Professional Documents
Culture Documents
7272 1 PDF
7272 1 PDF
7272 1 PDF
(Reaffirmed 2005)
Edition 1.1
(1979-02)
Indian Standard
RECOMMENDATION FOR LABOUR OUTPUT
CONSTANTS FOR BUILDING WORK
PART I
NORTH ZONE
UDC
BIS 2006
BUREAU
OF
INDIAN
STANDARDS
Price Group 3
Indian Standard
RECOMMENDATION FOR LABOUR OUTPUT
CONSTANTS FOR BUILDING WORK
PART I
NORTH ZONE
Representing
Central Public Works Department, New Delhi
Members
SHRI D. N. CHOPRA
SHRI M. N. DASTUR
SHRI P. P. DHARWADHKAR
Members
Builders Association of India, Bombay
SHRI B. V. APTE
SHRI K. K. MADHOK ( Alternate )
SHRI D. R. BAHL
Institution of Surveyor, New Delhi
SHRI P. P. DHARWADAKAR
National Buildings Construction Corporation, New
Delhi
MES Builders Association of India, Delhi
SHRI MUNISH GUPTA
SHRI T. C. GOYALA ( Alternate )
SHRI S. K. KOGEKAR
National Buildings Organizations, New Delhi
SHRI M. R. RAO ( Alternate )
SHRI O. P. KUMAR, SSW
Engineer-in-Chiefs Branch (Ministry of Defence)
SHRI R. S. MURTHY, SSW ( Alternate )
SHRI T. R. MEHANDRU
The Association of Consulting Engineers (India), New
Delhi
National Projects Construction Corporation Ltd, New
SHRI S. RAMACHANDRAN
Delhi
SHRI S. K. MOORTHY ( Alternate )
SHRI T. S. NARAYANA RAO
In personal capacity ( 93, Aruna East Road,
Basavangudi, Bangalore 14 )
Delhi Productivity Council, New Delhi
SHRI K. G. SALVI
SHRI J. S. SHARMA
Central Building Research Institute (CSIR), Roorkee
SHRI S. P. SINGH ( Alternate )
SURVEYOR OF WORKS I (NDZ)
Central Public Works Department
Indian Standard
RECOMMENDATION FOR LABOUR OUTPUT
CONSTANTS FOR BUILDING WORK
PART I
NORTH ZONE
0. F O R E W O R D
0.1 This Indian Standard (Part I) was adopted by the Indian
Standards Institution on 15 March 1974, after the draft finalized by
the Planning and Organization at Site Sectional Committee had been
approved by the Civil Engineering Division Council.
0.2 Schedule of rates form the basis for preparing the detailed estimates
for works. These are also very useful in considering the reasonableness of
the tenders received from the contractors and for pricing the alterations,
additions, omission and substitutions in a contract. It is, therefore,
necessary that the schedule of rates should be prepared correctly and be
based on rationally stipulated material and labour constants.
0.3 At present different departments at a place are having their own
schedule of rates. A comparison of the labour and material constants
used for different items of work in these schedules of rates has
indicated that there is a good variation in them and due to which
different rates exist in various departments for the same items of work
in the same locality. This standard is being issued in order to
rationalize the labour output constants for different building works.
0.4 The labour constants have been arrived at by the Central Building
Research Institute, Roorkee by taking actual observations, using work
measurement techniques, on the construction sites at Delhi and Roorkee.
Different types of building works up to 10 m height of CPWD, MES and
other organizations were included where the workers from neighbouring
states were working. Sufficient number of observations to ensure a
confidence limit of 95 percent and an accuracy of 5 percent were taken.
The relaxation allowance for the time required for rest to overcome
physical fatigue and working condition allowance has been taken as per
the standardized values given for Indian conditions by the Ministry of
Labour, Employment and Rehabilitation, Government of India. Other
allowances, such as organizations, incidental holdups, ineffective time
arising out of preparatory work and additional weightage for small size
works have been arrived at by the activity sampling studies and mutual
agreement at the committee meetings by the members representing the
construction departments and the builders association.
3
SL
NO .
DESCRIPTION OF WORK
UNIT
LABOUR
(1)
(2)
(3)
(4)
(5)
(6)
m3
Mate
Mazdoor
0.06
0.62
m3
Mate
Mazdoor
0.05
0.50
RECOMMENDED
REMARKS
CONSTANT IN DAYS
(8 WORKING HOURS)
( Continued )
*Rules for rounding off numerical values ( revised ).
(1)
DESCRIPTION OF WORK
(2)
c) Extra over item (a) for an additional depth of 1.5 m to 3 m
d) Extra over item (b) for an additional depth of 1.5 m to 3 m
e) Extra over items (a) and (b) for
every additional lead of 25 m
beyond one metre up to 250 m
and deposit to a level of 1.5 m
f) Returning,
filling
and
ramming of excavated earth in
layers not exceeding 20 cm in
depth, watering, well ramming
and levelling lead up to 25 m
ii) Concrete
a) Mixing by hand at banker, cement concrete (with 40 mm
graded coarse aggregate)
UNIT LABOUR
(3)
(4)
m3 Mate
Mazdoor
m3 Mate
Mazdoor
m3 Mate
Mazdoor
RECOMMENDED
CONSTANT IN
DAYS (8
WORKING
HOURS)
(5)
0.01
0.11
0.01
0.08
0.01
0.12
m3 Mate
Mazdoor
Bhisti
0.02
0.22
0.02
m3 Mazdoor
Bhisti
1.0
0.1
REMARKS
(6)
1.6
0.20
0.15
0.50
0.10
0.07
0.07
0.10
2.13
0.70
( Continued )
(1)
DESCRIPTION OF WORK
(2)
2) Mixer
mixed
concrete
UNIT LABOUR
(3)
cement m3
cement m3
RECOMMENDED
CONSTANT IN
DAYS (8
WORKING
HOURS)
(4)
(5)
Mason
0.10
Mazdoor
1.63
Bhisti
0.70
Mixer operator
0.07
Mixer
0.07
Vibrator
0.07
Mason
0.10
Mazdoor
2.65
Bhisti
0.80
Bullock with
0.15
driver
Mason
Mazdoor
Bhisti
Mason
Mazdoor
Bhisti
Mixer operator
Mixer
Vibrator
Mason
Mazdoor
Bhisti
Bullock with
driver
Mason
Mazdoor
Bhisti
Mixer operator
Mixer
Vibrator
REMARKS
(6)
0.17
2.33
0.80
0.17
1.83
0.80
0.07
0.07
0.07
0.17
2.85
0.80
0.15
0.17
2.00
0.90
0.07
0.07
0.07
The constants
for items (f) to
(m) include
mixing, pouring, consolidating and
curing. This
does not include
fair
finish
( Continued )
(1)
DESCRIPTION OF WORK
UNIT LABOUR
(2)
(3)
g) Reinforced cement concrete in m3
situ in suspended floors/roofs
excluding from w o r k, and
reinforcement
(4)
Mason
Mazdoor
Bhisti
Mixer
operator
Mixer
Vibrator
h) Reinforced cement concrete in m3 Mason
Mazdoor
situ in CHAJJAS up to 15 cm
Bhisti
in thickness excluding form
Mixer operator
work and reinforcement
Mixer
Vibrator
j) Reinforced cement concrete in m3 Mason
Mazdoor
situ in beams excluding form
Bhisti
work and reinforcement
Mixer operator
Mixer
Vibrator
k) Reinforced cement concrete in m3
situ in columns, pillars in
ground floor excluding form
work and reinforcement
RECOMMENDED
CONSTANT IN
DAYS (8
WORKING
HOURS)
REMARKS
(5)
0.24
2.50
0.90
0.07
0.07
0.07
(6)
0.30
3.50
0.90
0.10
0.10
0.10
0.20
3.00
0.90
0.07
0.07
0.07
Mason
Mazdoor
Bhisti
Mixer operator
Mixer
Vibrator
0.23
3.50
0.90
0.10
0.10
0.10
0.30
4.30
0.90
0.07
0.07
0.07
iii) Mortars
a) Mixing by hand, cement m3 Mazdoor
Bhisti
mortar of any mix/proportions
0.75
0.07
Labour
required will be
approximately
same
for
different mix
proportions
( Continued )
(1)
DESCRIPTION OF WORK
UNIT
LABOUR
RECOMMENDED
CONSTANT IN
DAYS (8
WORKING
HOURS)
REMARKS
(2)
(3)
(4)
(5)
(6)
1.33
0.10
0.33
Mazdoor
Bhisti
Bullock with
driver
Mason
Mazdoor
Bhisti
0.94
1.80
0.20
i) The
constants include
labour
involved
in
scaffolding
Mason
Mazdoor
Bhisti
0.25
0.40
0.10
Mason
Mazdoor
Bhisti
0.12
0.20
0.07
iii) L a b o u r
for
mixing mortar will be
extra
Mason
Mazdoor
Bhisti
1.80
1.80
0.20
Carpenter
Mazdoor
Carpenter
Mazdoor
Carpenter
Mazdoor
0.25
0.20
0.23
0.20
0.30
0.20
m2
( Continued )
DESCRIPTION OF WORK
UNIT
LABOUR
(1)
(2)
(3)
(4)
vi) Reinforcement
Bar reinforcement including Quintal Bar-bender
cutting to length, hooked ends,
Mazdoor
cranking or bending, hoisting
and placing in any position,
binding with binding wire and
holding firmly so as not to be
disturbed while placing and
ramming of concrete
vii) Plastering and Pointing
Mason
a) 15 mm thick cement plaster to m2
Mazdoor
ceiling including mixing of
Bhisti
mortar
Mason
b) 15 mm thick cement plaster on m2
Mazdoor
brick walls (exterior) includBhisti
ing mixing of mortar
Mason
c) 15 mm thick cement plaster on m2
Mazdoor
brick walls (exterior). Under
Bhisti
layer 10 mm cement sand
plaster and top layer 5 mm,
cement : Marble powder : stone
grit, including mixing
Mason
d) 15 mm thick cement plaster on m2
Mazdoor
brick walls (interior) including
Bhisti
mixing mortar
Mason
e) Struck pointing to brick work m2
Mazdoor
in cement mortar including
Bhisti
mixing mortar
Mason
f) Tuck pointing to random rub- m2
Mazdoor
ble masonry in cement mortar
Bhisti
including mixing mortar
viii) Paving and Floor Finish
a) Laying of PCC 40 mm thick in
alternate bays with side forms
and templates and finished
smooth
m2
Mason
Mazdoor
Bhisti
RECOMMENDED
CONSTANT IN
DAYS (8
WORKING
HOURS)
(5)
1.00
1.00
0.08
0.10
0.10
0.06
0.10
0.10
0.15
0.15
0.15
0.08
0.10
0.10
0.08
0.10
0.10
0.10
0.15
0.10
0.08
0.12
0.10
REMARKS
(6)
Labour
constants
for Bhisti
includes
labour for
curing.
Labour for
mixing
concrete for
items (a) to (e)
will be extra.
Labour
constants for
Bhisti
includes
labour for
curing.
( Continued )
SL
NO .
DESCRIPTION OF WORK
UNIT
(1)
(2)
b) Laying of PCC 25 mm thick in
alternate bays with side forms
and templates and finished
smooth
c) Laying of 40 mm thick in situ
terrazo flooring, under layer
30 mm thick cement concrete
and top layer of 10 mm thick
marble chips laid in cement
with dividing strips of glass,
metal or asbestos to form bays
including cutting, grinding
and polishing:
1) Laying
(3)
m2
2) Cutting, g r i n d i n g and
polishing
d) Laying of 20 mm thick in situ
terrazo skirting/dado underlayer 13 mm thick cement
plaster and top layer 7 mm
thick marble chips laid in
cement including rounding of
junctions with floor cutting,
grinding and polishing:
1) Laying
m2
2) Cutting, g r i n d i n g and
polishing
e) Precast terrazo tile flooring 20
mm thick laid over 10 mm
thick cement mortar:
1) Laying
m2
2) Cutting, g r i n d i n g and
polishing
m2
m2
m3
m2
LABOUR
RECOMMENDED
CONSTANT IN
DAYS (8
WORKING
HOURS)
(4)
(5)
Mason
0.07
Mazdoor
0.10
Bhisti
0.10
Mason
Mazdoor
Bhisti
Mazdoor
Machine
0.22
0.22
0.10
0.50
0.40
Mason
Mazdoor
Bhisti
Mazdoor
0.30
0.30
0.10
0.70
Mason
Mazdoor
Bhisti
Mazdoor
Machine
0.12
0.20
0.10
0.50
0.40
REMARKS
(6)
Labour for
mixing
concrete for
items (a) to (e)
will be extra.
Labour
constants
for Bhisti
includes
labour for
curing.
( Continued )
10
DESCRIPTION OF WORK
UNIT
LABOUR
RECOMMENDED REMARKS
CONSTANT IN
DAYS (8
WORKING
HOURS)
(5)
(6)
(1)
(2)
(3)
(4)
ix) Damp-proof Course
a) Laying damp-proof course 40 m2
Mason
0.10
mm thick cement concrete inMazdoor
0.10
cluding formwork and fair
Bhisti
0.01
finishing to edges and mixing
Mason
0.10
b) Laying damp-proof course 20 m2
Mazdoor
0.10
mm thick in cement mortar
Bhisti
0.01
integral water-proofing compound including mixing
x) Joinery
Carpenter
20.00
a) Door and window CHOKHATS m2
Mazdoor
2.00
coniferous and teak wood
wrought and rebated
Carpenter
0.90
b) Panelled/glazed joinery in m2
Mazdoor
0.10
coniferous and teak wood 30 to
40 mm thick framed with
panels or space left out for glass
or fixing of mesh wire (with tennoned joints)
c) Fixing of readymade shutters m2
Carpenter
0.25
to frames including fixing of
Mazdoor
0.25
fittings
xi) Glazing
Glazier
0.20
Fixing glass panes on steel or m2
Mazdoor
0.01
wood work bedded with putty
xii) Painting and Polishing
French polishing complete in- m2
Polisher
0.35
cluding a coat of wood filler on
new work
xiii) White Washing and Colour Washing (for Walls and Flat Ceilings)
Washer
0.02
a) White washing with lime 3 m2
Mazdoor
0.01
coats on new surface
Washer
0.03
b) Two coats of colour wash over m2
Mazdoor
0.01
an undercoat of white wash on
new work
Labour
constants for
Bhisti
includes
labour for
curing.
Items (a) to
(e) do not
include
labour for
erection of
scaffolding
and
dismantling
the same.
( Continued )
11
DESCRIPTION OF WORK
(1)
(2)
c) Distempering with dry distemper 3 coats on new surface
including a priming coat of
whiting
d) Cement based paint 2 or more
coats on new work (for each
coat)
e) Cement wash one coat on new
work
xiv) Terraced Roofing
a) 10 cm thick (average) mud
PHUSKA of clay mixed with
BHUSA at 8 kg per m3 of clay
on roofs laid to slope and
consolidated
b) 10 mm thick mud plaster and
GOBRI leeping with mud
GOBRI mortar over mud
PHUSKA
c) One layer of tile brick laid over
GOBRI leeping and grouted
with cement mortar including
mixing and finished neat
d) Lime concrete terracing comprising of lime, surkhi, brick
ballast 20 mm and down
average consolidated thickness
10 cm, finished with gur and
belgiri treatment complete:
1) Laying
2) Beating and finishing
RECOMMENDED REMARKS
CONSTANT IN
DAYS (8
WORKING
HOURS)
UNIT
LABOUR
(3)
m2
(4)
Painter
Mazdoor
(5)
0.08
0.04
m2
Painter
Mazdoor
Bhisti
Washer
0.15
0.01
0.10
0.02
m2
Mason
Mazdoor
Bhisti
0.01
0.20
0.01
m2
Mazdoor
0.01
m2
Mason
Mazdoor
Bhisti
0.12
0.15
0.10
m2
Mason
Mazdoor
Bhisti
Mazdoor
Bhisti
0.10
0.30
0.05
0.07
0.10
m2
m2
12
(6)
Items (a) to
(e) do not
include
labour for
erection of
scaffolding
and
dismantling
the same.
Date of Issue
February 1979
Eastern
Telegrams: Manaksanstha
(Common to all offices)
Telephone
323 76 17
323 38 41
337 84 99, 337 85 61
60 38 43
60 20 25
BANGALORE.
BHOPAL.
BHUBANESHWAR.
COIMBATORE.
Branches : AHMEDABAD.
FARIDABAD. GHAZIABAD. GUWAHATI. HYDERABAD. JAIPUR. KANPUR. LUCKNOW.
NAGPUR. NALAGARH. PATNA. PUNE. RAJKOT. THIRUVANANTHAPURAM.
VISHAKHAPATNAM