Oil manifold and tank battery at Sidi EI Kilani oil field

!(f

Tun/SIB

.J
~

)
ALGERIA!

TUNISIA

l,\
\

~\
\

Vibroseis survey

if)

\\

LIBYA

Sidi EI Kilani field in Tunisia

The production for 1992 was 0.25 mmsrb equivalent [0


an average daily rate of 694 stb/d. Whilst awaiting installation of permanent production facilities and a pipeline, field production will continue utilizing the temporary facilities and trucking. Production is scheduled
to commence in January 1993 at a planned rate of 6,800
stb/d for the year.
During the year the second appraisal well SLK-3 was
successfully
completed.
Two
further
appraisal!
development wells were drilled and SLK-2 was reentered. The SLK-4 well was completed as a production
well and produced oil at 8,600 stb/d on a I Iii' size
choke. The SLK-2 well was re-entered and drilled
through the Abiod reservoir but failed to produce hydrocarbons during testing. The SLK-5 well was drilled to
appraise the north of the field and encountered nonreservoir in the Abiod formation and no testing operations were conducted. The SLK-l well was worked over

and a larger tubing string was installed to allow for increased production rates.
The Sidi El Kilani Oil Field development
during 1993 with production start up from
and 3-D seismic will be acquired over the
ther development drilling is planned late
1994.

will continue
existing wells
structure. Fur1993 or early

During 1992 Enterprise Tunisienne D' Activities Petroleum (ET AP) exercised its contractual option to participate in the development and exploitation of the Sidi
EI Kilani Oil Field.

100 km of new seismic data was acquired and one exploration well was drilled. This encountered good reservoirs which, however, were water bearing and the
well was abandoned.