You are on page 1of 33
Project Name: 42218 Chisinau Urban Road Sector Project Moldova Rehabiltation of streets and footways network, establishment ‘of on-street parking facities and upgrading of street lighting 12 February 2014 Procurement Method: Open Tendering ‘Contract Duration: 24 months: Contract(s\/Lot(s) Reference Name/Number: 7240-IFT-42218 Winner: ‘SC DELTA ACM — 93 SRL Chicurel nr. 38-45 Street, Sector 3, Bucuresti, Romania Contract price offered: 11,571,475.68 EURO Other tenderers: 1. ELECNOR S.A. (Spain) 2 INGSTROYENGINEERING Ltd (Bulgaria) 3. SC TANCRAD SRL (Romania) 4. Sk-13 PATSTROY JSC (Bulgaria) 5. RESEARCH CONSORTIO STABILE SCAR L (lal) & SC. EDILTURCI SRL (ltaly) ‘Tender prices read out at Tender Opening: 1. ELECNOR S.A (Spain) - 16,528,543.49 EURO 2 INGSTROYENGINEERING Ltd (Bulgaria) - 9,999,090.99 EURO 43. SC TANCRAD SRL (Romania) - 12.306.130.29 EURO. 4. SK-13 PATSTROY JSC (Bulgaria) - 10,624,694.51 EURO '5, RESEARCH CONSORTIO STABILESCARL (aly) & ‘SC. EDILTURCI SRL (Italy) - 14,950,578.94 EURO 6.SC DELTA ACM ~ 93 SRL (Romania) -11,571,416.11 EURO Tender prices evaluate 41. ELECNOR S.A. (Spain) - 16528,543.49 EURO 2 INGSTROYENGINEERING Ltd (Bulgara) - 10,000 688.48 EURO 3. SC TANCRAD SRL (Romania) - 12.405,542.88 EURO 4. Sk-13 PATSTROY JSC (Bulgaria)- 10,824,694,51 EURO ‘5. SC DELTA ACM ~ 93 SRL (Romania) -11,571,475.68 EURO Tenderers rejected: RESEARCH CONSORTIO STABILE S.CAR.L. & SC, EDILTURCI SRL (tay) =" The Tender Securiy Is not compliant with the provisions of the Tender Documents. Tenderers not post-qualified: INGSTROYENGINEERING Lid (Bulgaria) = “The Tenderer does not satisfy the minimum cfteria as expressly mentioned in the Tender Documents: General Experience (Part |, Section Il ~ Table 2.4.1) and Specific Experience (Pat |, Section lll ~ Table 2.43). 'SK-13 PATSTROY JSC (Bulgaria) = The Tenderer does not satisfy the minimum cfteria as expressly mentioned In the Tender Documents: Speciic Experience (Pat |, Section lll = Table 242 and 243), wo copse? . Wi Tenders Evaluation Report for Procurement of Works Procurement of: Rehabilitation of streets and footways network, establishment of on-street parking facilities and upgrading of street lighting (Package 1) under the Chisinau Urban Road Sector Project Issued on: March 21, 2014 Tender No: 7240-IFT-42218 Employer: City of Chisinau Country: Republic of Moldova 200 ‘TABLE OF CONTENTS ‘Summary Evaluation Data and Award Recommendation FORMS Record of Tender Pre Examination of Tender Substantially Nonesponsive Tenders Correction, Conversion and Adjustmont of Tander Prices >. Tenders Subject to Detailed Evaluation Evaluation of Tenders Comparison of Tenders Post qualifeation at Opening ANNEXES 4. Contract Data Sheet 2. Checktist for Opening of Tenders 3. Minutes of Tender Opening 4. Register of Attendance at Torwder Opening 5. Lisl of Fimms that Purchased Tender Documents 6. Minutes of Pre-tender Meating : 8 a 4 Log of Clatifications Requested by Tenderers and Responses Issued ‘Log of Addenda to Tender Docurnents Issued Log of Clarifications Requested and Respons 10. Log of Complaints and Appeals Received Received 1. Projet: 2 Contac 4. Taner ovehaton eur Rehan of sets and Scomsys neta ‘Summary Evaluation Osta and Aare Recommendation Chou Urn Road Sac Prot Na. 42208 12022014. 1200 joc tma} bran’ fortes paring faites and upracing fstostghing (Package 1) 2 : [ong | ET ET cra Ye va Torre, | semen | sports " rena cavern _| Genero) | aR eum u ceca reszasisa | reszasisas | a 2 | NESTROVENGNEERNGL | EUR en | wire | cum |, | Cera acres, ‘eile sssescesa | ssoassnes | quod | .ooasas.ce rete] 7 Se ANRAO AL Ra] EIR aR—|— ve |e a 1 12,306,130.29 | 12,306,130.23 | 12.408, 500.06 TSC FATSTRGY IESG | EU tome] a Tea aS jaaspota | een Eo azapies[Pa| [coarse aes | inrom suapatiao 5 | — RESERRGH EOREORTIO oR =F "he Tar cay] sfaurseawe payase | tessonrese | wesnsraae sscxpubeerdeatesinram | ebLTuRe' Atay) ! SinocionelTene | [epee betraner= eo a =| aR} aR 1 omens nena | wsrtaten grisrose i Lye EI: TeBaOAVEIITEUED) Hee EF 12, Jo Jaquisu ‘aso ieusg ezeouS us0K SHEN ov op fay senaoee wsenuco aig Sunauoned CS + SIB.SBuet DeterIeAS sseNo| puONES ax $2 a oa ran FORM I Record of Tender Pr Prajeet ‘Chisinaw Uedan Read Seetor Project one Rehabilitation of srsets nd footways network, establishment of on-street parking asics and ngrading oF street Package 1) The following tenders were receiv by the (ender eloing eatin: Beda 12.02.2014 at 12M am and were pein Smeal Drees No. Name of tenderer Tender amount(s) Note ee _____Aauress nationality eR V6S2RS43.49 Without VA, 8,998,998.98° Na discount Re, Wiha Wat Ne diseount Without VAT, Novdiscount 5) RESEARCITCONSORNIO STAIN SEAR hay) TA9SUSTRDE Who VAT S8C, EDILTURCTSRL (aly) Na discount Wwithowe Vi No discount SE DELTA ACM 98ST (tom: Taian FORM 2(1) ation of Tende Projet: Chisinaw totam Rand Sestar Prajet Conroe: Rehabiitadian of stress upgrading af street Hight ud footway netvar, sak (ackage 1) yon oF an-styet parking faites we Tenderer t NORS.A(S ) enn Requiervent Tends Docu 3 condivons in the Tender Volume; Specify, fe all on sesponsive y mens hie the aes etion the nalire of the ne tenderer i noncompliant, nae ‘ase feamplance and whether the responsive, has devisted oF has deviation 00 reservation spsife conduionalty ‘considered mri, 2 Togal Pas Seon FH Section Para. 4) Section Il ~ Table 2.1, Section IV ~ ke Leiter of Tender, Form 4, Form EL —— 2 ommercal | Part 1- Section | & Section t( 7 Para 13 14,15, 16,17, 18, 19,20}, Section V— osponsive | Lotter of Tender, Append to Tener, * Bil of Quantities 2 Tachnicat Parts “Section para 71, Seaton ttl para, 28; Pant 2- General Responsive nstruction Requirements ian and Method statement ~~ F Motitisation and Construction — re ‘Schedules; Same Rsponsive Conwracior’s Persone! Fesponsive List of Propo Responsive FORM 2 (2) Project: ‘Chisinaw tr tim Road Sector Conta: tation of sireets and faotways network, establishment of on-street parking Helos au (Package 1} Fender 2 ENGST ROVENGINEERING Had (Bugera) ~ Retin eauierent Tender Remarks Pbocunnent List of enaions in she Fender Volume: Specily, for all non-responsive Dowuments 1a which the par fries the nature BE the nom rsndror ik non-complint, so ‘louse emmianee “and whiher the espossve, has deviate 1 hs dleviation oF resenvaion nee connonaity ‘onsidered maeil | Pat Seaton 18 Seaton I Para | 4)Section Il~"Table 2.1, Section IV ~ } Letter of Tender, Form LIM, Form ELL 2 2” Cammordal | Bait T- Secon T& Sccion I(Para, 1, 14, 15, 18,17, 18, 19, 20}, Seetion IV Latter of ender, Appandx to Tender, Bil of Quantitos ~ Pan 7 Section w— para. 17.1, Section & para, 28; Part 2- Genoral ‘and Construction Requirements [i organisation an Meme sen Moblisaiion and Construction Schedules: Tegal > Teehnieal Responsive Responsive Responsive —Resporaivg Responsive 10 wn FORM 2.(3) Examination of Tenders Praja: “ Johan Rod Sector Prnject, Con: Rehab saps iow of streets and foatrays netwark establishment nfan-strect parang nee and cof tree Tight Package T) Feuer 3, SCTANCRAD SRE (Romana) ~ —— Rerw —— Requiemen Terser ere Dorument List of eonitions in the Tender Volume Specify, for all non-responsive Dowtimenis 16 which the pro smi the mate of he Hoo tsneror ix noncompliant wor aus eomplianse and whether the responsive, has ueviatel Or has eviation oF reservation Is specie conditional ‘onsiened winri &S (Pa 4 “Table 2.1, Section IV — Lotter of Tender, For EL, Form 2 | Pai i Section 18 Séciion I Para 13, 14,18, 16, 17,18, 19,20), Section 1W— Letter of Tender, Appendix fo Tender, Bill of Quantities Part 1 ~ Section ii para. 17.7 (hj, Section i I= pera, 28; Par 2- General and Construction Requirements * Sie organisation and Metod Stotement + Mabitsation and Constualon Schedules Sommercial > Technical | Responsive | | Responsive Responsive “Responsive Responsive 4 G 9 Projet: Chisinaw Urban Road Sestne Pract Contract: ‘Rehab upgrading of street lighting (Pakage 1) Fowlers SKIS PATSTROY JSC (Bulgaria) iti oaisinent Tender Document List of eanitons in the Tender Volume: DBosuinenis(@ which =the es tenderer is non-compliant, non ase tesnunsve, has deviated has specific condition Part Section’ Ti Section W (Para 4),Seation Il ~ Table 2.1, Section IV ~ Letter of Tender, For ELH, Form ELL 2 Part 7 Section 1& Section ii Para, 7 14, 15, 18,17, 18, 18, 20), Section ly — Letter of Tender, Appendix to Tender, Bil of Quantities Parl 7 Section tl para. 7 Section |& ll — pera. 28; Part 2- General and Gonsiruetion Requirements: + Bite organisation and Method Slaternent 7” Mobilisation and Constucton Schedles: + Contractors Equipirient + Contractor's Personnel = Tega “Commercial of streets and fotways network, estalishanent oF an-steet pa FORM 2 (4) examination of Tenders 1 altos and Spout for all wonsesponstve foie, the lef the on fomplianse ad bother the deviation ar reservation is Responsive Responsive Responsive | Responsive | Responsive S42 sire (Chisinau Urban Road Sector Prajeet Conner: Retbiitacion wt verets anal fonteays tar, xtaisho upgrading af trot ighting (Package €) TenereS. RESRARCH CONSORTIO SEAGIL — - ich - Rogirenint Tele Document 1s of eomitons inthe Fender Volume: Downs 40 which the pate render 8 sor-somnplion, no laa responsive, has deviated oF has sponte eonditionaity Leal Part 1: Seation 1 Section (Para 4) Section If ~ Table 2.1, Section Iv — Lotter of Tender, Form SLI-1, Form ELE = Comnmerd | Part 1- Section | & Section Ii (Para. 12, 14, 18, 16, 17, 18, 19, 20}, Section IV Letter of Tender, Appendix to Tender, Bil of Quantities Technical Section 18 ll - para, 28; Part 2- General ‘and Construction Requirements | ~Fiat T= Secon = para TFG, | FORM 2,5) examination of Tenders I S.CARL. SC, EDIL-TURCI SR (aly) emits Specify, for all nonsesponsive cties, the mature of the no fampliance and wher the feviaion ur reservation ‘onside materi ‘The Tender Security is nol compliant with the provisions of the Tender Documents; it does not rospect the template provides in the Tender Documents, In aocordance with ITT 19.2 , "the tenor secunly shall be submited’ ether using the tender security fom included in Soction IV, Tender Forms or i anather | Subsiantialy sirmler format approved by the Employer prior (0. Tender submission.” The Tender Security is valid tit s0in820%4 In accordance with ITT 19.2, the tender | security shall be valid for twenty-cight days (28) beyond the otiginal vaiidity | period of the Tender’, which, in ts case, moans at least 9107/2014 (see below) ‘statement + Mobiisalion and Gonsinaaion ane Schedules Responsive r = Contractors Equipment the “Tenderer” did wat presented documents rolaled to tho following equipment: 1 asphalt mixing plant, 1 road machine, 1 compactor, 2} (ucks >25 1, 1 grader The Tenderer id not nominated peopIs for the following positimns: Road gineer, Traffic Manager, Quality Assurance Expert, Health and Satoty Expert, as per the requirements of the Tendor Documents, Resp Coniaciars Personnel Note: Tender Securily presented by the Tender is not acceptable, ena FORM 2 (6) Examination of Tenders raj: a 10 Unban Road Sect Project Conse Rehabilitation oF streets and foorways nator extablihnent af anesovet parking eile id ‘opradinys a soc yh (Package f) Tender 8 PA ACM =93 SRE (on WE in Tener Remake Document [rans Cansrectn Reaomente, | Srotaten a eto Seri Halleaton ard Const octon Responsive Responsive Si 2 Taga [Pa Sion 18 Seton w (Para — 4).Section Il ~ Table 2.1, Section IV ~ ttecponsive Letter of Tender, Form ELI-1, Form ELI- mn 2 ~ Commercial | Part 1- Section T& Section ii (Para. 12, ~ - 44,15, 16,17, 18, 19,20}, Sation IV Ck Letter of Tender, Appendix to Tender, ~~ Bil of Quant > Technical “|” Part 1= Section Ii para. 17:1 (h), ~ — } Section Ill para. 28, Part 2- Goneal Responsive actor's Equipment Conivastor's Perscnnel ‘Gat of Proposed I orteaci FORM 3 ‘Substantially Non-rosponsive Tenders. The following tenders were rejected as substantially non-responsive: No. ‘Tender Reusons for rejection 5 RESEARCH CONSORTIO STABILE S.C.AR.L. & SC. EDILTURCISRI (Htaly) (4) Reasons for rejection: (The Tander Security provided by the Tenderer in his Tender is not compliant with the requirements ff the Tendor Documents, 9 1s Project: ‘ Coma Tenderer hoe Subii tender pre Arihmste rors Coneuted tender price won Tender price converted Adasen Far no tnaterl deviations, shih eam be guid Tijawet entero "ats 19 Ura Road Correct ns, Conversion and Adjustment of Tender Prices tor Project ehabiliaton of streets and foniways network, establishaent oF on-secel park vungraing of treet i eg (Package 1) FCNORS.A. (Spain) to S28548.49 From Faro None 6328.54.40 328,545.49 VORM4 (1) ‘0 F FORM 4 (2) Corrections, Conversion and Adjustment of Tender Prices Projet: (Chisinau Urban Road Sector Project Cones Rehabil ou of streets and footways wstvork, establishment af an-sirst parking elie and cf treet Fighting (Package 1) Temlere 2 Currency Renae 1 Submited tender pice 9.999.990.99 rom Farm 1 2. Avithmtis errs 1 6849 Correstions on Bi A. Corgcta eer price To.0 688.48 any 4, Tender pce converte 1.00 68848 5. Adiaments for woe Nit i tmaleviol deviations ohajmet enter pe Pen 0,688.48 Euro without VAT 02 FORM 443) Corrections, Conversion and Adjustment of Tender Projet (Chisinas Urban Road Sector Projet Contac Rehabiletion of trets sna footway netine,estaighont oC onset plang aves si of strestTghting Pack 1) Towlerr 3, SCTANCRAD SRE (Ramana) Canney | Submited tends price H2an6t30.29 From Form Avnet eos boiz sa Comets on Bi C6 3. Conse waner price .40s.542.88 4, ‘Tenor price comeried 12405,540.88 5. Adjustmens fer ni i tara deviations, ‘whic eam be quince Les ‘adusted cere price 12,405,542.44 Fanvo without VAT. FORME (1) Corrections, Conversion and Adjustment of Tender Prices Projet Chisinay Urban Road Suelo Project Contras: Uetnbilitatan of spe an Cootvays wetwar exablishnent of wstevet parking felis and tof street lighting (Package 1) Tener 4, SKUIS PAYSTROW.SE (Hn _ ee ret} a Submited ender pice Ins2o%4 1 From Foon 2. Cones enter pre sadonnst (ay Tender prise converted sca st 5. Adjusimonts far wr Na nals deviations, ‘hich ean be quantified 10,824,604.81 Fuso without VAY oe FORM 4 (6) Corrections, Conversion and Adjustment of Tender Prices Pre: Chisinau Urban Road Sector Projet Cont: Rehabilitation of sreots and Inocways metvnek, establishment af an-street parking ace a ygtading of treet ightug (Package Hy Fenders: 6 SC DELTA. ACM 93 SRL tan 1 Susie tendo prize Hsnatalt Frum Fon 4 i 2. Avidhnatic irons ssost CCameesions on Bill 10, Bll 6, Ral DS 3. Cowes ener price Hs7 47s 68 ary 4. Tender prize conven hismans.nx 5. Ahonen fr nate Ni alr eviations, ‘Which exo Be quantted wT Agee ey 11,574475.68 Karo without VAT FORM § ‘enders Subject to Detailed Evaluation On the basis of the spread of the auljusied tender prices andthe my criteria, it was decided to subject the Iolloseiny iui ienpaet of the evalvation tenders to a detniled evaluation: No. Tender 1 PLECNOR S.A, (Spain) 2 INGSTROVENG! A. SCTANCRAD SIR (Romania) 4. SGINFAYSTROV JSC (Buigasia) 6 SC DELTA ACM 93 SRE Is 22. raj Cont ‘per LAist ender rice aluation criteria fasspociid i He Tonuoe Documents) otal Galerie 3. vate tender pies wy Chisinan Ue strcets Put 1 Section 1 Section IM Pant 3 Part 1 = Section It Para 832 Alemaive Time for Compton” Porn 2 Nownateia Deviation ONOR S.A. (Span) aluation of Tenders Road Sector Projest ceuey 1604 18.49 ow 16528 545.49 Burs FORM 6) ul fons network, estalishnient of on-street parking Fait an ot street ign (Pakage Rents Explain al document haw ench criterion isapplied and talculated. Speci reference rust be rade othe eiteria Teer Dascuments Tin for Completion ruined by he Tenderer as po the Apponais te Fender a Dinh ni Without VAT, No dives 16 FORM 6.0) Evaluation of Tenders Proje: Sector Project Conta: ‘af streets an outa network, eBablishinent of ons rec ring Failies aed uprading of stroct lighting (Package t) Fenieer) 2, INGSTROVENGINERIING 140 Won Terr Dowuments |. Adinsted tends pris Part 1 —Sevtion 1 Section I~ Par 2 valuioneitenia fos specified inthe Tenner Documents) Part 1 Section I Pra 132 "Aliemative Time for Completion’ Porn 28.7 Ninna Devintions Teal forall erie (eu erates 10.90 088.48 xpin and shocurnent husrescherteron| isapplied ant faleafuted. Specific reference must be int Teer Ducting Tine fr Connptetion rniniained by the Tenderer as per the Appeati tender 3 anh, Ni 1090n.8K.48 Fue Withoue VAT, No diseoun 27 FORM 6 (3) waluation of Tenders raj ‘Chisina Ueto Road Seetoe Project Conta ARebalititation af strcels an (owas network, esablishient of on-street jar “ strc igh Towierer 3. SCTANCRAD SHR (Romaniay ef or Avot ems octnnents (eury LL Adiusel tender price Pant L- Section T & Section MFPs 2 vauain vteia [explain nt eocucat {os poet in the howe each even Terk Ducumenis) iv upp aad aleve, Spositie fefoveie mu be rade ote eerie the Tender DBocaiments, Part Lectin Ut Tre for Completion Pore 132 Altera suntan bythe Tine for Conypetion? Tenders er The Appelt Tend a 12 month Pen 28.7 ‘Nonusil Na Devinn Tova ral vtec 00 5, Evaluated tener price 8 Bure Withon VAT (13 No discoune Ww FORM 6 (4) -aluation of Tenders, Poot sina Urtae Rod Seotor Braet Game {Rehabilitation of streets and fntways network estashnsent of astro ark facies a Hef in Toler Amant Remini, octets (EUR) 1. Adjust tender price Pari Seton 1 10824,60451 Section ITP 31 2. valuation eer expan nl dcue (specifi i he hn each citron Ted acum) iappliod und sala. Specie reference st be rea the eieia ithe Tene Dretman Past |= Seti It “Tae For Completion Praca 13.2 ‘ARerative sain by the Time fr Cpls Tends as per the Appenix to Teslr nt 12mm 2a7 cy ‘Nonmterit Ni Deviations Tosa forall vtrin 000 4 sts tener pie HOR24 49451 Buen — Widow VAP “ Nodiseouat FORM 6 (6) juation af Tenders, Prove: (Chisinay Ueaw Road Sector Prejeet ona Rehabiiration of streets snd footways aecwark,estalishanen! oF on-seeet parking isbtes wn parading nf treo tightly (Package 1) andere SC DELTA ACM 98 SRI. (Romania) Xeon Vener nna oot (EUR |. Aste ender price Pant = Sostion Me 11,871.475.68 Section IM Para 3 2. Bvaluation eiteria explain nad cure {aspect in the haw cach eiteron Teruo Documents) inp un slenlawd. Specific refersace watt he Ima othe erieria inthe Tends Bacio Past = Section tt “Fine for Completion Para 13 2-Alervstive rmainsinad by He ine for Compton Tenderers per the ‘Nominee Mi Devinn “Tol forall enteria 0 4. Bvuluated tender pice 11 S7IATS.OH Faro Wihoot WAT 2) No discaont 20 See Prejec Comparison of Tenders FoRM7 onsscs Rebbe a ony nar, DIA aaa prhng ead epprtig lez ea ? 2 3 4 6 onecedaner ie G6SINSELAD CaN IRSA MDEGSRSETSTLATS ON wesontvar Adin nds pce T4ADRSENH ROEOSEN RNIN Na RLENSI Hatha woun var founded rss TRSDREKREY NNBGHRSH MESA ages THsTNaTE wins var aa FORMS (23 Postqualifieation shabilitatinn af strets and fontvays network, esublishinent of east park Sais ad Pret high tstan Rod Sestar Penjset uperading ofstreet tghting Package 1) Fonses 2 INGSTROVENGINERRING Lid (Boyar) Quattying itera ‘mene ‘ie oF Ines ini - _ Te Table 21 | iin natgiay Pan, ee . M—Table 2! Gavemnmein Gamat Ei Pan 1 Secon n= Table 2 nab ss ona ined Ti sec Reson or Borrower’ venir nw |" ~ Fe 24 PMISTORICAT CONTRACT AON PERFORMANCE: istry of rorpevforming comics J {in Table 2.2 Teng Ligation Parc, Secitow (M1 Table 22 A VINANGIAL SITUATION is Baie Secon TM Toble 23 _ fa sane 2s nine Resor a 1, Saxton . Mr Tible 2s Penta Fenciltsperionse| Table 24 eimai — Sastry Yes vex Yes The Tenderer hag présenied aroanil 10) 2010 Allo remare smal crac th 2MEUR Te Bocca ol he ‘ars Mania ‘No information pit abo the lst § years 2011, 2012, 2015 elon th thi entero bees he Tenderer No one of ig eunnaes presen ei bs | | | No elation has oon quest n | sso wer ete { criti 29 oO setion Faster) Vara, fared ks Pair | Secon 1 Table > ey he coma lated the vortntion of Annas Mos Sweet tw Bevaya Suet ad the ers wih Dewy Sit witha aiaion oF § mths tanta valuc of 1967.71 TDR, cniaining the illowing works: rchabiital ian oF as (Gf sgn replicon of water pels, ainwater dria syle, soe ighing sal reeansoueton of median vslage eles, could bs hardly considered 35 Similar withthe present projec By vorticaion the Fils of acisity a pr she company regis dace, resuled hat he company is ot mth eRQuIPMENT ntrctor's Equipment Bart Section iTable 28 [ronnie RnQUREMENTS SO 900-2008 mr “Pan 1, Sesion t= Table 27 io GOT HOT rT “The Tenderers conserved as wot qualfed for the award af a conten, The Tulse dl sot mtity hy Fllowings rnioinun eterna expresaly pentined in the ender daeuments: "The Tenderer shall dempasiat hat igs sess ‘eepriene pin eontmcor inthe exseat lat Least three 3) projeets of «aotre aril conplexity soimpurse to the proposal comract within the hast Five (S} years in avon Ie allowing pectic exporcnce {Gi wan road rehabitition/medennaion (i) insseer thing modersiza ion pgridioy i i | FORMER (4) Postqualitication Pact Chisinau Urban Ro Setar Project Comat ehabltatin of tetsu fotays vor, ease of facies nt i trading o sree ihtng (Package) Fenkeos 4, SIGHS PASTROW ASE (algun i Qualifying let in Satistectony | ate Tae vo N Rens ! power : ey = - ee - sR RE" LR ag i | connetorine Means | YS ' ak AG Taal Seton [yg ‘ tale aor OWT Pi, Secon | - ; “ Met _ i ray Ton 15 i Nats wr |Seton | yg i Mlnortananreconny ne} e2 | AON PERFORMANCE ' Tisha wvpefsning eas ' egg ——— | ' (TARANEAT SATION TP t Higuocal Fasc atinnance~ | Yan Sebo : fais : mstae23 : a Sector i me vyens |S _ : | a 7 Yes i a eT i ; sini exons f * Saturing ox Sun sr —ston : Simesnwst sas ow Ch i stash aD) tyes, i ae |, Seon ttl aru ef eunat 26 ; Metaheat2 | No MEU te 3 MEU ae | mabe La trv acc he ene ' + thn norway Onova Burgas? scetiom LOT Fl—2 yoars, t sont } + Koyogign Mari Laie ha <4 i fe | : a * Rest ano ihe Tow Pak oats MER + 54039 Rehpilation and weit or 68 Penile Sirians 2 moat, MEU, | BGI6IPO o017.1-012007 2 mows, 146 MEL + 1ot 31 Rou 111-1KDI 2 ots 12 MEU, * tect ston a he Rol Fein Tar Prosi Agee the Waste Rows (raves anil iow of Copentupen sia) Wontevar = oniis, 2.3 MEUR ‘works andthe dation af cama oy 2 romaets{ Salle ing ad oath ae sation "Sincenosso shoos” and “Taki rotary Ora jars, steal oF 3 feontracts a required as ia Part Employers Reguieorents, veut be onsen sina Mureover, the eontcis presemie do nae oni ar tnolermanion Thins, ‘works rele 10 J opqrating of public Person Having in view the valves, the me : Conirtors sant J Pa 7, Seton tee 28 [6 EQUIPMENT ‘Contrctor's Equant ‘a1, Sti It —iabte 26 7 OTTER REQIAREMENTS Tan ‘The Tenderer fs considered a5 nat quate for the award! nF a eautract. "The Teadere de uot sts the flaws “Specie Experience’ expressly Imensione inthe tender devumeas:(Factar 24 Expeviensed SubFachrs 24.2 8 2.43 (1) Panieipmio 48 contractor oF magagement eamractor i at fest Thre (3) contracts within the last Fv) yearn, tha hive been successfully and substantially completed and that are similar to the propose Works. ‘he simian shal bee tunel on The plysial siz, complexity, methadsischology ur ker ehaeictristice as deseried ia Pan 3 = Employer's Regieenents, (by Forthe above or her enntracis executed during the evi stipulated in 2.4242) above, anim eaperienee inthe following key activites: smovenization unseating () sebgar road rehasittion modernization Ci) oot yhting = FORM 8 (6) Postqualitication Preyer: Chisinau Urban Rod Seetor Prajet ona Aehatitiation of streets Sonneays network, estashonent of on-strcet park rang, af sires ighting (Package 1 Tenens: 6 SC DELTA AEM--98 88, (Romania) uafying Reto Sutistietry hte Tends Yer No acum Gontct of mterest Pari 1, Seaiion M—-Table 2.1 Parl 1, Section | Table 2.1 | Goverment Gwnad Entity Parl 1, Seaton Table 2, Bani iniity | | Resolution of Borrower's country aw [2 HISTORICAL CONTRACT NOW- PERFORMANCE Fistory of nonpartanning contacts 17, Soclion l= Tabla 2.2 Pending Uhigation [Pai 7, Socion 3 FINANGIAL SITUATION ‘Average Ar Yow ft table |X Finandlal ResoUresS Pari, Soction 9 _\m=tabieas | Y* ) EXPERIENCE = General Experionca fart, Soatton | S ldnisled howunann " tees | Yes (°) (detailed hereunder) Spas wipaieics ant, Salon | yo | fe tase | Yes ] -€) {detailed hore-under) [SPersonnel CL ~ 7 TT ‘Contractor's Personnel Par, Secon W-Tabie2s | %* | (PENT — Table 26 j 180 90012008 or similar 2005 oF similar [is 1400 (>): Pspeiones “The evaluation af te “Experience” is dane eeontingly to the Verde Docuanes sol rainy sume by i “Ta sil the folowing ania evs as expres nse te ender doce (ctr 24 Bypurience Sat Fuciore 24.28 2.4.3 Specific Pepecince {a Bareiption as conteveanr or manager! contractor im atleast Thre (3) contracts within the fast Five} yes. ta fave Ben secesesfily and substantiate camped oad tha are sna so the prowsid Maks. The sitar salt de based on the plyscat size, ccmplecyy, wethadserdwologs oF ather cheracteriaes as described in Part 3» Boyplover’s Requvemens (hi) Rar the who or other contracts escent aur dhe period spaced in 24.20) above, a mains espaicnce ia the following hey ects: () wrbon road cchabianion ¢ wmaderntiaion (9 street fighting naerwiononhgrading > The elon aresonts in his wer Nine (9 experieness with range ot he i Ena Hho 2.9 Mo 38,8 ME, > One experiences presente and iken in comsderainn for the evaluation “The tw (following experiences ae ne considanc As ina in res of he size whic ss: “cionsetion wok, Noaaaton and stave eos ia seer a 2,50) ‘Rehabiliation ad rernsatinn of eeanty roa P63 A, Conny @POW" £2 MEY ~The fou (2) following experiences ane considered as sin in regal f sieTnatre “Desig and built Rebubitation of Urban Roals in Bucatest"¢H1 AME) “ehabliaion and nation af county sued B) S61" (AME) ‘Rai stein eshablitaion a Mverrzaion sn Craiova Manip (design al execution) (25M) ‘ebilation of DN 56" 35.8M6) ‘Tho two 2) following experonees ave ol bull sive of similar experience, sa ibise expetience are ant considered as salar in regards of the size: however. those experiences are canslered A expevienee fie ‘ne sia pas oe seope a works rege in che Tender Documents Repairs. cehabiiation and modernization of srt network, expansion oF water mad sewerage newerk, pumping stations executions in Liana” (6,5ME) t “Lane iui Park development (Assign al exeeution) (6048) i Pity the exporionees presented ihe Tenderer is considered as able to peform the tequirements of the ‘Tener i ‘Doewncns forthe “Unban Road! Rehabilitaian/Moerisation”. > Aud the “Siret lighting madertzaiontupading is evelopes in he experience “Lune Sai Par development [design + excomion)” (6 ME), and the experiance "Stes nctwork i iv (65 MO, which snclades works elected power supply as tobe considered ‘The Tenderer is considered as qualified for the wvard ofa cantract t } { t { i ANNEX 1 Contract Data Sheet Project Chisinau Urban Road Sector Project Contact: Rebebillation of streais and foolways nolwork, eslablishinont of on-street parking Jacitios and upgrading of streat lighting (Package: 1) Estimated contract value (euro' equivalent) Contract ype: Works Contract Procurement ype GPM [doto}-4.08.2013 Tenclers invited ete 9.12.2013 Number of documents sold: 23 Tenders received dat}: 12.02.2014 Number of tenders rceived: 6 Tender evaluation repor (date: 08.2014 Namo, address and nationality of suscessul tenderer! SC DELTA ACM ~ @3 SRL (Romania) Contrect value at award: 11,571,475.68 (Including Provisional Suns end Contingencies), without VAT ‘Tender currency: EUR cour! equivatant: Nin Reto: NA Contract aware [detl: April 2044 Contract completion [date}: April 2015, " mendes as pas of Comigenlany No, 1, date 17 February 1999 10 gs

You might also like