SHOP DRAWING SUBMISSIONS

SUPERMALL MANSION
A

.....
B

STRUCTURE
Ref. No:

Date

Handed to

25 August 2014

No Transmittal :

........../1/SD-PPSUPERMALL/III/2014/MALL/RAMP#14

Herewith we submit drawing as follow :

NO
1
2
3
4
5
6
7
8
9
10
11
12

DRAWING TITLE

DRAWING NUMBER

STATUS

QSHE/CO5/AH/S-179A / R0
QSHE/CO5/AH/S-179B / R0
QSHE/CO5/AH/S-179C / R0
QSHE/CO5/AH/S-179D / R0
QSHE/CO5/AH/S-179E / R0

DENAH RAMP #15 BASEMENT 3, 2


DENAH RAMP #15 BASEMENT 1, LOWER GROUND
POTONGAN A (PARSIAL 1 & 2)
POTONGAN B, C, D
DETAIL DENAH GUTTER 1, 2, DETAIL GUTTER 1, 2
DETAIL PENULANGAN BALOK, DETAIL PENULANGAN SR18
DETAIL A, B, C, POTONGAN RAMP, DETAIL PENULANGAN
BALOK RAMP
DENAH KOORDINAT RAMP @15 BASEMENT 3, 2
DENAH KOORDINAT RAMP @15 BASEMENT 1, LOWER GROUND
DENAH KOMPOSIT RAMP #15 BASEMENT 3
DENAH KOMPOSIT RAMP #15 BASEMENT 2
DENAH KOMPOSIT RAMP #15 BASEMENT 1
DENAH KOMPOSIT RAMP #15 LOWER GROUND

QSHE/CO5/AH/S-179F / R0
QSHE/CO5/AH/S-179G / R0
QSHE/CO5/AH/S-179H / R0
QSHE/CO5/AH/S-179I / R0
QSHE/CO5/AH/S-179J / R0
QSHE/CO5/AH/S-179K / R0
QSHE/CO5/AH/S-179L / R0

Purpose
Approval

Comment

Review

Action

As Requested

Submitted by
:
PT. PP (Persero) Tbk.

Received by :
PT. Jaya CM

Project Manager

Construction Manager

Reply / Comment :

APPROVED

APPROVED

With Comment

CHECKED BY CONSULTANT

AA

Date :

HRT

Date :

HPM

Date :

NOT APPROVED
Revise & Resubmit

REJECTED

APPROVED BY PT JAYA CM

ACKNOWLEDGE BY PT PAKUWON PERMAI

Construction Manager :

Owner :

Date :

Date :

SHOP DRAWING SUBMISSIONS

SUPERMALL MANSION
A

.....
B

STRUCTURE
Ref. No:

Date

Handed to

8 October 2014

No Transmittal :

........../1/SD-PPSUPERMALL/X/2014/RITZ/PONDASI

Herewith we submit drawing as follow :

NO

DRAWING TITLE

DENAH STRUKTUR PONDASI RITZ

2
3
4

DENAH PONDASI RITZ


DENAH BALOK RAFT RITZ (Elv.-11.500)
POTONGAN A (PARSIAL A, B, C)

5
6

POTONGAN B (PARSIAL A, B)
POTONGAN B (PARSIAL C)

POTONGAN C (PARSIAL A, B)

8
9
10

POTONGAN C (PARSIAL C) POTONGAN D


POTONGAN E, F
DETAIL PONDASI TC.05, DETAIL SPUN PILE
POTONGAN SPUN PILE, DETAIL A
DENAH KOLOM & SHEARWALL RITZ

11

DRAWING NUMBER

STATUS

QSHE/CO5/AH/S-182A (R0)
QSHE/CO5/AH/S-182A' (R0)
QSHE/CO5/AH/S-182A'' (R0)
QSHE/CO5/AH/S-182B (R1)
QSHE/CO5/AH/S-182C (R0)
QSHE/CO5/AH/S-182D (R0)
QSHE/CO5/AH/S-182E (R0)
QSHE/CO5/AH/S-182F (R0)
QSHE/CO5/AH/S-182G (R1)
QSHE/CO5/AH/S-182H (R1)
QSHE/CO5/AH/S-182I (R1)
QSHE/CO5/AH/S-182J (R1)

12
13

TABEL PENULANGAN KOLOM


DENAH ELEVASI PONDASI RITZ, DETAIL KAKI AYAM
DETAIL PEMASANGAN KAKI AYAM

14
15
16
17
18
19
20

JOIN SHEARWALL PILE CAP, POTONGAN SHEARWALL


DETAIL STRUKTUR UNTUK KOLOM
DENAH KOMPOSIT STRUKTUR & ARSITEKTUR
POTONGAN A (PARSIAL A, B, C)
POTONGAN C (PARSIAL C) POTONGAN D
POTONGAN E, F
DETAIL SPUN PILE, POT 01, DETAIL A, DETAIL TC.05
DENAH KOLOM RITZ

21
22
23

DETAIL PENULANGAN KOLOM


DENAH ELEVASI PONDASI RITZ
DENAH KOMPOSIT RITZ

24

DENAH KOMPOSIT RAMP #14 B.2

QSHE/CO5/AH/S-182K (R1)
QSHE/CO5/AH/S-1820K' (R1)
QSHE/CO5/AH/S-182L (R0)
QSHE/CO5/AH/S-182B (R0)
QSHE/CO5/AH/S-182F (R0)
QSHE/CO5/AH/S-182G (R0)

(LAMPIRAN)
(LAMPIRAN)
(LAMPIRAN)
(LAMPIRAN)
(LAMPIRAN)
(LAMPIRAN)
(LAMPIRAN)
(LAMPIRAN)
(LAMPIRAN)

QSHE/CO5/AH/S-182H (R0)
QSHE/CO5/AH/S-182I (R0)
QSHE/CO5/AH/S-182J (R0)
QSHE/CO5/AH/S-182K (R0)
QSHE/CO5/AH/S-182L (R0)
QSHE/CO5/AH/S-175D (R0)

Purpose
v

Approval

Comment

Review

Action

Submitted by
:
PT. PP (Persero) Tbk.

As Requested

Received by :
PT. Jaya CM

Ir. Yudi Asta


Project Manager

Ir. Julianta Leonard S


Construction Manager

Reply / Comment :

APPROVED

APPROVED

With Comment

CHECKED BY CONSULTANT

AA

HRT

HPM

NOT APPROVED
Revise & Resubmit

REJECTED

APPROVED BY PT JAYA CM

ACKNOWLEDGE BY PT PAKUWON PERMAI

Construction Manager :

Owner :

SHOP DRAWING SUBMISSIONS

SUPERMALL MANSION
A

STRUCTURE
Ref. No:
Handed to

Date

8 October 2014

No Transmittal :
Date :

........../1/SD-PPSUPERMALL/X/2014/RITZ/PONDASI

Date :

Date :

Date :

Date :

.....
B

SHOP DRAWING SUBMISSIONS

SUPERMALL MANSION
A

.....
B

STRUCTURE
Ref. No:

Date

Handed to

30 September 2014

No Transmittal :

........../1/SD-PPSUPERMALL/VIIII/2014/MALL/B.1

Herewith we submit drawing as follow :

NO

DRAWING TITLE

DRAWING NUMBER

DENAH KOMPOSIT STRUKTUR ARSITEK LANTAI B.1

DENAH STRUKTUR LANTAI B.1

QSHE/CO5/AH/S-188 (R0)
QSHE/CO5/AH/S-188A (R0)

3
4
5

DENAH BALOK LANTAI BASEMENT 1


DENAH PEMBESIAN BALOK LANTAI BASEMENT 1
DENAH PEMBESIAN BALOK LANTAI B.1 (ARAH X)

QSHE/CO5/AH/S-188C (R0)
QSHE/CO5/AH/S-188D (R0)

6
7

DENAH PEMBESIAN BALOK LANTAI B.1 (ARAH Y)


DENAH KOLOM & BASEMENTWALL LANTAI BASEMENT 1

8
9
10

DETAIL DENAH RAMP (AREA PARSIAL 02)


POTONGAN A, B
POTONGAN C, D

11
12
13
14
15
16
17
18

POTONGAN E, F
POTONGAN G, (PARSIAL A)
POTONGAN G, (PARSIAL B)
POTONGAN H, (PARSIAL-A)
POTONGAN H, (PARSIAL-B)
POTONGAN AH, I, J, DETAIL A, B, C, DETAIL W200
DETAL SLAB TYPE S12, S12A, S15& CS15
DETAIL PENULANGAN BALOK

19
20
21

DETAIL KOLOM, DETAIL BW300(3) & BW300(4)


DETAIL PERSFEKTIF 1, 2
DENAH DIMENSI RAMP

STATUS

QSHE/CO5/AH/S-188B (R0)

QSHE/CO5/AH/S-188E (R0)
QSHE/CO5/AH/S-188F (R0)
QSHE/CO5/AH/S-188G (R0)
QSHE/CO5/AH/S-188H (R0)
QSHE/CO5/AH/S-188I (R0)
QSHE/CO5/AH/S-188J (R0)
QSHE/CO5/AH/S-188K (R0)
QSHE/CO5/AH/S-188L (R0)
QSHE/CO5/AH/S-188M (R0)
QSHE/CO5/AH/S-188N (R0)
QSHE/CO5/AH/S-188O (R0)
QSHE/CO5/AH/S-188P (R0)
QSHE/CO5/AH/S-188Q (R0)
QSHE/CO5/AH/S-188R (R0)
QSHE/CO5/AH/S-188S (R0)
QSHE/CO5/AH/S-188T (R0)

Purpose
v

Approval

Comment

Review

Action

Submitted by
:
PT. PP (Persero) Tbk.

As Requested

Received by :
PT. Jaya CM

Ir. Yudi Asta


Project Manager

Ir. Isnanto
Construction Manager

Reply / Comment :

APPROVED

APPROVED

With Comment

CHECKED BY CONSULTANT

AA

Date :

HRT

Date :

HPM

Date :

NOT APPROVED
Revise & Resubmit

REJECTED

APPROVED BY PT JAYA CM

ACKNOWLEDGE BY PT PAKUWON PERMAI

Construction Manager :

Owner :

Date :

Date :

SHOP DRAWING SUBMISSIONS

SUPERMALL MANSION
A

420.A
B

STRUCTURE
Ref. No :

Date

Handed to

No Transmittal

28 Maret 2016

PT. JAYA CM

/1/AB-PPSUPERMALL/X/2016/PHASE 2A/RAMP 12 PENAMBAHAN PLAT DAN BALOK DI LEVEL +4.000

Herewith we submit drawing as follow :

NO
1

DRAWING TITLE

DRAWING NUMBER

MALL PHASE 2A

QSHE/C05/AH/S/403

STATUS

(R1)

RAMP 12 PENAMBAHAN PLAT DAN BALOK DI LEVEL +4.000


DENAH STRUKTUR RAMP 12 LT.LG
DENAH STRUKTUR RAMP 12 +2.800

MALL PHASE 2A
RAMP 12 PENAMBAHAN PLAT DAN BALOK DI LEVEL +4.000
POTONGAN B

QSHE/C05/AH/S/403A

(R1)

QSHE/C05/AH/S/403B

(R1)

POTONGAN C

MALL PHASE 2A
RAMP 12 PENAMBAHAN PLAT DAN BALOK DI LEVEL +4.000
POTONGAN A
DETAIL BALOK DAN PEMBESIAN PLAT

Purpose
Approval

Comment

Review

Action

As Requested

Submitted by
:
PT. PP (Persero) Tbk.

Received by :
PT. Jaya CM

Ir. Yudi Asta


Project Manager

Ir. Julianta Leonard S


Construction Manager

Reply / Comment :

APPROVED

APPROVED

With Comment

CHECKED BY CONSULTANT

AA

Date :

HRT

Date :

HPM

Date :

NOT APPROVED
Revise & Resubmit

REJECTED

APPROVED BY PT JAYA CM

ACKNOWLEDGE BY PT PAKUWON PERMAI

Construction Manager :

Owner :

Date :

Date :