Professional Documents
Culture Documents
Transport Jakarta en
Transport Jakarta en
Transport Jakarta en
July, 2011
TOPOGRAPHY OF JAKARTA
JAKARTA
LOW-LYING PLAINS
DEMOGRAPHIC CONDITIONS
Total population + 9.2 million (extrapolated from census)
By day, population of + 11 million, including commuters
from the BODETABEK regions
Population density is + 14,000 persons/km2. In some
areas this figure reaches 49,368 persons/km2 (Tambora
District)
Total population of Jabodetabek (Jakarta + Bodetabek)
25 million
TRANSPORTATION IN JAKARTA
TRAVEL
REQUIREMENTS
MOTOR
VEHICLES
TRANSPORT
MODE
BREAKDOWN
98.5%
98.5% of
of private
private vehicles
vehicles servicing
servicing 44%
44% of
of trips
trips
Only
Only 1.5%
1.5% of
of vehicles
vehicles servicing
servicing 56%
56% of
of trips
trips
(including
(including 3%
3% serviced
serviced by
by Jabodetabek
Jabodetabek trains)
trains)
ROAD
NETWORKS
7,650 km of roads
40.1 km2 of road area (6.26% of Jakartas total area- Road Ratio)
Annual growth in road length only 0.01%
COSTS OF
CONGESTION
MACRO TRANSPORTATION
PLAN (MTP)
MRT/Subway + trains
3 MTP STRATEGIES
DEVELOPMENT OF
MASS RAPID TRANSIT
LRT/Monorail
BRT/Busway
Limitations of the Use of
Motor Vehicles
MACRO
TRANSPORTATION
PLAN
(MTP)
TRAFFIC RESTRAINTS
Road Pricing/ERP
Parking Restrictions
Park & Ride Facilities
ATCS / ITS
INCREASING
NETWORK
CAPACITY
Road Widening/FO/UP
Developing Road
Networks
Pedestrian Fasilities
10
11
BUSWAY
EXISTING CONDITION
Long
Corridor
Total Bus
Total Passengers
Total Passengers
DEVELOPMENT
2 Corridors (11&12)
3 FeederS and
Bus Procurement 114 bus
- 2011 : 44 Unit Articulated bus
- 2012 : 70 Unit Articulated bus
- 2012 : 1 Unit to change
the new one in Corridor 1
10
9
15
Blok M - Kota
Gajah Mada/Hayam Wuruk Majapahit M. Merdeka Barat
Mh. Thamrin Jend. Sudirman - Sisingamangaraja
2
2
1
3
16
4
5
6
14
11
12
8
9
10
Daan Mogot Kyai Tapa Hasyim Asyhari Harmoni CB Juanda Pasar Baru
11
6
7
13
12
13
14
15
13
BUSWAY
FACTS
PROBLEMS
14
BUSWAY
FOLLOW-UP STEPS :
Evaluation and consolidation of planning
future busway routes
Development with better coordination and
public education.
Multi-year development.
Development of a feeder system in order
to optimise Busway services.
15
BUSWAY
SUPPORTING FACILITIES REQUIRED FOR
DEVELOPMENT OF THE BUSWAY SYSTEM:
16
17
MRT / SUBWAY
Stage 1 Plan, Lebak Bulus Dukuh Atas route
(14.5 km).
Financing by Japanese government loan through
JBIC (Loan No. IPIP-536, November 2006)
Detailed Engineering Design (2007 2009)
Physical development planned to commence in
2010 and conclude in 2014.
Planned Stations
Dukuh Atas
Setiabudi
Bendungan Hilir
Istora
MRT Map
Jakarta Kota
Senayan
MRT Northern
Extension
Future plan
Sisingamangaraja
North
West
Central
Blok M
Blok M
East
Blok A
South
Lebak Bulus
Haji Nawi
12 Stations :
8 Elevated
4 Underground
Cipete Raya
Lebak Bulus
Fatmawati
Integration
with other
modes of
transport
18
MRT / SUBWAY
STATUS :
Documentation for tenders for Detailed Engineering Design
(DED) planning consultants and MRTC consultants has
been made.
DED planning consultant tenders currently being processed
by the Department of Communications.
Loan Agreement Amendment currently being processed as
a legal basis issued by Ministry of Finance on use of funds
loaned by the Central Government as grants to the Jakarta
Provincial Government.
Provincial Decree currently being processed by the Jakarta
Provincial Government on the formation of PT. MRT Jakarta
and the inclusion of government funding in said company.
19
MRT/ SUBWAY
FOLLOW-UP STEPS :
Appointment of consultants as DED planners (Dept.
Communications)
Signing Amendment to Stage I Loan Agreement (Dept. Finance
and National Planning Board / Bappenas).
Issuing instruction from Dept. Finance and documents regarding
on-granting to Jakarta Provincial Government (Dept. Finance &
National Planning Body)
Tender for MRTC consultants (after completion of on-granting to
Jakarta Regional Government) (Regional Planning Board & MRTC).
Structuring of Stage II Loan (National Planning Board).
Planning and preparation for construction of MRT (land acquisition
etc) including parallel development of MRTC (as in line with
attached Roadmap).
20
MRT / SUBWAY
OTHER MATTERS :
21
JABODETABEK RAILWAY
Jabodetabek train program:
1
Airport
ANCOL
KP. BANDAN
1,364 km
DURI
PESING
BOJONGINDAH
RAWABUAYA
19.297 km
Thb Depot
SAWAHBESAR
GAMBIR
GANGSENTIONG
KRAMAT
CIKINI
MANGGARAI
MAMPANG
SUDIMARA
29.738 km
GONDANGDIA
SUDIRMAN
23.278 km
Stabling Tng
KARET
PONDOKRANJI
TANGERANG
9.890 km
KEBAYORAN
BATUCEPER
PASARSENEN
JUANDA
PALMERAH
PORIS
KEMAYORAN
MANGGABESAR
TANAHABANG
KALIDERES
RAJAWALI
JAYAKARTA
GROGOL
TAMANKOTA
6.751 km
JAKARTAKOTA
ANGKE
TANJUNGPRIOK
BY Mri
PONDOKJATI
Bud Depot
TEBET
Jng Depot
JATINEGARA
CIPINANG
KLENDER
CAWANG
DURENKALIBATA
RAWABUNTU
BUARAN
PASARMINGGUBARU
KLENDERBARU
14.802 km
SERPONG
PASARMINGGU
Stabling Srp
44.920 km
TANJUNGBARAT
LENTENGAGUNG
UNIV. PANCASILA
CAKUNG
RAWABEBEK
KRANJI
BEKASI
UNIV. INDONESIA
Stabling Bks
PONDOKCINA
DEPOKBARU
Airport train
DEPOK
Depok Depot
CITAYAM
BOJONGGEDE
CILEBUT
BOGOR
Stabling Boo
JABODETABEK RAILWAY
OBJECTIVES BEHIND CONSTRUCTION OF
MANGGARAI CIKARANG DOUBLE TRACK LINE :
24
JABODETABEK RAILWAY
25
4.3 km
Pluit
4.9 km
3.1 km
2.8 km
26
SOEKARNO HATTA
INTERNATIONAL AIRPORT LINE
CURRENTLY BEING COORDINATED :
27
MONORAIL
28
MONORAIL
The Monorail was originally a purely private sector venture.
Presently :
As required by PT Jakarta Monorail, the Government has
provided support in the form of Presidential Order 103/2006
and Ministry of Finance Order 30/PMK.02/2007.
Until now, PT. Jakarta Monorail has not yet realised financial
closing.
Banks have queried three matters: equity, government
guarantees and monorail capacity and feasibility regarding total
passengers.
The Monorail project needs to be redefined, including its form of
funding (reverification, including cashflow projection, estimated
construction costs, income flow and passengers.)
29
STATION INFORMATION
Green Line
Length : 14.3 km
Rute
Monorail
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
Stadion Madya
Palmerah
Pejompongan
Karet Interchange
Sudirman-Dukuh Atas
Setiabudi Utara
Kuningan Central
Taman Rasuna
Casablanca Interchange
Grand Melia
Gatot Subroto
Satria Mandala
Komdak
SCBD
Gelora Senayan
Plaza Senayan
Blue Line
Length : 9.7 km ; 11 stations to Tanah Abang
Length : 13.5 km ; 15 stations to Taman Anggrek
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
Kampung Melayu
Tebet
Dr. Saharjo
Menteng Dalam
Casablanca Interchange
Ambassador
Sudirman-WTC
Menara Batavia
Karet Interchange
Kebon Kacang
Tanah Abang
Cideng
Tarakan
Tomang
Taman Anggrek Mall
30
31
32
PLUIT
RAWA
BUAYA
KEMAYORAN
W1
Access to
Tanjung
Priok
SUNTER
DURI PULO
TOMANG
TANAH ABANG
KAMPUNG MELAYU
To Tangerang
W2
PULO GEBANG
CASABLANCA
ULUJAMI
CAWANG
Note :
Acceleration of the construction of W1 & W2 will assist traffic
distribution between Jakarta and the west, as well as airport access.
Acceleration of access to Tanjung Priok will assist goods traffic to
and from the port, as well as Inner Ring Road toll road traffic (goods
vehicles access Tanjung Priok directly).
To Bekasi
Already
completed
PASAR MINGGU
TAMAN. MINI
KEY :
= TOLL ROAD ALREADY IN OPERATION
= PLANNED/IN PROGRESS
33
COMPLETION OF JORR
(JAKARTA OUTER RING ROAD)
JORR W1 (9.7 km)
Investor: PT. Jakarta Lingkar Baratsatu
Needs speeding up of construction for operation by end of 2008.
JORR W2 North (7 km)
A PT Jasa Marga enterprise
Held up by land acquisition problems
Needs speeding up of land acquisition and construction
Tanjung Priok Access Toll Road (12.1 km)
Undertaken by the government
Land acquisition by Jakarta Provincial Government
34
AIRPORT
PLUIT
RAWA
BUAYA
KEMAYORAN
SUNTER
3.4 km
2.3 km
TOMANG
7.8 km
TANGERANG
4
3.8 km
TO MERAK
KAMPUNG MELAYU
PULO GEBANG
ULUJAMI
TO BEKASI
2.7 km
CAWANG
TO BEKASI/CIKAMPEK
PASAR MINGGU
SERPONG
TAMAN. MINI
KEY :
1
KEY :
= TOLL ROAD ALREADY IN OPERATION
= PLANNED/IN PROGRESS
6 Proposed segments :
= ARTERI ROUTE
= KALI SENTIONG ROUTE
= PT KAI LAND ROUTE
= WESTERN FLOOD CANAL ROUTE
2
3
4
5
6
TO BOGOR
35
DETAILS OF 6 JAKARTA
CITY TOLL ROAD SEGMENTS
No.
Segment
Length
(km)
Estimated Direct
Cost
(Rp, billions)
EIRR
(%)
1.
18.95
9,761
32.47
2.
14.73
7,378
24.75
3.
11.38
5,960
30.63
4.
8.27
4,255
34.50
5.
9.64
6,953
23.90
6.
9.56
5,720
21.68
Total
72.53
40,027
36
PLANNED DEVELOPMENT OF
6 JAKARTA CITY TOLL ROAD SEGMENTS
Below are Jakarta Provincial Government suggestions to
the central government (Minister of Public Works) re 6 City
Toll Road segments in Jakarta with the following
considerations:
- As part of efforts at increasing new road networks to
improve the road ratio
- Improving Road Network Structure Hierarchy in Jakarta
(Arterial Road Networks which currently do not meet
standards)
37
THANK YOU
41