You are on page 1of 4
pe SPEED CONCRETE INDUSTRIES SDN BHD ALAYONOD LSVOANd on a) - a F Pa Q v ba es m a FS ba = = o < L¢) + m = www.speedconcrete.com.my DESCRIPTION OF SP-WALL SYSTEM ‘The Speed SP-Wall system is precast retaining wall system which consist of 3 components, namely - + Reinforced Concrete Pillar. + Reinforced Concrete Spanning Panel. + Tie Back System, ‘The stability of system is obtained from passive eart with pressure mobilized in front ofthe embedded toe ofthe wall and it has been enhanced by aditional support through the deployment of anchors, tes, struts placed at appropriate level at the back of RC Pillar. INSTALLATION AND METHOD ‘The SP-Wall system is mainly used to retain earth exposed smooth concrete surfaces. The RC Pillar and RC Spanning Panel can be insalled easily and efficiently because of the bul-in sf mounting joint. The RC Pilar willbe driven into the soll by Lsing vibro — hammer or hydraulic drop hammer folowed by mounting of RC Spanning Panel between two RC Pilars. IT can be installed in straight line or curve profile folows the requied | design alignment. The sequence of installation is described fellowing:- = Site clearing with working access platform. += To sat the alignment of wall and instal que frame, + To itch, align in positon and to drive the RC Pillar. + To install RC Spanning Panel and place ie back anchor or cast capping beam. + Backfling and finishing USAGE AND APPLICATION ‘The SP.Wall system can be used forthe following purpose: + Shoreline and slope protection * River widening and river bank protection. + Retaining wall fr land reclamation. Extended soil platform for adcition space for residentiaicommercial land development. Channel ining for drainage system. ADVANTAGES '= The SP-Wall system require light machineries and small access road for installation. 1 The deep penetration of spanning panel into soil profile and it will not affect by to erosion or scouring which norm happen at conventional retaining wal ' Fast installation and no additonal temporary work is require to save the time and cost ' The wel design joints efminate the gaps normally happen between precast drain or L-shape units ' Easy to transport as compared with large size L-shape units. ™ Efficient SP-Wall design has minimized the foundation cost significantly, INSTALLATION OF SP WALL SYSTEM PROJECT FOR JABATAN KERJA RAYA, KUALA KUBU, SELANGOR DIMENSION & DETAIL OF SPANNING (SP WALL) RCPiar oon neh 600, ners 3000, SPWALLPANEL AHinmnimeten SPwaleanel | _WiOTHOWT | TMEANESS On| _MATNEROA] —_RSIGHTIATT 73) ee 750 3o00 TECHNICAL DATA “SPWALLPANEL | _ACPRLART)— Sete alioad | URinwtetenang Wagon ‘mn “ype [teatnty| omentum | 5 no az | rom] we) ea | 790 o 96 4ar nee |-s000—| 750 aw Baz coe || — 750 ao as Ses oa] nor ean | 70 iz rsx | 1a ice-8—|-soog | 750 1a az coz | vate | 750 1 35 INSTALLATION OF SP WALL SYSTEM PROJECT FOR TAMAN MUTIARA RINT, JOMOR BAHU,

You might also like