You are on page 1of 2

Decription of Items of Work No

Earthwork in excavation in Foundation.


Lime concrete in Foundation
1st footing
2nd footing
Plinth wall upto G.L
Plinth wall above G.L

length
1
1
1
1
1
1

6
6
6
6
6
6

Breadth
Height/Depth
0.8
0.9
0.8
0.3
0.6
0.2
0.5
0.2
0.4
0.2
0.4
0.6

Quantities Total Quantities


4.32
4.32
1.44
1.44
0.72
3.24
0.6
0.48
1.44

You might also like