGKATAN SARANA DAN PRASARANA APARATUR


JUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU
NOMI (STIE) SYARIAH KAB. BENGKALIS

Jumlah Harga
(Rp)
LAPANGAN

1,080.00
750.00
1,830.00

DEGAN LANTAI PLESTERAN

37,500.00
247,500.00
16,250.00
22,000.00
59,500.00
63,750.00
46,500.00
74,750.00
36,000.00
16,250.00
370,000.00
7,600.00
16,500.00
5,700.00

236,000.00
118,000.00
216,000.00
41,400.00
7,500.00
1,638,700.00

37,500.00
511,500.00
7,500.00
30,600.00
13,950.00
28,750.00
22,000.00
128,250.00

Jumlah Harga
(Rp)
236,000.00
108,000.00
27,600.00
7,500.00
1,159,150.00

15,120.00
1,050.00
16,170.00

Jumlah Harga
(Rp)

GAN BOWPLANK

2,640.00
500.00
1,260.00

11,800.00
10,800.00
1,380.00
750.00
29,130.00

43,200.00
6,000.00
49,200.00

20,736.00
6,000.00
26,736.00

54,000.00
6,000.00

7,500.00
67,500.00

198,000.00

35,640.00
1,500.00
235,140.00

420,000.00

32,400.00
1,500.00

Jumlah Harga
(Rp)
9,968.00
88,126.50
4,850.00
1,946.00
5,000.00
563,790.50

Jumlah Harga
(Rp)

498,000.00

32,400.00
1,500.00
531,900.00
A

1,020,000.00

6,750.00
1,335.00

4,984.00
10,934.00
5,674.50
5,949.20
5,000.00
1,060,626.70

690,000.00

32,400.00
1,500.00
723,900.00

54,000.00
6,000.00

7,500.00
67,500.00

500,250.00
241,800.00
370,600.00

178,200.00
29,500.00
3,450.00

Jumlah Harga
(Rp)
12,000.00
1,335,800.00

Jumlah Harga
(Rp)

14,700.00
675.00

756.00
826.00
966.00
450.00
18,373.00

935,550.00
11,250.00

14,493.60
826.00
966.00
2,670.00
965,755.60

1,000.00
5,000.00
39,600.00
49,000.00
180,000.00

34,560.00
38,940.00
4,554.00
900.00
353,554.00

471,500.00
251,100.00
578,000.00

178,200.00
29,500.00
3,450.00
12,000.00
1,523,750.00

Jumlah Harga
(Rp)
287,500.00
227,850.00
599,250.00

178,200.00
29,500.00
3,450.00
12,000.00
1,337,750.00

Jumlah Harga
(Rp)

ERTULANG + BEKISTING

550,000.00
37,500.00
10,000.00
3,345,002.10
135,000.00
287,500.00
227,850.00
599,250.00

421,200.00
41,300.00
122,720.00
123,900.00
33,810.00
24,750.00
5,959,782.10

BETON BERTULANG K 225 + BEKISTING

515,625.00
50,000.00
15,000.00
2,583,862.05
135,000.00
287,500.00
227,850.00
599,250.00

523,800.00
41,300.00
184,080.00
165,200.00
45,678.00
25,500.00
5,399,645.05

BETON BERTULANG + BEKISTING

515,625.00
50,000.00
15,000.00
3,137,628.45
128,358.00
287,500.00
227,850.00
599,250.00

523,800.00
41,300.00
184,080.00
165,200.00

Jumlah Harga
(Rp)
45,678.00
25,500.00
5,946,769.45

Jumlah Harga
(Rp)

BETON BERTULANG + BEKISTING

515,625.00
50,000.00
15,000.00
3,272,595.15
133,879.50
287,500.00
227,850.00
599,250.00

523,800.00
41,300.00
184,080.00
165,200.00
45,678.00
25,500.00
6,087,257.65

BETON BERTULANG + BEKISTING

515,625.00
50,000.00
15,000.00
3,294,338.85
134,770.50
287,500.00
227,850.00
599,250.00

523,800.00
41,300.00
184,080.00
165,200.00
45,678.00
25,500.00
6,109,892.35

BETON BERTULANG + BEKISTING

515,625.00
50,000.00
15,000.00
3,172,326.30
129,775.50
287,500.00
227,850.00
599,250.00

523,800.00
41,300.00
184,080.00
165,200.00

Jumlah Harga
(Rp)
45,678.00
25,500.00
5,982,884.80

Jumlah Harga
(Rp)

BETON BERTULANG K 250 + BEKISTING

108,075.00
100,000.00
15,000.00
3,232,991.85
135,000.00
287,500.00
227,850.00
599,250.00

788,400.00
41,300.00
389,400.00
247,800.00
78,660.00
27,000.00
6,278,226.85

BETON BERTULANG + BEKISTING

458,425.00
100,000.00
15,000.00
3,232,991.85
135,000.00
287,500.00
227,850.00
599,250.00

788,400.00
41,300.00
389,400.00
247,800.00
78,660.00
27,000.00
6,628,576.85

30 x 30 CM BETON BERTULANG + BEKISTING

1,100,000.00
100,000.00
15,000.00
2,310,000.00
94,500.00
287,500.00
227,850.00
599,250.00

788,400.00
41,300.00
389,400.00
247,800.00

Jumlah Harga
(Rp)
78,660.00
27,000.00
6,306,660.00

Jumlah Harga
(Rp)

BETON BERTULANG + BEKISTING

916,575.00
100,000.00
15,000.00
3,432,000.00
140,400.00
287,500.00
227,850.00
599,250.00

788,400.00
41,300.00
389,400.00
247,800.00
78,660.00
27,000.00
7,291,135.00

BETON BERTULANG + BEKISTING

1,833,150.00
100,000.00
15,000.00
4,026,000.00
164,700.00
287,500.00
227,850.00
599,250.00

788,400.00
41,300.00
389,400.00
247,800.00
78,660.00
27,000.00
8,826,010.00

BETON BERTULANG + BEKISTING

1,833,150.00
100,000.00
15,000.00
1,897,500.00
77,625.00
287,500.00
227,850.00
467,500.00

788,400.00
41,300.00
389,400.00
247,800.00

Jumlah Harga
(Rp)
78,660.00
27,000.00
6,478,685.00

Jumlah Harga
(Rp)

ETON BERTULANG + BEKISTING

1,833,150.00
100,000.00
15,000.00
2,986,500.00
122,175.00
287,500.00
227,850.00
599,250.00

788,400.00
41,300.00
389,400.00
247,800.00
78,660.00
27,000.00
7,743,985.00

ETON BERTULANG + BEKISTING

1,833,150.00
100,000.00
15,000.00
3,811,500.00
155,925.00
287,500.00
227,850.00
599,250.00

788,400.00
41,300.00
389,400.00
247,800.00
78,660.00
27,000.00
8,602,735.00

ETON BERTULANG + BEKISTING

1,833,150.00
100,000.00
15,000.00
3,745,500.00
153,225.00
287,500.00
227,850.00
599,250.00

788,400.00
41,300.00
389,400.00
247,800.00

Jumlah Harga
(Rp)
78,660.00
27,000.00
8,534,035.00

Jumlah Harga
(Rp)

ETON BERTULANG + BEKISTING

1,833,150.00
100,000.00
15,000.00
4,818,000.00
197,100.00
287,500.00
227,850.00
599,250.00

788,400.00
41,300.00
389,400.00
247,800.00
78,660.00
27,000.00
9,650,410.00

BETON BERTULANG + BEKISTING

490,875.00
80,000.00
40,000.00
2,751,082.95
112,545.00
287,500.00
227,850.00
599,250.00

788,400.00
41,300.00
389,400.00
247,800.00
78,660.00
27,000.00
6,161,662.95

M BETON BERTULANG + BEKISTING

490,875.00
80,000.00
40,000.00
2,800,211.70
114,561.00
287,500.00
227,850.00
599,250.00

788,400.00
41,300.00
389,400.00
247,800.00

Jumlah Harga
(Rp)
78,660.00
27,000.00
6,212,807.70

Jumlah Harga
(Rp)

M BETON BERTULANG + BEKISTING

490,875.00
80,000.00
40,000.00
2,716,164.00
111,114.00
287,500.00
227,850.00
599,250.00

788,400.00
41,300.00
389,400.00
247,800.00
78,660.00
27,000.00
6,125,313.00

BETON BERTULANG + BEKISTING

490,875.00
80,000.00
40,000.00
3,258,693.90
152,356.50
287,500.00
227,850.00
599,250.00

788,400.00
41,300.00
389,400.00
247,800.00
78,660.00
27,000.00
6,709,085.40

BETON BERTULANG + BEKISTING

490,875.00
80,000.00
40,000.00
2,788,500.00
114,075.00
287,500.00
227,850.00
599,250.00

788,400.00
41,300.00
389,400.00
247,800.00

Jumlah Harga
(Rp)
78,660.00
27,000.00
6,200,610.00

Jumlah Harga
(Rp)

BETON BERTULANG + BEKISTING

490,875.00
80,000.00
40,000.00
3,085,500.00
126,225.00
287,500.00
227,850.00
599,250.00

788,400.00
41,300.00
389,400.00
247,800.00
78,660.00
27,000.00
6,509,760.00

BETON BERTULANG + BEKISTING

490,875.00
80,000.00
40,000.00
2,512,441.80
128,250.00
287,500.00
227,850.00
599,250.00

788,400.00
41,300.00
389,400.00
247,800.00
78,660.00
27,000.00
5,938,726.80

BETON BERTULANG + BEKISTING

490,875.00
80,000.00
40,000.00
1,878,993.60
76,869.00
287,500.00
227,850.00
599,250.00

788,400.00
41,300.00
389,400.00
247,800.00

Jumlah Harga
(Rp)
78,660.00
27,000.00
5,253,897.60

Jumlah Harga
(Rp)

BETON BERTULANG + BEKISTING

490,875.00
80,000.00
40,000.00
2,838,000.00
116,100.00
287,500.00
227,850.00
599,250.00

788,400.00
41,300.00
389,400.00
247,800.00
78,660.00
27,000.00
6,252,135.00

ERTULANG (170 Kg + BEKISTING )

687,500.00
75,000.00
30,000.00
2,805,000.00
135,000.00
448,500.00
241,800.00
549,100.00
350,000.00
420,000.00

604,800.00
41,300.00
271,400.00
165,200.00
55,890.00
30,300.00
6,910,790.00
BERTULANG + BEKISTING
1,337,750.00
2,213,090.32
2,934,498.20
6,485,338.52

ON BERTULANG + BEKISTING
1,337,750.00
3,615,604.30
638,262.04
5,591,616.34

Jumlah Harga
(Rp)

A 1/2 BATU
74,785.00
80,300.80
30,055.50
115,000.00
300,141.30

Jumlah Harga
(Rp)

PLANK BETON

1,000.00
5,000.00
19,800.00
48,580.00

3,456.00
3,894.00
455.40
900.00
83,085.40

BATU 1 : 4

96,000.00
765.00
19,125.00

4,320.00
23,600.00
2,760.00
3,000.00
149,570.00

BATU 1 : 2

ATU 1:4

96,000.00
850.00
21,250.00

4,320.00
23,600.00
2,760.00
3,000.00
151,780.00

17,380.80
8,500.00

32,400.00
17,700.00
2,070.00
2,250.00
80,300.80

Jumlah Harga
(Rp)
168,000.00
45,135.00
39,525.00

70,200.00
23,600.00
2,760.00
4,500.00
353,720.00

DAFTAR HARGA SATUAN UPAH DAN BAHAN


KECAMATAN BENGKALIS
TAHUN ANGGARAN 2015
KEGIATAN
PEKERJAAN

: PENINGKATAN SARANA DAN PRASARANA APARATUR


: LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU
EKONOMI (STIE) SYARIAH KAB. BENGKALIS
NO. PAKET
: 5/ULP/POKJA I/DINASPU/V/2015
LOKASI
: KABUPATEN BENGKALIS
TAHUN ANGGARAN : 2015
JENIS

NO

UPAH DAN BAHAN

SATUAN

A. BAHAN PASANGAN

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

B. BAHAN KAYU

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Agregrat Kelas A
Agregrat Kelas B
Agregrat Kelas C
Aspal
Batu Bata
Batu Kali
Filler
Kerikil / Koral
Material Pilihan ( Sirtu )
Pasir Pasang
Pasir Beton
Pasir Plester
Pasir Urug
Semen Portland @ 50 Kg
Semen Portland
Semen Putih
Semen Putih
Teer
Tiang Pancang 20 x 20 x 6
Tanah Timbunan
Tanah Urug Pilihan
Balok Kayu Kelas II / Meranti
Balok Kayu Kelas I / Punak
Cerocok Kayu 12 - 15" Pjg. 6 M
Cerocok Kayu 4 - 6" Pjg. 6 M
Kayu Dolken
Kayu Bakar
Papan 3/4"
Papan Bekisting
Papan Bekisting
Papan Bouwplank
Plywood 4 mm
Plywood 9 mm
Tiang Kayu 15 - 20 cm Pjg. 6 M
Kayu 5/7

M3
M3
M3
Kg
Bh
M3
Kg
M3
M3
M3
M3
M3
M3
Zak
Kg
Zak
Kg
Kg
M'
M3
M3
M3
M3
Btg
Btg
Btg
M3
Lembar
M3
M2
Lembar
Lembar
Lembar
M'
M3

C. BANAH BESI, MINYA


DAN LAIN - LAIN

D. TENAGA KERJA

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

1
2
3
4
5
6
7

Baut dan Mur


Btg
Besi Beton Polos
Kg
Besi Beton Ulir
Kg
Wire Mesh 5,4 x 2,1 Type M8
Lembar
Besi Baut Steinless Steel
Bh
Besi Angkur
Bh
Plat Galvanis 20 cm
Bh
Oksigen
Tbg
Acetelin
Tbg
Kawat Las
Kg
Pipa Baja 2,5" ( Tebal 1,5 mm )
M'
Pipa Baja 2" ( Tebal 1,5 mm )
M'
Pipa Besi Galvanis 4" ( Tebal 2,3 mm
M'
Pipa Besi galvanis 2,5" ( Tebal 1,5 mm
M'
Pipa Besi Galvanis 2" ( Tebal 1,5 mm )
M'
Pipa Besi Galvanis 1,5" ( Tebl 1.5 mm
M'
Pipa Besi 1 1/4" (Tebal 1,5 mm )
M'
Pipa Besi 1" ( Tebal 1 mm )
M'
Besi Strip
Kg
Mesin Las
Jam
Besi Grill 19 mm + Besi Siku
M'
Kawat Ikat Beton
Kg
Paku Beton
Kotak
Paku Putih/ Jembatan
Kg
Paku Biasa 1-5"
Kg
Paku Biasa Halus
kg
Paku Sekrup
kg
Paku Seng
Kg
Minyak Bensin
Ltr
Minyak Pelumas Olie
Ltr
Minyak Solar
Ltr
Minyak Tanah
Ltr
Minyak Bekisting
Ltr
Plastik Alas
M2
Paku Alumunium
Kg
Seng Plat
Lembar
Kaca Polos
M2
Jendela Nako
Bh
Seng Gelombang BJLS 32
Lembar
Kunci Tanam
Bh

Kepala Tukang
Tukang Batu
Tukang Kayu
Tukang Cat
Tukang Besi
Mandor
Pekerja

Orang
Orang
Orang
Orang
Orang
Orang
Orang

/
/
/
/
/
/
/

Hari
Hari
Hari
Hari
Hari
Hari
Hari

RGA SATUAN UPAH DAN BAHAN


ECAMATAN BENGKALIS

TAHUN ANGGARAN 2015

ATAN SARANA DAN PRASARANA APARATUR


PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU
(STIE) SYARIAH KAB. BENGKALIS

HARGA SATUAN
( Rp )
5
850,000.00
720,000.00
680,000.00
17,000.00
1,200.00
450,000.00
2,000.00
575,000.00
525,000.00
425,000.00
465,000.00
415,000.00
415,000.00
85,000.00
1,700.00
65,000.00
1,300.00
17,000.00
280,000.00
165,000.00
350,000.00
2,750,000.00
3,600,000.00
35,000.00
15,000.00
30,000.00
450,000.00
85,000.00
1,800,000.00
6,500.00
65,000.00
95,000.00
140,000.00
35,000.00
2,200,000.00

5,000.00
14,000.00
16,500.00
850,500.00
8,000.00
15,000.00
2,700,000.00
1,200,000.00
1,200,000.00
75,000.00
275,000.00
165,000.00
450,000.00
280,000.00
170,000.00
130,000.00
97,000.00
85,000.00
20,000.00
157,000.00
115,000.00
45,000.00
35,000.00
26,000.00
25,000.00
25,000.00
30,000.00
25,000.00
12,000.00
35,000.00
15,000.00
13,000.00
25,000.00
7,000.00
45,000.00
65,000.00
95,000.00
185,000.00
110,000.00
110,000.00

138,000.00
118,000.00
118,000.00
118,000.00
118,000.00
150,000.00
108,000.00

TIME SCHEDULE

NO.

KEGIATAN

PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN

LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

NO. PAKET

5/ULP/POKJA I/DINASPU/V/2015

LOKASI

KABUPATEN BENGKALIS

T. A

2015
WAKTU PELAKSANAAN 150 HARI

BOBOT

URAIAN PEKERJAAN

BULAN I
1

BULAN II
4

BULAN III
8

10

11

BULAN IV
12

13

14

15

MASA PEMELIHARAAN
180 HARI KALENDER

BULAN V
16

17

18

19

20

II

III IV

VI

SKALA
KURVA
100%

A.

LANTAI I ( SATU )

I
II
III

PEKERJAAN PENDAHULUAN
PEKERJAAN TANAH/ PASIR
PEKERJAAN STRUKTUR

B.

LANTAI II ( DUA )

PEKERJAAN STRUKTUR

C.

LANTAI III ( TIGA )

PEKERJAAN STRUKTUR

1.30
0.01
21.46

1.30
0.01
1.82

5.07

5.99

5.43

51.08

5.16

6.46

8.35

8.87

7.37

0.87

1.87

0.41

2.62

2.03

2.16

2.59

26.13

2.26

4.02

5.98

6.22

6.08

2.74

0.48

3.83

0%
Jumlah Rencana
Komulatif Rencana
Jumlah Realisasi
Komulatif Realisasi
Deviasi

100.00

3.14

5.07

0.00

3.14

8.21 14.21 19.63 24.79 31.25 39.59 48.47 55.84 59.33 63.23 65.79 68.39 72.41 78.39 84.61 90.69 96.78 99.52 100.0

5.99

5.43

5.16

6.46

8.35

8.87

7.37

3.49

3.90

2.57

2.59

4.02

5.98

6.22

6.08

6.10

2.74

0.48

Bengkalis, 18 Mei 2015


Penawar,
PT. TIGA PUTRA WIJAYA

SUDIRMAN, ST
Kepala Cabang

JADWAL WAKTU PELAKSANAAN S/D PHO


NO.

URAIAN PEKERJAAN

KEGIATAN
PEKERJAAN
NO. PAKET
LOKASI
T. A
BOBOT
%

0.06
0.01
1.23

0.06
0.01
1.23

0.01

0.01

0.13
0.92
16.90
0.35
1.73
1.00
0.41

0.13

:
:
:
:
:

PENINGKATAN SARANA DAN PRASARANA APARATUR


LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
5/ULP/POKJA I/DINASPU/V/2015
KABUPATEN BENGKALIS
2015
WAKTU PELAKSANAAN 150 HARI
BULAN I
BULAN II
BULAN III
BULAN IV
BULAN V
2

10

11

12

13

14

15

16

17

18

19

20

MASA PEMELIHARAAN 180


HARI KALENDER
I
II
III
IV
V
VI

A. LANTAI I (SATU)
I PEKERJAAN PENDAHULUAN
1
2
3

Pek. Pembersihan Lokasi


Pek. Papan Nama Proyek
Pek. Pembuatan Direksi Keet

SKALA
KURVA
100%

II PEKERJAAN TANAH/ PASIR


1

Pek. Galian Tanah Pondasi

III PEKERJAAN STRUKTUR


1
2
3
4
5
6
7

Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.

Cor Balok Sloof ( 1S4 - 15/20 ) Beton + Tulangan + Bekisting ( K 250 )


Cor Kolom Teras ( K9 ) Beton K 250 + Tulangan + Bekisting
Cor Kolom Lantai 1 Beton K 250 + Tulangan + Bekisting
Cor Kozen Pintu Utama Beton K 225 + Tulangan + Bekisting
Cor Balok Latey Selasar (B4 - 20/30) Beton K 225 + Tulangan + Bekisting Elv. + 2
Cor Plat Canopy Selasar T = 10 cm, Beton K 225 + Tulangan + Bekisting
Kepala Tiang Selasar 50/80, T = 10 cm, Beton K 225 + Tulangan + Bekisting

1.69

5.07

0.92
5.07

5.07
0.35
0.87

0.87
1.00
0.41

B. LANTAI II ( DUA )
I PEKERJAAN STRUKTUR
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.

Cor
Cor
Cor
Cor
Cor
Cor
Cor
Cor
Cor
Cor
Cor
Cor
Cor
Cor
Cor

Balok Lantai (2B6 30/60) Beton K 225 + Tulangan + Bekisting


Balok Lantai ( 2B1 25/45 ) Beton K 225 + Tulangan + Bekisting
Balok Lantai ( 2B2 25/45 ) Beton K 225 + Tulangan + Bekisting
Balok Lantai ( 2B2 25/40 ) Beton K 225 + Tulangan + Bekisting
Balok Lantai ( 2B4 20/35 ) Beton K 225 + Tulangan + Bekisting
Balok Lantai ( 2B5 15/20 ) Beton K 225 + Tulangan + Bekisting
Balok Lantai ( 2B7 - 20/30 ) Beton K 225 + Tulangan + Bekisting
Balok Latey Teras (2B1 25/45) Beton K 225 + Tulangan + Bekisting Elv, +3,3
Ring Balok Teras (3B1 25/45) Beton K 225 + Tulangan + Bekisting Elv, + 6.8
List Plank Teras T = 10 cm, Beton K 225 + Tulangan + Bekisting
Plat Lantai K 225 + Tulangan + Bekisting
Plat Daag Selasar T = 10 cm, Beton K 225 + Tulangan + Bekisting
Kolom Lantai 2 Beton K 250 + Tulangan + Bekisting
Kolom Pedastal 1 Elv + 4.00 s/d Elv + 5.00 Beton K 225 + Tulangan + Bekisti
Ring Balok (RB3 20/30 ) Beton K 225 + Tulangan + Bekisting Elv. + 5.00

0.90
7.65
0.93
5.18
3.66
0.67
0.57
0.57
0.57
0.95
16.65
3.96
8.11
0.13
0.59

0.30
1.53

0.30
1.53

0.30
1.53

1.29

1.29
1.22
0.67

1.53
0.93
1.29
1.22

1.53
1.29
1.22

0.57
0.57
0.28
3.33

3.33

3.33

3.33

0.28
0.48

0.48

3.33
1.98
2.03

2.03

2.03
0.13

1.98

2.03

0.59

C. LANTAI III ( TIGA )


I PEKERJAAN STRUKTUR
1
2
3
4
5
6
7

D.

Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.

Cor
Cor
Cor
Cor
Cor
Cor
Cor

Balok Lantai (3B6 30/60) Beton K 225 + Tulangan + Bekisting


Balok Lantai ( 3B1 25/45 ) Beton K 225 + Tulangan + Bekisting
Balok Lantai ( 3B2 25/45 ) Beton K 225 + Tulangan + Bekisting
Balok Lantai ( 3B3 25/40 ) Beton K 225 + Tulangan + Bekisting
Balok Lantai ( 3B5 15/20 ) Beton K 225 + Tulangan + Bekisting
Balok Lantai ( 3B7 20/30 ) Beton K 225 + Tulangan + Bekisting
Plat Lantai K 225 + Tulangan + Bekisting

0.90
4.76
2.43
4.60
0.49
0.31
12.64

0.30
1.19

2.53

0.30
1.19
0.81
1.15

0.30
1.19
0.81
1.15
0.25

2.53

2.53

1.19
0.81
1.15
0.25
0.16
2.53

1.15
0.16
2.53

Pre Hand Over ( P H O )


Jumlah Rencana
Komulatif Rencana
Jumlah Realisasi
Komulatif Realisasi
Deviasi

0.00

100.00
0

3.14

5.07

5.99

5.43

5.16

6.46

8.35

8.87

7.37

3.49

3.90

2.57

2.59

4.02

5.98

6.22

6.08

6.10

2.74

0.48

3.14

8.21

14.21

19.63

24.79

31.25

39.59

48.47

55.84

59.33

63.23

65.79

68.39

72.41

78.39

84.61

90.69

96.78

99.52

100.00

Bengkalis, 18 Mei 2015


Penawar,
PT. TIGA PUTRA WIJAYA

SUDIRMAN, ST
Kepala Cabang

0%

LAMPIRAN BERITA ACARA RAPAT PEMBAHASAN ADDENDUM TAMBAH KU


KEGIATAN
:
PEKERJAAN
:
LOKASI
:
TAHUN ANGGARAN:

PENINGKATAN SARANA DAN PRASARANA APARATUR


LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS
KABUPATEN BENGKALIS
2015

NO.

URAIAN PEKERJAAN

KONTRAK AWAL
HARGA
SATUAN VOLUME
SATUAN
( Rp )
3

A.
I
1
2
3

LANTAI I (SATU)
PEKERJAAN PENDAHULUAN
Pek. Pembersihan Lokasi
Pek. Papan Nama Proyek
Pek. Pembuatan Direksi Keet

M2
Ls
M2

826.97
1.00
20.00

II
1
2
3
4
5
6
7
8
9

PEKERJAAN TANAH/ PASIR


Pek. Galian Tanah Pondasi
Pek. Urugan Tanah Pilihan Bawah Lantai
Pek. Urugan Pasir Bawah Lantai
Pek. Cor Lantai Beton Camp. 1 : 3 : 5
Pek. Pasangan Wire Mesh M6-150
Pek. Urugan Tanah Pilihan Bawah Rabat Beton
Pek. Urugan Pasir Bawah Rabat Beton
Pek. Cor Rabat Beton Camp. 1 : 3 : 5
Pek. Cor Saluran Keliling Bangunan

M3
M3
M3
M3
M2
M3
M3
M3
M3

8.07
-

III
1
2
3

PEKERJAAN STRUKTUR
Pek. Cor Balok Sloof ( 1S4 - 15/20 ) Beton + Tulangan + Bekisting ( K 250 )
Pek. Cor Lantai Kerja Beton Camp. 1:3:5
Pek. Cor Balok Sloof ( 1S2 - 25/40 ) Beton + Tulangan + Bekisting ( K 250 )

M3
M3
M3

0.59
-

KONTRAK ADDENDUM
JUMLAH
HARGA
( Rp )
6

1,830.00
350,000.00
###

49,200.00
-

###
-

SATUAN VOLUME
7

1,513,355.10
350,000.00
32,774,000.00

M2
Ls
M2

826.97
1.00
20.00

397,044.00
-

M3
M3
M3
M3
M2
M3
M3
M3
M3

8.07
675.92
59.25
118.49
###
80.84
13.47
21.56
16.71

3,529,902.03
-

M3
M3
M3

1.31
4.37
1.09

NO.

URAIAN PEKERJAAN

4
5
6
7
8
9
10

Pek.
Pek.
Pek.
Pek.
Pek.
Pek.
Pek.

Cor Balok Sloof ( 1S3 - 20/30 ) Beton + Tulangan + Bekisting ( K 250 )


Cor Kolom Teras ( K9 ) Beton K 250 + Tulangan + Bekisting
Cor Kolom Lantai 1 Beton K 250 + Tulangan + Bekisting
Cor Kozen Pintu Utama Beton K 225 + Tulangan + Bekisting
Cor Balok Latey Selasar (B4 - 20/30) Beton K 225 + Tulangan + Bekisting
Cor Plat Canopy Selasar T = 10 cm, Beton K 225 + Tulangan + Bekisting
Kepala Tiang Selasar 50/80, T = 10 cm, Beton K 225 + Tulangan + Bekisti

KONTRAK AWAL
HARGA
SATUAN VOLUME
SATUAN
( Rp )
3

M3
M3
M3
M3
M3
M3
M3

3.91
71.59
1.50
8.78
4.77
1.64

LANTAI II ( DUA )
PEKERJAAN STRUKTUR
Pek. Cor Balok Lantai (2B6 30/60) Beton K 225 + Tulangan + Bekisting
Pek. Cor Balok Lantai ( 2B1 25/45 ) Beton K 225 + Tulangan + Bekisting
Pek. Cor Balok Lantai ( 2B2 25/45 ) Beton K 225 + Tulangan + Bekisting
Pek. Cor Balok Lantai ( 2B2 25/40 ) Beton K 225 + Tulangan + Bekisting
Pek. Cor Balok Lantai ( 2B4 20/35 ) Beton K 225 + Tulangan + Bekisting
Pek. Cor Balok Lantai ( 2B5 15/20 ) Beton K 225 + Tulangan + Bekisting
Pek. Cor Balok Lantai ( 2B7 - 20/30 ) Beton K 225 + Tulangan + Bekisting
Pek. Cor Balok Latey Teras (2B1 25/45) Beton K 225 + Tulangan + Bekisting El
Pek. Cor Ring Balok Teras (3B1 25/45) Beton K 225 + Tulangan + Bekisting El
Pek. Cor List Plank Teras T = 10 cm, Beton K 225 + Tulangan + Bekisting
Pek. Cor Plat Lantai K 225 + Tulangan + Bekisting

JUMLAH
HARGA
( Rp )
6

###
###
###
###
###
###

SUB TOTAL PEKERJAAN A. LANTAI I (SATU)


B.
I
1
2
3
4
5
6
7
8
9
10
11

KONTRAK ADDENDUM

24,547,866.98
449,458,260.19
9,417,340.28
46,129,220.93
26,672,009.94
11,002,900.06

SATUAN VOLUME
7

M3
M3
M3
M3
M3
M3
M3

4.29
3.91
71.59
1.50
8.78
4.77
1.64

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

3.89
32.74
4.05
20.52
16.38
2.86
2.86
2.43
2.43
4.54
79.19

605,791,899.51

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

3.89
32.74
4.05
20.52
16.38
2.86
2.86
2.43
2.43
4.54
79.19

###
###
###
###
###
###
###
###
###
###
###

23,968,868.88
203,407,324.10
24,807,517.65
137,670,432.41
97,276,344.98
17,881,106.10
15,026,147.14
15,097,122.71
15,097,122.71
25,385,938.18
442,800,097.95

NO.

URAIAN PEKERJAAN

12
13
14
15

Pek.
Pek.
Pek.
Pek.

Cor
Cor
Cor
Cor

KONTRAK AWAL
HARGA
SATUAN VOLUME
SATUAN
( Rp )

Plat Daag Selasar T = 10 cm, Beton K 225 + Tulangan + Bekisting


Kolom Lantai 2 Beton K 250 + Tulangan + Bekisting
Kolom Pedastal 1 Elv + 4.00 s/d Elv + 5.00 Beton K 225 + Tulangan +
Ring Balok (RB3 20/30 ) Beton K 225 + Tulangan + Bekisting Elv. + 5.

M3
M3
M3
M3

18.81
34.34
0.54
3.00

LANTAI III ( TIGA )


PEKERJAAN STRUKTUR
Pek. Cor Balok Lantai (3B6 30/60) Beton K 225 + Tulangan + Bekisting
Pek. Cor Balok Lantai ( 3B1 25/45 ) Beton K 225 + Tulangan + Bekisting
Pek. Cor Balok Lantai ( 3B2 25/45 ) Beton K 225 + Tulangan + Bekisting
Pek. Cor Balok Lantai ( 3B3 25/40 ) Beton K 225 + Tulangan + Bekisting
Pek. Cor Balok Lantai ( 3B5 15/20 ) Beton K 225 + Tulangan + Bekisting
Pek. Cor Balok Lantai ( 3B7 20/30 ) Beton K 225 + Tulangan + Bekisting
Pek. Cor Plat Lantai K 225 + Tulangan + Bekisting
SUB TOTAL PEKERJAAN C. LANTAI III ( TIGA )
JUMLAH TOTAL ( A + B + C )
PAJAK PERTAMBAHAN NILAI ( PPn ) 10%

JUMLAH
HARGA
( Rp )

SATUAN VOLUME

###
###
###
###

SUB TOTAL PEKERJAAN B. LANTAI II ( DUA )


C.
I
1
2
3
4
5
6
7

KONTRAK ADDENDUM

105,178,303.35
215,594,310.03
3,405,596.40
15,761,692.80

M3
M3
M3
M3

18.81
34.34
0.54
3.00

M3
M3
M3
M3
M3
M3
M3

###

M3
M3
M3
M3
M3
M3
M3

3.89
20.39
10.53
18.24
2.09
1.58
60.09

###
###
###
###
###
###
###

23,968,868.88
126,679,149.00
64,499,545.89
122,373,717.70
13,066,962.15
8,301,158.21
336,000,225.86
694,889,627.68
###
265,903,945.26

JUMLAH HARGA PEKERJAAN

###

JUMLAH DIBULATKAN

###

NO.

URAIAN PEKERJAAN

KONTRAK AWAL
HARGA
SATUAN VOLUME
SATUAN
( Rp )
3

KONTRAK ADDENDUM
JUMLAH
HARGA
( Rp )
6

SATUAN VOLUME
7

BAHASAN ADDENDUM TAMBAH KURANG PEKERJAAN


NO. KONTRAK
TANGGAL KONTRAK
NO. SURAT
TANGGAL SURAT

) SYARIAH KAB. BENGKALIS

KONTRAK ADDENDUM
HARGA
JUMLAH
SATUAN
HARGA
( Rp )
( Rp )
9

10

: 05-NK/SP/KPA/PU-CK/VII/2015
: 08 JULI 2015
:
:

PEKERJAAN PEKERJAAN
TAMBAH
KURANG

HARGA

HARGA

TAMBAH

KURANG

(+)

(-)

( Rp )

( Rp )

11

12

13

13

KETERANGAN

14

1,830.00
350,000.00
1,638,700.00

1,513,355.10
350,000.00
32,774,000.00

Tetap
Tetap
Tetap

49,200.00
458,900.00
531,900.00
1,335,800.00
47,751.70
458,900.00
531,900.00
1,335,800.00
1,335,800.00

397,044.00
310,181,459.81
31,512,960.70
158,281,680.39
56,581,963.85
37,098,279.08
7,166,621.14
28,796,909.24
22,319,009.92

675.92
59.25
118.49
1,184.92
80.84
13.47
21.56
16.71

310,181,459.81
31,512,960.70
158,281,680.39
56,581,963.85
37,098,279.08
7,166,621.14
28,796,909.24
22,319,009.92

Tetap
- Pekerjaan Bertambah
- Pekerjaan Bertambah
- Pekerjaan Bertambah
- Pekerjaan Bertambah
Pekerjaan Bertambah
Pekerjaan Bertambah
Pekerjaan Bertambah
Pekerjaan Bertambah

5,982,884.80
1,335,800.00
6,087,257.65

7,807,664.66
5,831,501.69
6,635,110.84

0.72
4.37
1.09

4,277,762.63
5,831,501.69
6,635,110.84

- Volume Bertambah
- Pekerjaan Bertambah
Pekerjaan Bertambah

KONTRAK ADDENDUM
HARGA
JUMLAH
SATUAN
HARGA
( Rp )
( Rp )
9

6,109,892.35
6,278,226.85
6,278,226.85
6,278,226.85
5,253,897.60
5,591,616.34
6,709,085.40

PEKERJAAN PEKERJAAN
TAMBAH
KURANG

10

26,182,110.70
24,547,866.98
449,458,260.19
9,417,340.28
46,129,220.93
26,672,009.94
11,002,900.06

23,968,868.88
203,407,324.10
24,807,517.65
137,670,432.41
97,276,344.98
17,881,106.10
15,026,147.14
15,097,122.71
15,097,122.71
25,385,938.18
442,800,097.95

HARGA

TAMBAH

KURANG

(+)

(-)

( Rp )

( Rp )

11

12

13

13

4.29
-

###

6,161,662.95
6,212,807.70
6,125,313.00
6,709,085.40
5,938,726.80
6,252,135.00
5,253,897.60
6,212,807.70
6,212,807.70
5,591,616.34
5,591,616.34

HARGA

26,182,110.70
###

KETERANGAN

14

Pekerjaan Bertambah
Tetap
Tetap
Tetap
Tetap
Tetap
Tetap
-

Tetap
Tetap
Tetap
Tetap
Tetap
Tetap
Tetap
Tetap
Tetap
Tetap
Tetap
Tetap

KONTRAK ADDENDUM
HARGA
JUMLAH
SATUAN
HARGA
( Rp )
( Rp )
9

5,591,616.34
6,278,226.85
6,306,660.00
5,253,897.60

PEKERJAAN PEKERJAAN
TAMBAH
KURANG

10

105,178,303.35
215,594,310.03
3,405,596.40
15,761,692.80

###
265,901,519.49
###
###

HARGA

TAMBAH

KURANG

(+)

(-)

( Rp )

( Rp )

11

12

13

13

###

6,161,662.95
6,212,807.70
6,125,313.00
6,709,085.40
6,252,135.00
5,253,897.60
5,591,616.34

HARGA

3.89
20.39
10.53
18.24
2.09
1.58
60.09

KETERANGAN

14

###
SELISIH

Tetap
Tetap
Tetap
Tetap

23,968,868.88 Pekerjaan
126,679,149.00 Pekerjaan
64,499,545.89 Pekerjaan
122,373,717.70 Pekerjaan
13,066,962.15 Pekerjaan
8,301,158.21 Pekerjaan
336,000,225.86 Pekerjaan
###
###
24,257.70

Berkurang
Berkurang
Berkurang
Berkurang
Berkurang
Berkurang
Berkurang

KONTRAK ADDENDUM
HARGA
JUMLAH
SATUAN
HARGA
( Rp )
( Rp )
9

10

PEKERJAAN PEKERJAAN
TAMBAH
KURANG

HARGA

HARGA

TAMBAH

KURANG

(+)

(-)

( Rp )

( Rp )

11

12

13

13

KETERANGAN

14

DAFTAR LAMPIRAN ANALISA HARGA SATUAN PEKERJAA


( ADDENDUM TAMBAH KURANG PEKERJAAN )
KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN
No.

: PENINGKATAN SARANA DAN PRASARANA APARATUR


: LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGG
EKONOMI (STIE) SYARIAH KAB. BENGKALIS
: KABUPATEN BENGKALIS
: 2015

Jenis Pekerjaan

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan

1 M3 URUGAN TANAH PILIHAN


BAHAN
Tanah Urugan Pilihan

1.2000 M3

350,000.00

TENAGA
Pekerja
Mandor

0.3000 Oh
0.0100 Oh

108,000.00
150,000.00

ALAT
Alat Bantu

1.0000 Ls

5,000.00
Jumlah

1 M2 PASANGAN GEOTEKSTIL
BAHAN
Geotekstil

1.0500 M2

29,000.00

TENAGA
Pekerja
Mandor

0.1556 Oh
0.0778 Oh

108,000.00
150,000.00
Jumlah

1 M3 BETON COR 1:3:5


BAHAN
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.8700 M3
0.5200 M3
218.0000 Kg

1.6500
0.2500
0.0250
0.0800

Oh
Oh
Oh
Oh

575,000.00
465,000.00
1,700.00

108,000.00
118,000.00
138,000.00
150,000.00
Jumlah

1 M3 MEMBUAT SLOOF 20 x 30 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton

0.1875
2.0000
0.6000
199.6569
2.9949

M3
Kg
Ltr
Kg
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00

No.

Jenis Pekerjaan
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan
0.5000 M3
0.4900 M3
352.5000 Kg

4.8500
0.3500
1.5600
1.4000
0.3310
0.1700

Oh
Oh
Oh
Oh
Oh
Oh

575,000.00
465,000.00
1,700.00

108,000.00
118,000.00
118,000.00
118,000.00
138,000.00
150,000.00
Jumlah

No.

Jenis Pekerjaan

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan

1 M3 MEMBUAT SLOOF 25 x 40 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.1875
2.0000
0.6000
198.3391
2.9751
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

4.8500
0.3500
1.5600
1.4000
0.3310
0.1700

Oh
Oh
Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00
138,000.00
150,000.00
Jumlah

1 M3 MEMBUAT SLOOF 25 x 40 CM BETON BERTULANG + BEKISTING


BAHAN
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton
Kawat Beton
Kerikil
Pasir Beton
Semen Porltand
TENAGA
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.1875
2.0000
0.6000
198.3391
2.9751
0.5000
0.4900
352.5000

M3
Kg
Ltr
Kg
Kg
M3
M3
Kg

2,750,000.00
25,000.00
25,000.00
16,500.00
45,000.00
575,000.00
465,000.00
1,700.00

4.8500
0.3500
1.5600
1.4000
0.3310
0.1700

Oh
Oh
Oh
Oh
Oh
Oh

108,000.00
118,000.00
118,000.00
118,000.00
138,000.00
150,000.00
Jumlah

No.

Jenis Pekerjaan

Harga Bahan dan


Upah
(Rp)

Indeks dan
Satuan

1 M2 WIRE MESH M6-150


BAHAN
Wire Mesh M6-150
Kawat Ikat Beton
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor

1.0500 M2
0.1000 Kg

20,282.19
45,000.00

Oh
Oh
Oh
Oh

108,000.00
118,000.00
138,000.00
150,000.00

0.1400
0.0467
0.0046
0.0046

Jumlah
8

1 M3 TIMBUNAN PASIR URUG


BAHAN
Pasir Urug

1.2000 M3

415,000.00

TENAGA
Pekerja
Mandor

0.3000 Oh
0.0100 Oh

108,000.00
150,000.00
Jumlah

N ANALISA HARGA SATUAN PEKERJAAN

DUM TAMBAH KURANG PEKERJAAN )

INGKATAN SARANA DAN PRASARANA APARATUR


JUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU
NOMI (STIE) SYARIAH KAB. BENGKALIS

Jumlah Harga
(Rp)

420,000.00

32,400.00
1,500.00

5,000.00
458,900.00

30,450.00

16,800.00
11,666.67
58,916.67

500,250.00
241,800.00
370,600.00

178,200.00
29,500.00
3,450.00
12,000.00
1,335,800.00

BETON BERTULANG + BEKISTING

515,625.00
50,000.00
15,000.00
3,294,338.85
134,770.50

Jumlah Harga
(Rp)
287,500.00
227,850.00
599,250.00

523,800.00
41,300.00
184,080.00
165,200.00
45,678.00
25,500.00
6,109,892.35

Jumlah Harga
(Rp)

BETON BERTULANG + BEKISTING

515,625.00
50,000.00
15,000.00
3,272,595.15
133,879.50
287,500.00
227,850.00
599,250.00

523,800.00
41,300.00
184,080.00
165,200.00
45,678.00
25,500.00
6,087,257.65

BETON BERTULANG + BEKISTING

515,625.00
50,000.00
15,000.00
3,272,595.15
133,879.50
287,500.00
227,850.00
599,250.00

523,800.00
41,300.00
184,080.00
165,200.00
45,678.00
25,500.00
6,087,257.65

Jumlah Harga
(Rp)

21,296.30
4,500.00

15,120.00
5,510.60
634.80
690.00
47,751.70

498,000.00

32,400.00
1,500.00
531,900.00

DAFTAR HARGA SATUAN UPAH DAN BAHAN


( ADDENDUM TAMBAH KURANG PEKERJAAN )
KEGIATAN
PEKERJAAN

: PENINGKATAN SARANA DAN PRASARANA APARATUR


: LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU
EKONOMI (STIE) SYARIAH KAB. BENGKALIS
LOKASI
: KABUPATEN BENGKALIS
TAHUN ANGGARAN : 2015
JENIS

NO

UPAH DAN BAHAN

SATUAN

A. BAHAN PASANGAN

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Agregrat Kelas A
Agregrat Kelas B
Agregrat Kelas C
Aspal
Batu Bata
Batu Kali
Filler
Kerikil / Koral
Material Pilihan ( Sirtu )
Pasir Pasang
Pasir Beton
Pasir Plester
Pasir Urug
Semen Portland @ 50 Kg
Semen Portland
Semen Putih
Semen Putih
Teer
Tanah Timbunan
Tanah Urug Pilihan

M3
M3
M3
Kg
Bh
M3
Kg
M3
M3
M3
M3
M3
M3
Zak
Kg
Zak
Kg
Kg
M3
M3

B. BANAH BESI, MINYA


DAN LAIN - LAIN

1
2
3
4
5
6
7
8
9

Minyak Bensin
Minyak Pelumas Olie
Minyak Solar
Minyak Tanah
Minyak Bekisting
Plastik Alas
Geotekstil
Wire Mesh M6-150
Kawat Ikat Beton

D. TENAGA KERJA

1
2
3
4
5
6
7
8
9

Kepala Tukang
Tukang Batu
Tukang Kayu
Tukang Cat
Tukang Besi
Mandor
Pekerja
Operator/Supir
Pembantu Operator/Pembantu Supir

Ltr
Ltr
Ltr
Ltr
Ltr
M2
M2
M2
Kg
Orang / Hari
Orang / Hari
Orang / Hari
Orang / Hari
Orang / Hari
Orang / Hari
Orang / Hari
Jam
Jam

RGA SATUAN UPAH DAN BAHAN

UM TAMBAH KURANG PEKERJAAN )

ATAN SARANA DAN PRASARANA APARATUR


PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU
(STIE) SYARIAH KAB. BENGKALIS

HARGA SATUAN
( Rp )
5
850,000.00
720,000.00
680,000.00
17,000.00
1,200.00
450,000.00
2,000.00
575,000.00
525,000.00
425,000.00
465,000.00
415,000.00
415,000.00
85,000.00
1,700.00
65,000.00
1,300.00
17,000.00
165,000.00
350,000.00

12,000.00
35,000.00
15,000.00
13,000.00
25,000.00
7,000.00
29,000.00
20,282.19
45,000.00
138,000.00
118,000.00
118,000.00
118,000.00
118,000.00
150,000.00
108,000.00
14,750.00
13,500.00

LAMPIRAN URAIAN ANALISA HARGA SATUAN


JENIS PEKERJAAN
SATUAN PEMBAYARAN

No.

: PAS. GEOTEKSTIL
: M2

URAIAN

KODE

I.
1
2
3
4

ASUMSI
Pekerjaan dilakukan secara manual
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan terpengaruh oleh aliran air tanah
Jam kerja efektif per-hari

II.
1
2

URUTAN KERJA
Material geoteksil diterima dilokasi pekerjaan
Pemasangan dilaksanakan sesuai dengan prosedur
yang direkomendasikan oleh pabriknya
Pekerjaan galian dibayar tersendiri

3
III.
1.

2.
2.b.

3.

PEMAKAIAN BAHAN, ALAT DAN TENAGA


BAHAN
Kebutuhan Geotekstil/ M2

Tk

(M23)

ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil : alat potong dan jahit
TENAGA
Produksi yang dapat diselesaikan / hari
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M2
- Pekerja
- Mandor

= (Tk x P) : Qt
= (Tk x M) : Qt

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN


Didapat Harga Satuan Pekerjaan :
Rp.

58,916.67 / M2

7.00

1.0500

1.00

Qt

90.00

P
M

2.00
1.00

(L01)
(L03)

4.

KOEF.

0.1556
0.0778

LAMPIRAN URAIAN ANALISA HARGA SATUAN


JENIS PEKERJAAN
SATUAN PEMBAYARAN
No.

: URUGAN TANAH PILIHAN


: M3
URAIAN

I.
1
2
3
4
5

ASUMSI
Pekerjaan dilakukan secara mekanis
Jam kerja efektif per-hari
Faktor pengembangan bahan
Tebal hamparan padat
Berat volume bahan (lepas)

II.
1
2

URUTAN KERJA
Excavator menggali dan memuat ke dalam pick up
Pick up mengangkut ke lapangan dengan jarak
quari ke lapangan
Material diratakan dengan tenaga manusia
Material dipadatkan menggunakan stamper

3
4
III.
1.
1.a.

PEMAKAIAN BAHAN, ALAT DAN TENAGA


BAHAN
Bahan timbunan
= 1 x Fk

2.
2.a.

ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi Alat
Faktor Konversi
Waktu sklus
- Muat
Waktu Siklus = T1 x Fv
Kapasitas Produksi / Jam =V x Fb x Fa x 60
Fk x Ts1
Koefisien alat / M = 1 : Q1

2.b.

2.c.

3.

TAMPER (pemadatan timbunan)


Kecepatan
Efisiensi alat
Lebar pemadatan
Banyak lintasan
Jumlah lapisan timbunan
Tebal lapis rata-rata
Kap. Prod. / Jam v=x 1000 x Fa x Lb x tp
n x N x (M-09)
Koefisien Alat / m= 1 : Q1

KODE

Tk
Fk
t
D

7.00
1.20
0.15
1.60

15.00

1.20

V
Fb
Fa
Fv
Ts1
T1
Ts1

0.80
1.00
0.83
0.90

Q1

9.00

4.10
3.69

0.1111
v
Fa
Lb
n
N
tp
Q1

1.00
0.83
0.50
22
4
0.30
1.18
0.8482

ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop =
3 buah
TENAGA
Produksi menentukan : EXCAVATOR
Produksi Timbunan / hari = Tk x Q1
Kebutuhan tenaga :

KOEF.

1.00

Q1
Qt

9.00
62.98

- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja
- Mandor

P
M
= (Tk x P) : Qt
= (Tk x M) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN


Didapat Harga Satuan Pekerjaan :
Rp. Err:509

/ M3

2.00
1.00
0.2223
0.0556

AN URAIAN ANALISA HARGA SATUAN

SATUAN KETERANGAN

Jam

M2

Ls

M2
orang
orang

Jam
Jam

Lump Sump

AN URAIAN ANALISA HARGA SATUAN

SATUAN KETERANGAN

Jam
M
Ton/M3

Km

M3

M3
-

menit
menit
M3
Jam
Km / Jam
M
lintasan
lintasan
M
M3 / Jam
jam
Ls

M3/Jam
M3

Lump Sump

orang
orang
Jam
Jam

LAMPIRAN URAIAN ANALISA ALAT


No.

URAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal = ( B - C ) x D
W

b. Asuransi, dll =

i x (1 + i)^A
(1 + i)^A - 1

0.002 x B
W

Biaya Pasti per Jam

(E+F)

EXCAVATOR 80-140
Pw
Cp
A
W
B

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

2.

Pelumas

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan

(12,5 % - 17,5 %) x B
=
W

4.
5.

Operator
Pembantu Operator

= ( 1 Orang / Jam ) x U1
= ( 1 Orang / Jam ) x U2

Biaya Operasi per Jam

= (H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM

E.
1.
2.
3.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir

(G+P)

L
M
P
S

i
U1
U2

4.
5.
6.

Bahan Bakar Bensin


Bahan Bakar Solar
Minyak Pelumas

Mb
Ms
Mp

LAMPIRAN URAIAN ANALISA ALAT


No.

URAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal = ( B - C ) x D
W

b. Asuransi, dll =

i x (1 + i)^A
(1 + i)^A - 1

0.002 x B
W

Biaya Pasti per Jam

(E+F)

TAMPER
Pw
Cp
A
W
B

C.

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

2.

Pelumas

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

4.
5.

Perawatan dan
perbaikan

Operator
Pembantu Operator

(6.25% dan 8.75%) x B


W

(12,5 % - 17,5 %) x B
W

= ( 1 Orang / Jam ) x U1
= ( 1 Orang / Jam ) x U2

L
M

Biaya Operasi per Jam

= (H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM

E.
1.
2.
3.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir

(G+P)

P
S

i
U1
U2

4.
5.
6.

Bahan Bakar Bensin


Bahan Bakar Solar
Minyak Pelumas

Mb
Ms
Mp

LAMPIRAN URAIAN ANALISA ALAT


KOEF.

SATUAN

EXCAVATOR 80-140 HP
110.0
HP
0.80
M3
5.0 Tahun
2,000.0
Jam
850,000,000 Rupiah

85,000,000
0.29832

Rupiah
-

114,105.70

Rupiah

850.00

Rupiah

114,955.70

Rupiah

198,000.00

Rupiah

96,250.00

Rupiah

37,188

Rupiah

53,125.00

Rupiah

14,750.00
13,500.00

Rupiah
Rupiah

412,812.50

Rupiah

527,768.20

Rupiah

15.00 % / Tahun
14,750.00 Rp./Jam
13,500.00 Rp./Jam

KET.

12,000.00
15,000.00
35,000.00

Liter
Liter
Liter

LAMPIRAN URAIAN ANALISA ALAT


KOEF.

SATUAN

TAMPER
5.0
17.300
4.0
1,000.0
17,000,000

HP
kN
Tahun
Jam
Rupiah

1,700,000

Rupiah

0.35027

5,359.06

Rupiah

0.00

Rupiah

5,359.06

Rupiah

9,000.00

Rupiah

4,375.00

Rupiah

1,063

Rupiah

2,125.00

Rupiah

14,750.00
13,500.00

Rupiah
Rupiah

44,812.50

Rupiah

50,171.56

Rupiah

15.00 % / Tahun
14,750.00 Rp./Jam
13,500.00 Rp./Jam

KET.

12,000.00
15,000.00
35,000.00

Liter
Liter
Liter

BACK UP DATA PENGUKURAN TIMBUNAN


KEGIATAN

: PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN

: LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU


: EKONOMI (STIE) SYARIAH KAB. BENGKALIS
: KABUPATEN BENGKALIS

LOKASI

TAHUN ANGGARAN: 2015


No

Panjang

Lebar

Tinggi

1.000

###

1.000

5.700

2.100

Luas

Volume

M2

M3

1.000

0.700

0.950

5.700

5.415

3.300

0.950

6.930

6.584

1.000

5.700

0.950

5.700

5.415

1.000

2.100

0.950

2.100

1.995

3.300

1.000

0.900

3.300

2.970

3.300

5.700

0.980

18.810

18.434

3.300

0.850

10.890

9.257

3.300

5.700

1.200

18.810

22.572

10

3.300

2.150

1.050

7.095

7.450

11

3.350

0.960

0.900

3.216

2.894

12

3.350

5.700

1.050

19.095

20.050

13

3.350

3.300

0.950

11.055

10.502

14

3.350

5.700

1.100

19.095

21.005

15

3.350

2.150

1.000

7.203

7.203

16

3.420

0.950

0.900

3.249

2.924

17

3.420

5.700

1.050

19.494

20.469

18

3.420

3.300

0.980

11.286

11.060

19

3.420

5.700

0.850

19.494

16.570

20

3.420

2.150

0.850

7.353

6.250

21

3.350

0.950

0.900

3.183

2.864

22

3.350

5.700

0.920

19.095

17.567

23

3.350

3.300

0.950

11.055

10.502

24

3.350

5.700

0.920

19.095

17.567

25

3.350

2.150

0.980

7.203

7.058

26

3.320

1.000

0.900

3.320

2.988

27

3.320

5.700

0.850

18.924

16.085

28

3.320

3.300

0.820

10.956

8.984

293.705

283.334

###

0.700

Kuantita
s

(N)

SUB TOTAL

Diperiksa Oleh :
KONSULTAN PENGAWAS
CV. MULTY DESEKO

Lembar 125

Dibuat Oleh :

KONTRAKTOR PELAKSANA
PT. TIGA PUTRA WIJAYA

ADE DESRY KURNIAWAN, A.Md


Inspector

Lembar 126

MUSMULYADI
Pelaksana Lapangan

BACK UP DATA PENGUKURAN TIMBUNAN


KEGIATAN

: PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN

: LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU


: EKONOMI (STIE) SYARIAH KAB. BENGKALIS
: KECAMATAN BENGKALIS

LOKASI

TAHUN ANGGARAN: 2015


No

Panjang

Lebar

Tinggi

Kuantita
s

Luas

Volume

M2

M3

18.924

15.139

29

3.320

5.700

0.800

30

3.320

2.150

0.780

7.138

5.568

31

2.130

0.900

0.550

1.917

1.054

32

2.130

5.700

0.580

12.141

7.042

33

2.130

3.300

0.800

7.029

5.623

34

2.130

5.700

0.850

12.141

10.320

35

2.130

3.360

0.670

7.157

4.795

36

3.350

0.900

0.450

3.015

1.357

37

3.350

5.700

0.450

19.095

8.593

38

3.350

3.300

0.450

11.055

4.975

39

3.350

5.700

0.650

19.095

12.412

40

3.350

0.900

0.520

3.015

1.568

41

3.350

2.250

0.600

7.538

4.523

42

3.400

3.300

0.550

11.220

6.171

43

3.400

2.100

0.480

7.140

3.427

44

3.400

3.300

0.480

11.220

5.386

45

3.400

0.900

0.500

3.060

1.530

46

3.400

2.250

0.500

7.650

3.825

47

3.400

3.300

0.520

11.220

5.834

48

3.400

2.250

0.550

7.650

4.208

49

3.400

3.300

0.550

11.220

6.171

50

3.400

0.900

0.500

3.060

1.530

51

3.400

2.250

0.500

7.650

3.825

52

3.400

0.930

0.600

3.162

1.897

53

3.400

5.700

0.550

19.380

10.659

54

3.400

3.300

0.650

11.220

7.293

55

3.400

5.700

0.500

19.380

9.690

263.491

154.413

(N)

56

SUB TOTAL

Diperiksa Oleh :
KONSULTAN PENGAWAS
CV. MULTY DESEKO

Lembar 127

Dibuat Oleh :

KONTRAKTOR PELAKSANA
PT. TIGA PUTRA WIJAYA

ADE DESRY KURNIAWAN, A.Md


Inspector

Lembar 128

MUSMULYADI
Pelaksana Lapangan

BACK UP DATA PENGUKURAN TIMBUNAN


KEGIATAN

: PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN

: LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU


: EKONOMI (STIE) SYARIAH KAB. BENGKALIS
: KECAMATAN BENGKALIS

LOKASI

TAHUN ANGGARAN: 2015


No

Panjang

Lebar

Tinggi

57

3.400

0.900

0.560

58

3.400

2.250

59

2.150

60

Kuantita
s

Luas

Volume

M2

M3

3.060

1.714

0.550

7.650

4.208

0.900

0.580

1.935

1.122

2.150

5.700

0.450

12.255

5.515

61

2.150

3.300

0.450

7.095

3.193

62

2.150

5.700

0.540

12.255

6.618

63

2.150

0.900

0.450

1.935

0.871

64

2.150

2.250

0.450

4.838

2.177

65

3.350

0.950

0.600

3.183

1.910

66

3.350

5.700

0.500

19.095

9.548

67

3.350

3.300

0.500

11.055

5.528

68

3.350

5.700

0.600

19.095

11.457

69

3.350

2.150

0.450

7.203

3.241

70

3.350

0.900

0.750

3.015

2.261

71

3.350

5.700

0.550

19.095

10.502

72

3.350

3.300

0.570

11.055

6.301

73

3.350

5.700

0.600

19.095

11.457

74

3.350

2.150

0.530

7.203

3.817

75

3.400

0.900

0.580

3.060

1.775

76

3.400

5.700

0.550

19.380

10.659

77

3.400

3.300

0.480

11.220

5.386

78

3.400

5.700

0.550

19.380

10.659

79

3.400

2.150

0.450

7.310

3.290

80

3.400

0.950

0.500

3.230

1.615

81

3.400

5.700

0.600

19.380

11.628

82

3.400

3.300

0.600

11.220

6.732

83

3.400

5.700

0.550

19.380

10.659

84

3.400

2.150

0.400

7.310

2.924

290.985

156.764

(N)

SUB TOTAL

Diperiksa Oleh :
KONSULTAN PENGAWAS
CV. MULTY DESEKO

Lembar 129

Dibuat Oleh :

KONTRAKTOR PELAKSANA
PT. TIGA PUTRA WIJAYA

ADE DESRY KURNIAWAN, A.Md


Inspector

Lembar 130

MUSMULYADI
Pelaksana Lapangan

BACK UP DATA PENGUKURAN TIMBUNAN


KEGIATAN

: PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN

: LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU


: EKONOMI (STIE) SYARIAH KAB. BENGKALIS
: KECAMATAN BENGKALIS

LOKASI

TAHUN ANGGARAN: 2015


No

Panjang

Lebar

Tinggi

85

3.350

0.950

0.450

86

3.350

5.700

87

3.350

88

Kuantita
s

Luas

Volume

M2

M3

3.183

1.432

0.500

19.095

9.548

3.300

0.500

11.055

5.528

3.350

5.700

0.450

19.095

8.593

89

3.350

2.150

0.400

7.203

2.881

90

1.000

0.970

0.550

0.970

0.534

91

1.000

5.700

0.450

5.700

2.565

92

2.160

3.300

0.400

7.128

2.851

93

0.980

5.700

0.460

5.586

2.570

94

0.970

2.150

0.450

2.086

0.938

95

6.980

6.950

0.480

48.511

23.285

96

6.980

5.700

0.520

39.786

20.689

169.397

81.413

(N)

SUB TOTAL

JUMLAH TOTAL TIMBUNAN

Diperiksa Oleh :
KONSULTAN PENGAWAS
CV. MULTY DESEKO

Lembar 131

###

675.92

Dibuat Oleh :

KONTRAKTOR PELAKSANA
PT. TIGA PUTRA WIJAYA

ADE DESRY KURNIAWAN, A.Md


Inspector

Lembar 132

MUSMULYADI
Pelaksana Lapangan

P DATA PENGUKURAN TIMBUNAN

GKATAN SARANA DAN PRASARANA APARATUR

TAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU


OMI (STIE) SYARIAH KAB. BENGKALIS

Keterangan

KONTRAKTOR PELAKSANA
PT. TIGA PUTRA WIJAYA

Lembar 133

MUSMULYADI
Pelaksana Lapangan

Lembar 134

P DATA PENGUKURAN TIMBUNAN

GKATAN SARANA DAN PRASARANA APARATUR

TAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU


OMI (STIE) SYARIAH KAB. BENGKALIS

Keterangan

Salah Cat

KONTRAKTOR PELAKSANA
PT. TIGA PUTRA WIJAYA

Lembar 135

MUSMULYADI
Pelaksana Lapangan

Lembar 136

P DATA PENGUKURAN TIMBUNAN

GKATAN SARANA DAN PRASARANA APARATUR

TAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU


OMI (STIE) SYARIAH KAB. BENGKALIS

Keterangan

KONTRAKTOR PELAKSANA
PT. TIGA PUTRA WIJAYA

Lembar 137

MUSMULYADI
Pelaksana Lapangan

Lembar 138

P DATA PENGUKURAN TIMBUNAN

GKATAN SARANA DAN PRASARANA APARATUR

TAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU


OMI (STIE) SYARIAH KAB. BENGKALIS

Keterangan

M3

KONTRAKTOR PELAKSANA
PT. TIGA PUTRA WIJAYA

Lembar 139

MUSMULYADI
Pelaksana Lapangan

Lembar 140

BACK UP DATA PENGUKURAN LANTAI KERJA


KEGIATAN

: PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN

: LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU


EKONOMI (STIE) SYARIAH KAB. BENGKALIS

LOKASI

: KABUPATEN BENGKALIS

TAHUN ANGGARAN: 2015


Tipe

Panjang

Lebar

Tinggi

2.300

0.500

0.250

2.600

0.550

0.230

2.300

0.550

0.260

4.400

0.550

0.210

10

3.200

0.550

0.240

14

2.400

0.550

0.220

15

3.100

0.550

0.230

15

2.800

0.500

0.190

15

2.000

0.550

0.210

18

3.000

0.550

0.230

18

1.400

0.550

0.220

19

4.400

0.550

0.210

23

2.000

0.550

0.230

Kuantitas
(N)

TOTAL

Diperiksa Oleh :
KONSULTAN PENGAWAS

Dibuat Oleh :
KONTRAKTOR PELAKSANA

CV. MULTY DESEKO

PT. TIGA PUTRA WIJAYA

ADE DESRY KURNIAWAN, A.Md


Inspector

MUSMULYADI
Pelaksana Lapangan

BACK UP DATA PENGUKURAN LANTAI KERJA


KEGIATAN

: PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN

: LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU


EKONOMI (STIE) SYARIAH KAB. BENGKALIS

LOKASI

: KABUPATEN BENGKALIS

TAHUN ANGGARAN: 2015

LAMPIRAN

Diperiksa Oleh :
KONSULTAN PENGAWAS

Dibuat Oleh :
KONTRAKTOR PELAKSANA

CV. MULTY DESEKO

PT. TIGA PUTRA WIJAYA

ADE DESRY KURNIAWAN, A.Md


Inspector

MUSMULYADI
Pelaksana Lapangan

P DATA PENGUKURAN LANTAI KERJA

NINGKATAN SARANA DAN PRASARANA APARATUR

NJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU


ONOMI (STIE) SYARIAH KAB. BENGKALIS

Volume
m3
0.288
0.329
0.329
0.508
0.422
0.290
0.392
0.266
0.231
0.380
0.169
0.508
0.253

4.366

Dibuat Oleh :
KONTRAKTOR PELAKSANA

PT. TIGA PUTRA WIJAYA

MUSMULYADI
Pelaksana Lapangan

P DATA PENGUKURAN LANTAI KERJA

NINGKATAN SARANA DAN PRASARANA APARATUR

NJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU


ONOMI (STIE) SYARIAH KAB. BENGKALIS

LAMPIRAN

Dibuat Oleh :
KONTRAKTOR PELAKSANA

PT. TIGA PUTRA WIJAYA

MUSMULYADI
Pelaksana Lapangan

BACK UP DATA HITUNGAN PEKERJAAN SLOOF


KEGIATAN

: PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN

: LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI


ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

LOKASI

: KABUPATEN BENGKALIS

TAHUN ANGGARAN : 2015


Tipe Balok
Posisi
Sloof
Digambar

Kuantitas

Panjang

Lebar

Tinggi

Volume

M3

1S2 ( 25 x 40 )

Detail C

3.350

0.250

0.400

1S2 ( 25 x 40 )

Detail C

2.100

0.250

0.400

(N)

2.000

0.670

2.000

0.420

Jumlah Total Volume

1.090

1S3 ( 20 x 30 )

Detail A

3.350

0.200

0.300

3.000

0.603

1S3 ( 20 x 30 )

Detail A

3.975

0.200

0.300

2.000

0.477

1S3 ( 20 x 30 )

Detail B

2.150

0.200

0.300

1.000

0.129

1S3 ( 20 x 30 )

Detail C

1.270

0.200

0.300

4.000

0.305

1S3 ( 20 x 30 )

Detail C

3.320

0.200

0.300

2.000

0.398

1S3 ( 20 x 30 )

Detail C

2.190

0.200

0.300

2.000

0.263

1S3 ( 20 x 30 )

Detail C

4.060

0.200

0.300

2.000

0.487

1S3 ( 20 x 30 )

Detail C

1.340

0.200

0.300

2.000

0.161

1S3 ( 20 x 30 )

Detail C

1.410

0.200

0.300

2.000

0.169

1S3 ( 20 x 30 )

Detail C

5.750

0.200

0.300

2.000

0.690

1S3 ( 20 x 30 )

Detail D

3.350

0.200

0.300

1.000

0.201

1S3 ( 20 x 30 )

Detail E

3.350

0.200

0.300

2.000

0.402

Jumlah Total Volume

4.285

1S4 ( 15 x 20 )

Detail A

1.580

0.150

0.200

4.000

0.190

1S4 ( 15 x 20 )

Detail B

3.350

0.150

0.200

4.000

0.402

1S4 ( 15 x 20 )

Detail B

2.250

0.150

0.200

2.000

0.135

1S4 ( 15 x 20 )

Detail B

0.400

0.150

0.200

2.000

0.024

1S4 ( 15 x 20 )

Detail D

6.440

0.150

0.200

1.000

0.193

1S4 ( 15 x 20 )

Detail D

1.750

0.150

0.200

1.000

0.053

1S4 ( 15 x 20 )

Detail E

1.580

0.150

0.200

1.000

0.047

1S4 ( 15 x 20 )

Detail E

3.980

0.150

0.200

1.000

0.119

1S4 ( 15 x 20 )

Detail F

2.150

0.150

0.200

1.000

0.065

1S4 ( 15 x 20 )

Detail G

2.580

0.150

0.200

1.000

0.077

Jumlah Total Volume

1.305

Diperiksa Oleh :
KONSULTAN PENGAWAS
CV. MULTY DESEKO

Dibuat Oleh :
KONTRAKTOR PELAKSANA
PT. TIGA PUTRA WIJAYA

ADE DESRY KURNIAWAN, A.Md


Inspector

MUSMULYADI
Pelaksana Lapangan

PEMERINTAH KABUPATEN BENGKALIS


DINAS PEKERJAAN UMUM
Jalan Pertanian No. Telp. (0766) 80010002 Fax. (0766) 80010002

BENGKALIS

KEGIATAN
PENINGKATAN SARANA DAN PRASARANA APARATUR

LAPORAN HARIAN
PELAKSANAAN PEKERJAAN

PEKERJAAN

: LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH


TINGGI ILMU EKONOMI (STIE) SYARIAH KAB.
BENGKALIS

NOMOR KONTRAK

: 05 - NK/SP/KPA/PU-CK/VIII/2015

TANGGAL

: 08 JULI 2015

ADDENDUM I

: -

TANGGAL

: -

LOKASI

: KABUPATEN BENGKALIS

NILAI KONTRAK

: Rp.

PELAKSANA

: PT. TIGA PUTRA WIJAYA

KONSULTAN PENGAWAS

: CV. MULTY DESEKO

2,924,943,000.00

LAPORAN HARIAN PEKERJAAN

PEMERINTAH KABUPATEN BENGKALIS


DINAS PEKERJAAN UMUM

KEGIATAN

: PENINGKATAN SARANA DAN PRASARANA APARATU


PEKERJAAN : LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH
TINGGI ILMU EKONOMI (STIE) SYARIAH KAB.
BENGKALIS
KONTRAK
: 05 - NK/SP/KPA/PU-CK/VIII/2015

KONTRAKTOR PELAKSANA

PT. TIGA PUTRA WIJAYA


KONSULTAN PENGAWAS

TANGGAL

: 08 JULI 2015

LOKASI

: KABUPATEN BENGKALIS

T. A.

: 2015

CV. MULTY DESEKO


JANGKA WAKTU

WAKTU PELAKSANAA
150
Hari
MENURUT KONTRAK Hari Kalender Tanggal

A.

:
:

September 20

Mulai Tanggal
: 08 Juli 2015
04 Desember
Sampai dengan Tanggal:
2015

CUACA
J
WAKTU

7.00

9.00
8.00

11.00
10.00

M
1.00

12.00

3.00
2.00

5.00
4.00

KETERANGAN
6.00

SIANG

= BAIK

MALAM

= HUJAN

B.

TENAGA KERJA

NO.

URAIAN

C. BAHAN - BAHAN YANG DIMASUKKAN


JUMLAH

NO.

1
2

Pelaksana Lapangan
Adm Lapangan

Org
Org

1
2

3
4
5

Kep. Kerja / Mandor


Kepala Tukang
Tukang Batu

Org
Org
Org

3
4
5

6
7

Tukang Besi
Tukang Kayu

Org
Org

6
7

Pekerja

Org

Keamanan

Org

9
10
11

TOTAL

Org

JENIS BAHAN

VOLUME

D. PEKERJAAN YANG DILAKSANAKAN


NO.

URAIAN PEKERJAAN

VOLUME

KETERANGAN

1.
2.
3.
4.
5.
6.

Diperiksa Oleh :
KONSULTAN PENGAWAS
CV. MULTY DESEKO

ADE DESRY KURNIAWAN, A.Md


Inspector

Bengkalis,
September 20
Dibuat oleh :
KONTRAKTOR PELAKSANA
PT. TIGA PUTRA WIJAYA

MUSMULYADI
Pelaksana Lapangan