INSPECTION CHECKLIST

Project Code: IQ347-BAZYAN Combined Cycle Power Plant Project


Completion Area:

Checklist Document Name:


Lightning Protection

Completion System:

Checklist Document Number:


IQ347-300-EL-CHL-00036
Equipment Tag Description:

Equipment Taq #:
Taq Equipment Type:

No
1

Description of Item
Earth electrodes are located as per layout drawing.

Earth electrodes are connected properly to the main grid.

Inspection pits installed properly.

Connections are in accordance to the drawings.

Lightning air terminal location and installation is in accordance with drawing.

Earth tape and down conductors are installed as per the installation details.

Test clamps are fitted properly and disconnect facilities are functional.

All bounding to the metallic structures are in accordance with installation details
and layout drawings.
Test results recorded in IQ347-300-EL-CHL-00022.

OK

N/A

P/L

Remarks:

Name

Date

Signature

Owner / Owners Representative


ENKA QC

ENKA Construction