RAPID SURVEYING

TIME : 30 MIN
1. A truck 4 m long with rear end in contact with a tall pillar started
moving with an acceleration of 4m/s^2 , travels for 2 sec and a
theodolite is attached to its front edge showed an angle of elevation of
45degrees when sighted to the top of the pillar .what is the height of
the pillar?
2. The sloped/radial distances of the top and bottom of the tower from a
theodolite placed at 25m from the tower are 25(root 5) and 25(root 2)
respectively. What is the height of the tower?
3. Geodetic survey is considered when the distance measured is more
than :
4. In closed triangular traverse ABC, FB of AB and BC are 120 degrees and
230 degrees respectively what is value of angle B?
5.

6.

7. Instrument used for enlarging or reducing plans is :

8. What are provided in the chain survey to find the accuracy of the
work?
9. Correction for true bearing is +ve when magnetic meridian is towards
which side of true meridian ?
10.
a.
b.
c.
d.

Which of the following are not perpendicular to each other


Vertical axis Axis of Horizontal bubble tube
Vertical axis Axis of Altitude bubble tube
Trunion axis line of collimation
Line of sight line of collimation

11.
To find out included angles if the traverse is clockwise, then the
angles obtained are :
12.

Sum of included angles of 7 sided polygon:

13.

Length of engineers chain is

feet

14.
If chain is too long, then the measured distance is
than the actual distance.
15.
For perfectly balanced traverse, difference between FB and BB of
a line is always :
16.
When vertical circle is towards right hand side, it is
called_______position
17.
Contour level for a site representing a valley will be of
from the centre of the map.
18.

Universal surveyors instrument is

19.
The bearings of the line AB and BC are 146degrees 30 and
68degrees 30 respectively, the included angle ABC is :

20. The independent and dependent coordinates of B