You are on page 1of 4

Republic of the Philippines

Department of Education
Region XII
Division of Sultan Kudarat
KALAMANSIG NATIONAL HIGH SCHOOL
Kalamansig

PROJECT PROPOSAL
PROJECT TITLE:
TECHNICAL VOCATIONAL

PROVISION OF TOOLS AND EQUIPMENT FOR


AND SENIOR HIGH SCHOOL CURRICULAR

PROGRAMS
PROJECT LOCATION:

KALAMANSIG NATIONAL HIGH SCHOOL


KALAMANSIG, SULTAN KUDARAT

RESPONSIBLE AGENCY:

KALAMANSIG NATIONAL HIGH SCHOOL

PROJECT COST:

P 421, 990.00

SOURCE OF FUNDS:

LOCAL GOVERNMENT UNIT

I.

RATIONALE OF THE PROJECT:


As the present society changes, so are the demands of education, skills and
opportunities. To cope up with these changes, the government through the
Department of Education (DepEd) developed the countrys educational system.
Initial changes include the integration of Technical Vocational skills in the basic
education and total shifting to K to 12 Curriculum.
The said development has both advantages and disadvantages. Since it
focuses on the improvement of skills, the students are given not just with basic
knowledge but also experiences and practicum that would enable them to learn
both the theoretical and technical aspects of their chosen specializations. It
basically prepares them to the world of entrepreneurship and employment.
However, the implementation of the said curricular programs is quite challenging
not just to the students but also to the school personnel for it is a wide known fact
that our government is accustomed of giving projects with delayed release of
budgets. Because of this, schools like Kalamansig National High School strive to
implement the programs with our own initiatives and whatever assistance the
DepEd currently gives.
Much to our desire of providing quality education to our students, we are
hindered by some obstacles particularly lack of tools and equipment for both the
Technical Vocational Curriculum and K to 12 Senior High School Modeling
Program (specializations offered are Cosmetology, Food Trades and Computer
Hardware & Servicing). Hence, the practical opportunities that we can provide to
the students become limited.
One means to address such is to establish partnership with the parents in
providing the said deficiency. But then, most people in our area belong to
marginalized families. Many wanted to extend hand to the school but their
finances can hardly suffice to their basic necessities.

II.

STATEMENT OF THE PROBLEM:


Kalamansig National High School currently implements the Strengthened
Technical Vocational Program (STVEP). It focuses on seven skills specifically the
Shielded Metal Arc Welding, Food Trades, Beauty Care, Electric Installation and
Maintenance, Carpentry, Garments and Computer Hardware& Servicing.

Moreover, the school was chosen as one among the three schools in the
Sultan Kudarat Division to model the Senior High School Program. The said
modeling was initiated this school year 2014 2015. Specializations offered are
the Cosmetology, Food Trades and Computer Hardware & Servicing.
As per observation, the school lacks tools and equipment necessary for
these endeavors. Results of division and regional level evaluations also showed the
same. Hence, the schools pursuit of producing quality students and graduates is
compromised.
Thus, this prompted the school to seek for partnership with other able public
agencies like the Local Government of our municipality.

III.

OBJECTIVES OF THE PROJECT:

General Objective:
competent and competitive

To improve the quality of education and produce


students

Specific Objectives:
Strengthened

1. To provide necessary tools and equipment for

Technical Vocational and Senior High School Modeling


Programs
2. To equip students with sufficient opportunities to master the
basic
competencies
3. To strengthen the secondary basic education of our
municipality
IV.

BUDGETARY REQUIREMENTS:
EIM

QTY.

UNIT

1
1
1

pc
unit
unit

unit

1
1
1
1
1
1
1

unit
unit
unit
unit
unit
set
pc

1
1

pc
pc

Particular
Multi-Tester Model Sanwa 360
TR
Clammeter Sanwa
Cycle meter Sanwa
Ammeter 300 ampere x 220
volts
Ammeter 10 ampere x 220
volts
Ammeter 10 ampere DC
Voltmeter 250 volts AC
Voltmeter 25 volts DC
Wire gauge
Screw driver
Hard hut yellow
Electrical gloves 250 rating
volts
Set of Pliers
TOTAL
COSMETOLOGY

Unit Price

Total

1,500.00
4,000
500

1,500.00
4,000.00
500.00

500

500.00

300
300
300
300
1,000.00
450
350

300.00
300.00
300.00
300.00
1,000.00
450.00
350.00

250
500

250.00
500.00
10,250.00

QTY.
2
5
3
3
2
3
3

UNIT
pc
pc
pc
sets
sets
units
units

QTY.
1
5
1
2
1
1
1
2
1

UNIT
unit
sets
unit
units
unit
unit
unit
units
unit

QTY.

UNIT
units

2
units
2
sets
2
units
2
units
2
units
2
unit
1

Particular
Foot Bath Machine
Blower/Hair Dryer
Curling Iron
Electric Curlers
Shampoo Bowl Set
Straightening Iron
Razor with blade
TOTAL
FOOD TRADES
Particular
Reach in Freezer & Ref.
Tables w/ built sink & stove
Gas Range w/ Oven
Stock pan burner
Microwave Oven
Blender Machine
Meat Grinder
Fire Extinguisher
Heavy Duty Oven

Unit Price
2,500.00
1,500.00
1,500.00
1,000.00
2,000.00
2,500.00
2,500.00

39,000.00
Unit Price
23,000.00
5,000.00
18,000.00
2,500.00
6,000.00
1,500.00
3,000.00
2,500.00
60,000.00

Total
23,000.00
25,000.00
18,000.00
5,000.00
6,000.00
1,500.00
3,000.00
5,000.00
60,000.00

TOTAL
COMPUTER HARDWARE & SERVICING
Particular
Unit Price
Diagonal pliers
150.0
0
RJ-45 crimper
400.0
0
Extension cord
400.0
0
Standard Screwdriver
100.0
0
Combination wrenches
470.0
0
Computer w/ NIC Card
25,000.
00
Multi Media Projector
20,000.
00

146,500.00

TOTAL
QTY.

UNIT
1
1
1
1
1
1
1
1

QTY.
5

pc
pc
pc
pc
pc
pc
set
unit

UNIT
SETS

Total
5,000.00
7,500.00
4,500.00
3,000.00
4,000.00
7,500.00
7,500.00

SMAW
Particular
Fortable Grinder
Bench Grinder (Permanent)
Hand Drill (Portable)
Bench Vise
Steel Brush
C-clamp
Files
Power Hacksaw
TOTAL
GARMENTS
Particular
Sewing Machine
TOTAL
CARPENTRY

Unit Price

Total
300.0
0
800.0
0
800.0
0
200.0
0
940.0
0
50,000.
00
20,000.
00
73,040.
00
Total

3,700.00
4,500.00
3,500.00
3,000.00
1,500.00
1,000.00
10,000.00
21,000.00

3,700.00
4,500.00
3,500.00
3,000.00
1,500.00
1,000.00
10,000.00
21,000.00
48,200.00

Unit Price
9,000.00

Total
45,000.00
45,000.00

QTY.

UNIT

1
1
1
1
2

unit
unit
unit
set
units

Particular

Unit Price

Bench Vise
Mini Chainsaw
Electric Hard Drill
Saw
Electric Plainer
TOTAL

6,000.00
35,000.00
8,000.00
5,000.00
3,000.00

GRAND TOTAL

V.

Total
6,000.00
35,000.00
8,000.00
5,000.00
6,000.00
60,000.00
421,99
0.00

METHODOLOGY:
Kalamansig National High School administration with the assistance of the
Department Heads of Strengthened Technical Vocational and Senior High School
Modeling programs determined the list and estimated prices oftools and
equipment needed by the school.The reports were then consolidated and a project
proposal was prepared and submitted to the Local Government Unit of Kalamansig.

Prepared by:

Checked and Reviewed by:

ERLINDA G. HAUDAR
BILLEDO
Secondary School Principal I
Development Officer

BERNARDINO
Municipal Planning and

Approved by:
ROLANDO P. GARCIA
Municipal Mayor

You might also like