and a larger tubing string was installed to allow for increased production rates.
The Sidi El Kilani Oil Field development
during 1993 with production start up from
and 3-D seismic will be acquired over the
ther development drilling is planned late
1994.
will continue
existing wells
structure. Fur1993 or early
During 1992 Enterprise Tunisienne D' Activities Petroleum (ET AP) exercised its contractual option to participate in the development and exploitation of the Sidi
EI Kilani Oil Field.
100 km of new seismic data was acquired and one exploration well was drilled. This encountered good reservoirs which, however, were water bearing and the
well was abandoned.