You are on page 1of 5
Cn eset agasants anon Saudi Electricity Company POST-BID CLARIFICATION NO. 14 LAI A TO BIDDI Name of Bidder: ALKIFAH Date 16 Sep. 15, RFx No. 400004031, Title EPC BUILDINGS FOR 1600 MW TO 1980MW COMBINED CYCLE POWER PLANT AT PP-14 IN RIYADH, KSA ‘COMPLIANCE STATEMENT: 2 MPLIBNCE $1 rent that the Bk submited isin fll compliance with COMPANY's [SEC] Scope o Wo Tater Technical Specifications of the Project, Bidder shal cnt dere wssued By SEC, except forthe “Technical & Commercial Comments / arrestor 1 Deviations / Exceptions / Variation 2s | Catia cin hs Bid, which sal be discussed and agreed upon in the Technical Ciatteston Meetings between the Bidder and COMPANY (SEC), duly mentions cient documents, addenda , amendments, correspondences, Further, Blades requ confirm that any other Deviations or | ceptions identifed or detected prior to or during the execution of he ‘Contract for the Works will be corrected by the Bidder/Contractor to comply with Exc eof te Bidding DocumentsiContract Documents without any adcitonal costo Company for the Works and without any delay in the | execution of the Project Bidder shal confirm that the Clarifications / Deviations / Exceptions/Variation 2s diy discussed and agreed | * Bidder technical proposal, any deviations on the Scope of Work 8 "Tender Technical Specifications of the Pr | technical proposal or any hidden oviations not being discussed and not agreed upon in this Technical Clarif ceo ANY (BEC), oF arly Deviations submited after the submission of Technical Preposal othe COMPANY | Bid may be rejected. | «Bidder shall confirm thatthe proposed drawings 28 ‘enclosed in the bidder technical proposal, are conceptual drawing for describing the Bidder's Bidde' sl proposal and considered for tendering purposes only, these drawings shale ‘subject to company/Engineer review ‘and approval by Company | Engineers curing detailed engineering stage and comply with the Scope of Work & Tender Technical Specifications of the Project, Bidder shall confirm that all proposed project equipment vendors have been Bre and approved by company and included in Company TP aby proposed equipment or material, in the bidder's technical posal, not selected rom Compal Vendor Li tae Mere not ineluded in Company AVL, bidder shall refer to the General Instruction of Company ‘Approved Ven’ eunder, are the only Deviations in the mentioned elsewhere in the Bidder’s ion Meetings between the Bidder and all not be considered and the Technical —— Bidder shall confirm that all proposed project sub-contractors have been pre-qualified ane approved by company. Any proposed sub-con! Biddetg rem Company Approved Subcontractor List (ASL) shall nat be considered, however, for new Subcontractor not included in Cor | Bigger shal refer to the General Instruction of Company Approved Subcontractor List, TON MEETING - GENERAL) (EPC Buildings for PPI4) S etuestt pages as pnt) ‘Saul Electricity Company Cl Resolution sston/comment | Answer BIDDER Response 16 September 2015 Meeting | SEC Qui | | i AL-Kifah Confirmed that the HCIS | | Coordina ‘Scope and will - Contirmea | ©mply with the requirement. | Item Closed | Hcts coordination shalt be in the scope of al kitah. Please confirm, ost-Bid Clarification No, (EPC Buildings for PP14) ATION NO. FI Cs stat asapautt acon ‘Saudi Electricity Company JESTION: 5 Pricing Attachment 1, Annexure B BUILDING (USH) Storage (Including Shelvin Racking System, Hazardous Goods Store, etc) Section 4.2.3.F CHEMICAL STORAGE BUILDING (USH2) An Storage (Including Shelving, Racking System, Hazardous Goods Store, etc)Included in Section 4.2.3.6 WAREHOUSE | the Scope Section 4.2.3.6 BOILER TUBE STORAGE BUILDING oy Confirmed (usH1) j. Storage (Including Shelving, Racking System, Hazardous Goods Store, etc) The price against the above items are shows “N/A”. This Bidder shall confirm that the above items are part of their Scope and Price is “Included” elsewhere in the total Bid Price. AL-Kifah confirmed that these items are part of their Scope and the price is included in the Total Contract Price. ‘The Price Column shall denote “Included” Item Closed. Post-Bid Clarification No. [4 (CLOSE OUT CLARIFICATION MEETING - GENERAL) (EPC Buildings for PPI4) S stanest Ayagautt as par Saudi Electricity Company COMPANY is providing CAR insurance to all onsite CONTRACTORS under their | OcIP Program therefore CONTRACTOR is not required to | Provide CAR (All Risk) insurance | Schedule 8, Insurance Clause will be revised to include the New Insurance clause. planks CONTRACTOR is required to a eae enrol into the OCIP program | and is responsible for all other Item Closed, insurances under the revised Insurance Clause. CONTRACTOR’s temporary facilities (Camp etc.) are not | Covered under OCIP program Its noted that the Price has hen Al-Kifah revised the Price Breakdown | Company requires the price bella la + | Prcino Attachment 1‘and._| brasksownr inne tete seray - Item Closed Annexure B engineering value of between - ifah fully aware of the revised rance requirement and comply ith it, 5-7% maximum of the total | contract price. 5. Schedule Post-Bid Clarification No M4 (CLOSE OI (EPC Buildings for PP1ay UT CLARIFICATION MEETING OFNET RAL) _ a SS Page d <> ATTACHMENT “II” Di aeY Bea ser ae es Saudi Blectrisny Comnany. CONTRACT NO. 2000000000x RFX NO. 4000040312 EQUIPMENT activiry START DATE | INSTALLACCESS | FINISH DATE DATES Pi P14 Contract Signing : — Mobilization l4-Noveis Central contro! Building 15-Nov-15, 25-Apr-16, 16-Jul-16 | Electrical Bulding Block 20 1S-Nov-15 24-Feb-16 HRSG Electrical building Block 20 8-Dee-15 6-Feb-16 6-Apr-16 Fuel Gas compressor Electrical building 8-Dee-15 1-Feb-16 9-Mar-16 Electrical Building Block 10 22-Dee-15 4Apr16 22-Jun-16 HRSG Electrical building Block 10 22-Dec-15 29-Feb-16, 20-Apr-16, } STG Electrical building Block 20 20-Feb-16 21-May-16 2i-Jun-16 STG Electrical bulding Block 10 22-Mar-16 20-Jun-16 22-lul-16 Annex Bulding Block 10 1Jun-16 31-Aug-16 Annex Bullaing Block 20 Jun-16 31-Aug-16 [centre contra Butang parking Shenae TreMay-15 a 18-Jun-15 Covered Storage Shelters 1assep-16 \4-Dec-16 Warehouse 1-Sep-16 S-Mar-17 | Chemist storage Bulging 1-Sep-16 2-Mar-17 Boiler tube storage building 1-Sep-16 30-Nov-16 Werehouse yard and Securty Gatehouse 3-Jan-17 S-Mar17 Technical competion S-Mar17 S-Mar17 | Preliminary Acceptance ‘S-Mar-17, ‘S-Apr-17, | Final Acceptance i (6-Apr-17 7-May-17 Demebilzation | $-Mar-I7 Bee Bn Ti) ne PAGE 10F 1 ‘Schedule B Atachment 1 Industrial Buldings Critical Milestone Dates (PPTA) setbihtidllibia sree eer ed

You might also like