You are on page 1of 289
state of Kuwait saga te ‘Ministry of Health deat sis aa ins a Ministry of Health Hospital Expansion Plan (Expansion of Al Farwaniah Hospital) Ese hae 5 Cals 5 le juga y oli 5 preet ‘gli Atak Design, Construction, Equipment, Furniture and Operational Maintenance for the Expansion of Al Farwaniah Hospital 45-2014/2013/43/¢ & p/_,0:a8) sa)! Volume (3) alzall Document Ill-2- Particular Specifications Awa) cise gall :2-TTT staal (Division 2 - 3) STATE OF KUWAIT MINISTRY OF HEALTH HOSPITAL EXPANSION PLAN Pocument No, Document 0 Document Document i a na 13 Document i ma ms te ms me mrs m2 8 me m8 Design, Construction, Fauipmen, Fart and Operations ‘Maitenance or the Expansion of Farwaih Hospial (EXPANSION FOR FARWANIAH HOSPITAL) Contract No. 43/2013/2014-45 LIST OF CONTRACT DOCUMENTS. ‘Pescriaion Contract and Contractor's Declarations Tendering Procedure ‘Condon of Conrat {gal Clauses and Conditions 1871; danuary 2003 Revised Eaton Partoar Conalions of Contact ‘Kowa Tenors Law (Tobe purchased by to tondorr) Genera Speieatons Parts Spesieatons (von 2&3) Particular Spcticatons (Divsion 4—7) 1 artesar Spectieatons (lvsion 6 ~ 10) Particular Spocticabon (Division 1-13) = Particular Socios (Division 14) 2 PartcuarSpeceatons (Divaion 15) Particular Specticaons (Dvsion 16) Drawings Conceal Indeating Drawings Schade of Rates and Bil of Quantities Preamble, Method of Measurment ile of Qusnttiee ‘Analisis Pees ‘Appendices (Addendun 1) Contractors Scope of Work PartA: Construction Sope of Work — Book tof 4 Part: Design Scope of Work ‘Appends~1(DWaien 1 - Specifeations)~ Book 2 of 4 ‘Appendb:—2 (Sol investigaton Report) — Book Sot ‘Append — 3 (Hela) = Book ot ‘Degn and Performance Requirements Funcional Space rogram (Narave and Schedule Book tof 2 CConceptsl Design and Engineering - Book 2 of Genare Archtectural Fishes and Door (Naratve ‘nd Sehodula)~ 3013. {Generic Room Data Sheets (Narrative and Schedule) (Book 115 15 0f8) (Geneve Elcromechanicl Requirements (Warave snd Senedule) 5 of = Gentvactors Tectnial proposal ~ (Book tof) 2 Gentractors Technical propesal (Book 2of2) © Cenactors Clantsatons roiect Manual Vouima Na, ‘volume 1 Volume 1 Volume 2 Volume 3 Volume 4 Yotume 5 Youme 8 Voume7 Youme 8 vvoume S volume 10 Volume 11 Volume 12 Volume 13, Volume 14 Volume 15 ‘Volume 16 ‘Volume 17 Volume 18 Vouume 19 MINISTRY OF HEALTH (MOH) EXPANSION OF FARWANIAH HOSPITAL TECHNICAL SPECIFICATIONS TABLE OF CONTENTS DOCUMENT II -2 SECTION DESCRIPTION PAGE NOS, DIVISION 2 — SITE CONSTRUCTION [2010 SOIL INVESTIGATION REPORT 1 02100 SITE REMEDIATION 2 02110 SITE CLEARING 2 12200. EARTHWORK ° 2203, DEWATERING SYSTEM 3 02225, DEMOLITIONS. 4 02250. EARTHWORK SUPPORT (SHORING) 2 02310 FINISHGRADING 1 2521. TRENCH EXCAVATION, PIPE INSTALLATION AND BACKFILLING a 2365. TERMITE CONTROL 02525. PRECAST CONCRETE KERES 3 2620. SANITARY SEWERAGE SYSTEM 6 02634. CAST & DUCTILE IRON MANHOLE COVERS AND GRATINGS 2580. ROADWAY AND PARKING MARKING 2 02630. STORM WATER DRAINAGE 16 02760. SITE FURNISHINGS 3 2820. FENCES AND GATES 4 2e42_ STEEL BOLLARDS 02600. TRAFFIC SIGNS. 62000. LANDSCAPING WORKS. (2005. PLANT PROCUREMENT AND DELIVERY 02010 SOIL PREPARATION 02620, PLANTING SOIL Max 2925. PLANTING PROCEDURES AND MATERIALS 02050. TREES, SHRUBS, VINES AND GROUND COVERS (2070. LANDSCAPE MAINTENANCE Design, Construction, Equipment, Future snd Op Maintenance or the Expansion of Fanwanih Hosp DIVISION 3 = CONCRETE PAGE Nos. 9100 CONCRETE FORMS AND ACCESSORIES e (08200 CONCRETE REINFORCEMENT 5 03900. CAST.N-PLACE CONCRETE a 08360 CONGRETEFINISHING 5 03855 SURFACE HARDENER: 2 (09985. POST-TENSIONED CONCRETE 16 3410 STRUCTURAL PRECAST & PRECAST PRESTRESSED CONCRETE 1“ 03411 PRECAST CONCRETE HOLLOW CORE SLABS 0 00451 ARCHITECTURAL PRECAST CONCRETE 0 (0196 GLASS FIBER REINFORCED CONCRETE (GFRC) 09520 LIGHTWEIGHT CONCRETE FILL (08521 ARCHITECTURALFLOOR SCREEDICONCRETE TOPPING. (09542. SELF LEVELING SCREEDS (03805. TESTING OF WATER RETAINING STRUCTURES 1 DIVISION 4 MASONRY. (04220. CONCRETENASONRY UNITS 6 DIVISIONS = METALS. 05:20. STRUCTURAL STEEL, (5400. COLD FORMED METAL FRAMING (05500. METAL FABRICATIONS 05528. PIPE AND TUBE RAILINGS (5700 ORNAMENTAL METAL, (05705. EXTERIOR ALUMINUM PANELING (5726 GLASS AND STAINLESS STEEL RAILINGS (05806 ALUMINUM EXPANSION AND SEPARATION JOINT COVERS. (05818 EXPANSION JOINT COMPRESSION SEALS ° 3 ‘ Design, Conetucten, Ei Maintosane forthe Ca xe and Oparatonal Noh Hosplal Sa DIVISION 6 WOOD AND PLASTIC PAGE Nos. 08100. ROUGH CARPENTRY 2 (05200. FINISH CARPENTRY 2 (08650. SOLID SURFACING 5 DIVISION7 THERMAL AND MOISTURE PROTECTION 7118. PVC SHEET MEMBRANE WATERPROOFING " (07120. SHEETWATERPROOFING . ors. CEMENTITIOUS WATERPROOFING 4 07180. BITUMINOUS DAMP PROOFING 4 07160 CRYSTALLINEWATERPROOFING 5 or1ao TRAFFIC COATINGS 10 07213 BATT INSULATION 2 07350 PROTECTED MENGRANE ROOFING 6 (07620. SHEET METAL FLASHING AND TRIM ‘ (07811. SPRAYED FIRE RESISTIVE MATERIALS (SFR) 0 (7&0 FIRE STOPPING AND SMOKE SEALS 3 (07920. JOINT SEALANTS: DIVISION 08 - DOORS & WINDOWS PAGE Nos. (08110. STEELDOORS AND FRAMES (08130, STANLESS STEEL DOORS AND FRAMES. 8211, FLUSHWooD DOORS (08310. ACCESS DOORS AND PANELS. (08322. OVERHEAD COILING DOORS 08596. PUSH-UP ROLLING COUNTER DOORS (08343, ICUAND CCU ENTRANCE DOORS (08450. ALL GLASS ENTRANCE DOORS AND STORE FRONTS (08452, SWINGING AUTOMATIC ENTRANCE DOORS (09520, ALUMINUM DOORS & WINDOWS 08523 INSECT SCREENS FOR WINDOWS. (08828, STEEL FRAMED WINOOWS WITH INTEGRALMICRO BUNS. 09825. ACRYLIC GLAZED SKYLIGHTS (0980. METALFRAMED SKYLIGHTS 09658, SLIDING SERVICE WINDOWS 05710 FINISH HARDWARE 18000. GLAZING 08816 DECORATIVE GLASS (08000. GLAZED ALUNENUM CURTAINWALLS 08670. STRUCTURAL GLASS WALLS (08976. STRUCTURAL GLASS CANOPY AND ROOF ‘eign, Construction, Equpment Future snd Operational aa DIVISION 08 - FINISHES. 19100. METAL SUPPORT ASSEMBLIES (92200. LATH AND GYPSUM PLASTER (08208. LATHING AND CEMENT PLASTERING (09250. GYPSUM BOARD (09254. GLASS REINFORCED GYPSUM (GRG)WALLBOARO om200 THE (8400 PORTLAND CEMENT TERRAZZO 8610 ACOUSTICAL CEILINGS (8615 SNAPLINAETAL PANEL CEILING SYSTEM 00825 WALL PANEL SYSTEMS 100890 WOOD FLOORING (00600 INTERIOR STONE WORKS (9628, STONE FLOORING (9680. RESILIENT FLOORING AND BASE 09600 CARPET (09682. MODULAR CARPET THE 09705. EPOXY COATING (09724. FABRIC WRAPPED WALL PANELS (0900. PAINTING (00060. HGH PERFORMANCE COATINGS DIVISION 10 - SPECIALTIES {0106 MARKERBOAROS AND TACKBOARDS ‘0160 METAL TOILET COMPARTMENTS {0100 CUBICLE CURTAINS AND TRACKS 10240 GRILLS & SCREENS. 10250 SERVICE WALLS 10266 CORNER GUARDS AND CRASH RAILINGS ‘M270 ACCESSFLOORING 40290 PEST CONTROL 10380 FLAGPOLES 10436. EXTERIOR HOSPITAL SIGNS 40438 DIGITAL SIGN SYSTEMS. Dig INTERIOR HOSPITAL SIGNS 410500. METAL LOCKERS 410880. CANOPIES, CAR SHEDS AND WALKWAY COVERS. 10615 DEMOUNTABLE PARTITIONS 40850. OPERABLE PARTITIONS. 10900. TOET ACCESSORIES ro and Operational Mesa! Design, Consbucton, Eppes Ey Maintenance or ne Ex , PAGE NOs. 6 6 ® a 5 5 5 1 DIVISION 11 ~ EQUIPMENT PAGE Nos, {1010 FACADE MAINTENANCE & WINDOW WASHING SYSTEM [ 1020 SECURITY & VAULT EQUIPMENT ‘050 LIBRARY EQUIPMENT 110. COMMERCIAL LAUNDRY EQUIPMENT $1132 PROJECTION SCREENS. HI80 PARKING CONTROL. {181 AUTOMATIC DOCK LEVELERS 11187 MOLDED LOADING DOCK BUMPERS {11170 SOLID WASTE HANDLING EQUIPMENT (Ps s2e the sttached Annexure 1) 11180 AUTOMATED WASTE AND LINEN COLLECTION SYSTEM sr (p's 200 ne atacned Armee 7) 1130 LIQUID.WASTE DECONTAMINATION SYSTEM FOR SANITARY SEWER 6 (Pi ae ne etacned Annexe 1) 11400. FOOD SERVICE EQUIPMENT 10 41800. MEDICAL EQUIPMENT- (le se he atched Annexure 2) 7 DIVISION 12 - FURNISHINGS 42100 ART HANGING SYSTEM 5 12350. KITCHEN CASEWORK a 12352, HOSPITAL & LABORATORY CASEWORK tr 42480, ENTRANCE MATS 2 12492 HORIZONTAL BLINDS 5 12404 ROLLER SHADES a 12495 CURTAINS & DRAPES ‘ 12500 LOOSE FURNITURE GENERAL SPECIFICATIONS + 12590 MANUFACTURED CASEWORK. 8 12610 FIXED AUDIENCE SEATING 2 12800 INTERIOR PLANTING 0 DIVISION 13 - SPECIAL CONSTRUCTION 13090 LEAD SHIELDING 2 13005, RF SHIELOING ° 19190. HELIPADS 2 45172. THERAPEUTIC POOLS 7 8210. CONTROLLED ENVIRONMENTAL ROOMS 2 48280, RAZARDOUZ MATERIALS REMEDIATION 0 DIVISION 14 - CONVEYING EQUIPMENT. 4100 DUMEWAITER 7 44200 ELEVATORS “ 1820 MOVING WALKS 6 14580 PNEUMATIC TUBE SYSTEM 7 "W585 PNEUMATIC:VACUUM WASTE TRANSPORT SYSTEM ° : ‘W640 TRAVELLING GANTRY CRANE 0 Design, Construction, Equipment, Future and Operation Maintansne forte Espana eh espa! DIVISION 15 - MECHANICAL +5060 15070 ‘2080 15150 105 15195 1215 15320 15925 15965 15400 19490 1940 1491 13680 15060 18720 18762 15760 18810 Design, Construction, Easing rah (GENERAL PROVISIONS FOR MECHANICAL & PUBLIC HEALTH WORK. HANGERS, SUPPORTS AND ANCHORS [NOISE AND VIBRATION ISOLATION MECHANICAL IDENTIFICATION MECHANICAL INSULATION PIPELINE ANCILLARIES & VALVES [EXPANSION FITTINGS & LOOPS FOR HVAC PIPING [STORM WATER. SANITARY SEWER PIPING SYSTEM SSTEAM GENERATION AND DISTRIGUTION SYSTEM ‘CHEMICAL WATER TREATMENT Fue svsrem LQUIFIED PETROLEUM GAS STORAGE AND DISTRIBUTION COMPRESSED AIR SYSTEMS MEDICAL GAS SERVICES. FIRE PROTECTION PIPING FIRE PUMPS AND CONTROLLER FOAM EXTINGUISHING SYSTEM M6200 EXTINGUISHING SYSTEM ‘STAND PIPE AND HOSE SYSTEMS. WATER SUPPLY SYSTEMS PLUMOING SPECIALTIES PLUMBING EQUIPMENT ‘SANITARY FIXTURES AND FITTINGS [DOMESTIC WATER STORAGE ANO FILTRATION HOT WATER CALORIFIERS FOUNTAN EQUIPMENT HVAC PUMPS, CENTRIFUGAL FILTER, PRESSURISATION [AND EXPANSION (COOLING TOWER [A CLEANING DEVICE WATER COOLED CENTRIFUGAL CHILLERS (NR HANDLING UNITS HUMIDIFIERS: ‘TERMINAL HEATING & COOLING UNTTS [AR OUTLETS AND INLETS ucTWoRK end Opertons Sy ospaa PAGE NOS. DIVISION 15- MECHANICAL 18820 15600 15063 15040 15000 DUCTWORK ACCESSORIES FANS ELECTRONIC AIR CLEANERS CONTROLS COMPONENTS TESTING AND COMMISSIONING PROCEDURE FOR STEAM BOILER AND CALORIFIER INSTALLATION [UILDING MANAGEMENT SYSTEM TESTING, COMMISSIONING & BALANCING OF PIPEWORK DUCTWORK SYSTEMS, DIVISION 16 - ELECTRICAL, 16670 wes 16720 16740 16770 ser 6772 16700 10990 16995 Design, Constucten,Equpment F Maintenance for the Expansion of (COMMON WORKS RESULTS FOR ELECTRICAL BASIC ELECTRICAL REQUIREMENTS BASIC ELECTRICAL MATERIALS AND METHODS, (GROUNDING AND BONDING HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS ELECTRICAL IDENTIFICATION ‘CONDUCTORS AND CABLES. RACEWAYS AND BOXES CABLE TRAYS: WIRING DEVICES GENERATOR ASSEMBLIES SOLAR POWER GENERATION SYSTEM CENTRAL BATTERY EMERGENCY LIGHTING EQUIPMENT DISTRIBUTION SWITCH GEAR 8 SWITTCHBOARDS LIGHTING CONTROL, MANAGEMENT AND DIMMING SYSTEM Ups SySTEM LIGHTNING PROTECTION (CAPACITOR BANKS (CABLE TRAYS FOR COMMUNICATION SYSTEMS {GROUNDING AND BONDING FOR COMMUNI SYSTEMS INTEGRATED SERVICES FIRE ALARM SYSTEMS NURSE CALL SYSTEM ‘STRUCTURED CABLING SYSTEMPASSIVE NETWORK) PUBLIC ADDRESS AND MUSIC SYSTEM ‘AUDIO VISUAL SYSTEM {QUEUE MANAGEMENT SYSTEM ip-rv sysreM PARKING GUIDANCE AND MANAGEMENT ELECTRONIC SECURITY SYSTEM PAGE Nos. 6 18 2 BRovdvasee 8 SOIL IVESTIGATIONREFORT General proven fhe Contact inutng equremens of at Contact Documents shalappy ois Secon 1 Geototnia apo s enineed in Document 7-1 fr gultance ony. The Constr mest make his own enquires as Yo the nate ofthe round andthe suvsot conaions an ake eosneay "Hop te deal wih hese and nda tangle ae unioresean faces ns Tender Pre. paRt2 -PRoDUGTS NoTUSED PART ~ EXECUTION Nor useD END OF secrION es aio Ean iro ‘SECTION 02100 [SITE REMEDIATION PART 1 GENERAL “To be rend wih Onion 1 - General Requirements, Gondions of Contact, frst Teohncl Speczatone and asacated cravings of his Contact ey ni get ener, dec ard oe pain O10 44 summary A. This seton ines the folowing 1. Removal of olson contarinans om ste lnd fr tho gneral 2, Removs of hazed conament fom st waste wate. 8. Removal of cnet waste matevale fom Iniaraton pan upon ‘Sonia eneaton 412 REFERENCES AND STANDARDS |The minimum standards for products specied in tis sectbe shal be ‘udng ae under but not id fo te folowing! Excapl so oterse ‘pected ean, peor work lv accordance wh apecicatong,cosee end ‘Exar "caed “paren, "and" thor ines! eons, evslors, epplcabe ‘Eadenda and suppers. Where tere coe between the rtreneed {andar he mast enget ofthe engonstequremens that bs aptcase, 8 KEPA Repulstons — Implemented under Law No. 21 of 199, as amendos by Law No. 16 of 1990 regarding entnmen!feguremens and stancaras ‘Me ste of Kawa (C.—_Alrpokants omited should be win the Ime set by KEPA roms a per ‘opera (17-1) ana (17.2, D. KEPA 4. Append 10: Crema! materials management 2. Append 18st ot Hazardous Characins ~ Bat. 3. Append 4: Taalad Waste Orinage Wale Discharge into ‘Sone 4. Append 15: Treated Drainage Waste Wer ue fo ign. 5. Rependi 17: Amblnt Ar Quay Standards E. _ OSHA (Cerupaonal Safty and Heath Adnan) reguatons FAX applicable ecal codes, regulations, te of Autores nevng Straaeton 13 18 “Daan, Canario pret Fre ne pwn Uananeorne Sgeneun Farris Hosp! DEFINITIONS |A. Contamination of land, fr te purpose of the work of this eacon means the posenca of 9 substance st & conoclon sbove the conenvaon =a Which he sustoncs normaly present In on or ane’ lana inte tame IGety beng a presence fat poses anor ham to human hath ony ‘her aepot of he envronrnet 18. Contamina: for the pupose of this secion, means to cause such (©. Land incloes water on oF tow the sutace of land and the bed of such wt eon ldontod by characeraice or stng a6 havarsous pursuit I wecion Bot of to Resource Coneenaton and Recovery Act of {a70, PL 36.50, 40CFR Pan 26%, lines Eawonmertsl Protection ‘al a5 WucS 878.220, and Secon 609.109 of Tite 36.~Envronment Protecon: Subtle G = Waste Deposst: Chaplr 1 — Potton Con! Board Riwoste is chteted at hazatour ¥ feeble any of tha ollowng 1. lata 2. cCamosiy 3. React or 4 Tovey, and_a¢_dofned i, nls Admiisraive Cate Tee 35, Seaton 721108 (38180 721.109) ‘QUALITY ASSURANCE A. Raguunly Requremen: Comply wih governing EPA regustone in every Siep of the remediation roglamme. ‘Comply wit posal rgustons of uri having juan 1B. Preomediion Conerene: Conduct conference at project sto rior to ©. The Contactor_must_mect anspor requsons and arange the Pomiing. for spoes! ‘aoltes, por to alrle 10 be depoced or anepored 4, The Contrasts deporl plan fr at mtefaly must bo cutined and ‘Ripped tote Enger incu malaise tobe depos, ested ‘nantes, anspor. and epoca focaycareates 2 The Contactor must show appeabie cereals ard record of preva eb performance suaMirTALs: A Copies of th follwing submis mist be prepared and suited 1 the Enniee: (2) \ Sigs 1. Conrcto’s ste specifc eth and safety plan forall workers fngaged In excavation, storping, losing. waneporing ané Soper 2. Sal Managomant Pian outing proposal excauaon work sequences nd "procedures fo sopart each type ol Malral fom clean ‘matrais an tobe removed tom the te 8. Letar of Auorizton fom te faty where soi (nen zardou) land citer debee are to be depot, por to femora fom he opt te, 4. Copine or Anite! resuts fr each waste sample to be moved fom oe PaRT2 PRODUCTS A. The Conraclor must fomish a necessary means, product, ols and ‘aulpmentfeqied te remave nonessrdous spec wate soi, fl sce ‘sbris ete from te projet se ab decdoa by th Engneor oF a= Satod he ‘een pana and spect 31 AUTHORIZATIONS [A Odtain subetzaton trom the posal acy whare nomtacarous speci ‘rata, dei et obo dopostod. 22 MATERIAL SAMPLING ‘A. The Contactor must cobct selon amount of reprseisve sample om {ach iype of matt! bing removed fom testa for analytes eg fo obtain Suthteaton "or he ulimato Soposton of fe materia. The Sonar Is Teaponatle for auton oF ny reed permit ana payment fl foes The Convatormust be responsible for obtaning aid samples need for ‘harcieranion ‘or had posal for depeston on st 2s sopeabe ‘The Carcir respostie forte action of ay perm and pyran any foe azocaed wi gud Sposa. 33 EXCAVATION A. The Contactor must geriom excavation of sol or nonhazadous special Wate sole, backll ec a dtectod by the Enghaor A excavation ‘must be permed in ascordance wih OSHA requremans snd gies. “Gass, Conan Rape Fare od Oper ie Rana Nttraneforihe Beteaes Fatanon spat amereo: 3 4 HAULING A. The Contactor must eer the tactocsalers or wack tal te lsded wih Innere for oflatapacamanteshage by remouing eign sly o ook {fom he exter one squpment The Contactor most not teste dist and etal malian aeequete dust "uretesslon equpment on poet ste conden waar. ©. The Contactor must matin steels dean and fee fom mud and dust. 1. The Contactor must conduct so femoval_in a manner_that_ensures rnin Inrerancs with rods, ates, waks and othr adjscnt occupied ra ured fcaten Donel ose of, obstruct any ongoing aces witout Fomsson om the appeals governing. apenc. Prowde.smate roar round sees 35 TRANSPORTATION 1A. The Contactor must remove sole, orks, fom the exon of tuck, wal ‘or any oer heay auant lean the si before Hey eave Ine roe! se ‘A. The Contractor must contol dust by af necessary mans, ichng but not Tita io covering rus, tospies'ané open atria, watery Mau ead ‘seeping pave rads and lnfing he speeo ons vices 37 COMPLETION A. Upon complaon of entie work of se redaton under this secon, he CConvacor'must invie the Enginger to very and expmine the sbtacoy ‘Gonpaton ofthe work under ie sacton and bain a complete cerieste Some Engine ENO OF SECTION Taig, oan cane Fema SITE CLEARING PART — GENERAL To be re08 wih Dison 1 - General Regurements, Condens of Contac, a Toad Teens! Specboane end artoested dawns a the Conrach. 44. DESCRIPTION 1A. Ste cast shale he removal fhe lowing 4. Removal of Suse debris 2, Removal of pang, habs, saree, corre, foe. 3, Removal of res, sts an slants 4 Remowl_of underground tanks, sbundant sores and 5 ee. 8. Provide ibowr, matron, equpmant and appfances ant perform a nezessry operas ta execute th wok of he section, |A The Cotta stal bo required to coo he work of oer sctons wih tho work of tis cochon "lated work fo be coonated and oad 1. Sacton 02222 Excavaton 413. REGULATORY REQUIREMENTS A. Conform Kawa Munipalty codes for all appicable. enveonments ‘equrments, “daposal of obra, burning Seb on ae use of eis, 8. —_Buming of debe nat permed on se ules apeticaly approved by the Engineer [ 6. Coordinate Clara Work wih tty companies (wor useD) PART3 EXECUTION 34. PREPARATION ‘A. Protect and matin benchmarks and suey contol pains om stutance ‘dng const, ‘erty san fe designste to remsin sagged or erties Ieently an tea fr placing removed waste mati ntl such rbd6h ‘enowed won ste 16 unpaty Hp. No" tmpsan eB Nes 3 1. Lent an tea fr placing savaged mates (any) 32. PROTECTION ‘A. Locate, ienty and protect servos that remain 5. Protect wees and ater plans and features to ema ©. Protact bench marks, survey contol points and ising stnctee tom tGavage ered daplocerient 33° CLEARING ‘A Car seas equ tor oaces to ste and execution of wok. Remove trees and ahrabe not designed fo remain. Remove stumps, man (©. Gloar undergrowth an dead wood, witout ising ops ©. Appy neta to remaining sump ont growth rol existing pavements, fences and aacent land or prope om undue amaze 34 REMOVAL [A Remove debi, rook, exacted plant He, unwanted mater om se. : 5 Remove paving, tems, erent, ete and eter tem as dete by te Engine (©. Excavte and remove _any_ underground tanks, retaining stars | ‘Sevodted_ ping, fungston pad lc 36 aected by the Engheer ard as found on #88 35 DISPOSAL OF SURPLUS AND WASTE MATERIALS lL A. Remove supe sol mates, nulla tapsot,_sbebuctons, Somolshed ‘elotls and wacte meofSe ctuing ash and debe, and ‘easly depose thom of the manner and to he locson ss reted snd Ssoproved ny he Engines END OF SECTION ‘own, Crsacion Favorit Furie sd Opaiona ‘ear Re ‘SECTION 02200 EARTHWORK PART - GENERAL {General provision fhe Conractincuaing requirement of al Cetract Documents ha appl to this Secion ‘Crmly weh al appleable requirements, standards ang codes spocfed in FG! 2010, Selsbines ‘er Becign and Consruchon ot Heath Care Facies 4101. DESCRIPTION ‘A The werk covered by this Sacto shal be as perth requirements ofthe Contat and as speed harem, comprises of umishng al lant labour eqpmans, sptances and mater fr performing all persons nconnerton wan exenatan pacemen sablzaton and cmpacto eh and spel resented mars Perio sath werk in sccordance wih the requirements of the Conract an speciation Determine te extent of excavation based ‘on the roquromenis ofthe chceen procedures nd meine, ©. Eantwok for excavation frail he bulings shout nt afet the structural staity ofthe existing bnge which fe ear andthe Conacor shuld ensure hall hcessary seta precautons fe arog out porto any excmraton me faranish heel cams +02, RELATED SECTIONS. 'A.The Contractor shal be requir to coordinate the work of tor sections wh the wok of his fection. Relata work tobe coordnsted and vod m cannon wih and no inte: +. Secton1s29 = Submit Procedures 2 Seciont400 = ualtyRequiremenis 3 Secton0z203 Dewatering Systm 4 Secion2510 = Read Paving 5 Secion2515 = Pave, 6 Secton02525 Precast Concrete Kerbs 7. Secon a2500 Landscaping Wks 1.03, REFERENCES [A American Socket for Testng and Materials: 1 ASTI D698 - Stand Tes Method for Laboratory Compaction harass of So Using Standard Eta (124808 ROR (500 kN). 2.ASTWD1S56 - Standard Tet Method for Density f Solin Place byte Sand- Cone athe, 3. ASTMD2167-Stanaard Tet Method for Dens and Unt Weight of Son Pace bythe Rubber Ballon Matos 4, ASTI 02022- Stanger Tet Nha for Dens of Sol and Si Agoroste 2 Place by Nuclear Mathes (Shalom Dept) Locality standards when working wh 24 inches fuiyines. 1108 SUBMITTALS ‘Design Cranisen Feuer Minions rth Epanson oF 13 The Engineer's approve! shal not reve the Contactor of his obigatons anabitis under the (Contract ana the Contactor shall bo responsbi for execulng the excavations and temporary Werks In safe and professional manner 1.05 EXISTING CONDITIONS AND PROTECTION [A The Contactor shal be caemed to have ited the sta pro 1 submiting his taner, examine tho ‘he, rocors of exiting les and constuction, ced ot test brng, andthe subaurace exeraton ‘porta o delemne a condone under wich te wrk willbe performed ar alon oral facors ni fencer pee The Conracor shal conduct @ topographical suvey ofthe ste and the dete In 2 vepot, end roving (S00) eae eubmttedt te Engineer oration and ecard bforestring Works C Obeivetions, exsing constuction, et, of wich no records are ealabe, may be encountered Mate enquires and formule onchalons ‘ato the exert cf ary such otc, exg Consvton, ee, nd remove all ates of any nate to the selgred grades mated or epesfed ‘ho any extra oat and te. . The records of sisting tities and sisting constveton (nelusng undergound construction) ‘precents all condone know the Engineer ore working near any exting bulking & wie, not the Engineer. Co-xhee and sateguerd from damage or movement any exsiag serece, utiles and uy stusives Uncovered ct ‘cnountered which aeto remain in service, F. Cong the Engineer immesiat for drectons rogaing any uncharted or incorsty charted ising ules encountered durag excavation. ooperte wih th Usly Authortes 8 mariaing Pelt “Suties in peraton 6. The Contrctr shall indemnity and save harmless the Employer against any damage whatsover Gnunod to ay euctures,ronieesssacant loo under the Ste, ue tothe Contactors constuction seit, 1108 SAFETY AND AVOIDANCE OF NUISANCE [A Peron al wor in such 2 manner 2 o ensure the safety of the Wort, the publi and adoning sites dco aslo alse ss ile mconvenonce as pessble fo the pube and acing Employes, nd Slow nthe Tendor for al ncossaryproautons fo ha ed 18, Proke alomporry and song barr ound te eget excavetors as asafety meas. Keep sles and mater away fom the edge of excavations so af fo slow fee movement . Une atu sel er mbar stare to clo up and down excavations, Do net use dss Execute earthwork and sharng acts (and Ste work generat such a mannesto ‘neurethat no damage costo adoring pope. ‘107 QUALITY CONTROL |A. Employ and pay ab charges to me Goverment Cane Sgeasting and Laboratories ~ MEW of snoter laboratory approved by the Enginar to peta submit eps specie ine Seeton 5. Tho said approved bray shal be response fr conducting an ntereng the tess site in ‘22h rept water a at the lst specenere comp win al equerers of he Coat Docunents an hal epeticaly nate any evans nore em Testing of Matera: The eld approve laboratory shal perform all tess erin speciied end any boston eee as may be requied and subme tet report fo the Engineer, sue lowag 1. One optimum moisture maximum densty. curve for each type of sol encountered in su ‘fades and’ fle under foaled ‘and conthuoys_ fetings, sabe on grade and paved Te35, Betermine maximum dense n accordance wth ASTMDI657, 2. Each ype of boom material sha eve a, Mocharical Analysis, ASTM D#22IAASHTO Ta. », Plasto index Determination, ASTM DAS 8IAASHTO TSO, © Moisture Dersiy Curve Determination ASTM-D'SS7 4 COR test as measure or Bearing capac when required 83. The sot approved ltoratory shal determine th suai of materi to be used for ls and tan ‘he approvalef tne Engines . Testing of Sub grade and Fil Layers ‘Subarados ang fil yer shal be approved by Ine sald approved laboratory and the Engine Before consvucton of any futher wort Dereon Testo subgfais ar lyre shal bo tkon 1. The op 200mm of sub gra resting fom excavaten shal have the maximum deny at opin ‘moire Peete speed Ini fess each leer of call ect the quod ant 22 Fereater species, Mate least one (1) fold Sealy test ef th sub-gade for every Wo ‘andrea square meters ofthe sol teow foundations, paved ara o slabs on grado, ut no case ‘Ess than thes (3) tests In each compacta i layer mae one (1) Feld ders tes for every ‘versyig two unde aquare meer (200 m") of pave ates or sas on grade but mn casa ‘han roe (3) test Pvt eld deny teats in acordance wih ASTM D1s86 6° ASTM D267 Cooperate wih the sold approved laberaory in evry respect in the psfrmance of he exuied Ff basod on ports ofthe said approved latratory and Insect, the Sub-gade or backs are {Gund to be bok to specie davety.adaionl Compaction snd esng shale coma oxt he ‘oponee ofthe Contractor PART? - PRODUCTS. 201. MATERIALS | stvetra Fi 1. Sound, clan, curable, granular materiale tee rom deleterious mater and in scordance wih the fotouing gradations: ASTI Sieve Size Total Passing by Weight Firm 00 3mm 70.100 2mm ‘5588 ‘mm 5080, a een ee ETORC tonnes eat au - & nm 70 now Soe0 Neto 2080 neo i030 Ne-200 548 2.Gradsions inthe tabla above represent the mas which shall delemine sent of aggregate for ‘ie rom the soures suo ‘2 Stctral fl may be clasiied as well graded granu sob - Group 1 (non plas sols wih 3 ‘unfomiy osficent exceeding 10), 4.Use stra fil under concrete labs, sdeswalts, paving, under uty pips, ands chor sl bearing ‘huatons fo fl wihin 300 tr measured haraoraty fam pee of fstnge andor bow gre ‘otic surfaces as approved bythe Enghes,excet whore dranapo lw eater specee. ‘51 susan suc rata rot svisble or excoaons under bis Cort than atonal ‘i uta for use, shat be bough oe Ste om der sources Sa cxesvcod mar th So for ‘eo ae suru fang rater brought theta fr use a suctral Ml sal ect he above ‘oauenents 18. Ontnary Fi + Oninary shal be natural so wel-graded and fe rom allergen, weak, compresbloondexsarive ‘motel (evan e high pase clays) ar wo ee of el subj fo decay or socompostion, ard [Shas conn no stone lvger tn 150mm in mantnum dimension 2Osdnay may be cared ss unomly graded mates ~ Gop 2 (nora as wh @ ‘Sori coefitent of 10 rss) .Use orsnary fil for general gracing and backing except areas where structural or canage fi ‘Sroqures 41 sufcent ordinary fil mterl isnot avsable from excavations under thie Coc, then ational ‘i eutabsfor uae shal be Brought the Ste tom che souss, Both excavated matral rom the ‘Se for vee as ordinary fit and matoral ought the Ste Tor use 2s orsnary ell meet the shove reguremerts 6. Drainage Fi ‘Drainage fl shal! be tne aggregate, clean, well graded, Hee-dainng sand, complying wih ASTM 38, 2 Disinage fi material shall be laced under utty enches, behind reining wa, for thickness of 60 cm below Agrcutral sa aa landscaped & parted seas‘ here eae forthe Conect D.Wister 41am sdequale supply of water for use in consucing carhwerks In ascodance with these ‘Spectcatons shal be provided 2.The use of fesh water on brackish wetor will bo permite for al ethwork operations (ori thatthe ttl lssalved sole do ht excoed 4500 pars per mion) unless apechialy sated fo the onary. PART - EXECUTION 308 EXCAVATION A General ‘1. Prior ta execution of any works on ste, the Conractr shal cond for approval sia excavation, 2. Clear he se of use, shute and ctr vegetation ste improvements above an telow rade) and aed srvons and obsructon to craton 3. Excevata any materi cling love sand, rock and ol foundation) a he ines and Sovoons as rogures Make exeavaone sticenty leg to pea al wor tng fo Tome ‘eiorcanert, soca, netalaton of welerpoafng,wates ang oer work below grade and fot Irepecton tert 8. Unouorzed Excavaion: Excavalons performed below the sevatons shown or seca witout bbe Engncors por writen approval ha tte Engmesredgrovon and wou aodon oak bo sacl th conrte of approves Seng, ness tuted ihre by the Engineer ©. Auorzed Acstenal Excavation: In case unsuitable bering soll is encoune st sit-grade ovations shown renave uneulabl ol ana repsae wth sper ol ost beng, fotng ec ‘ower level ae dete by the Engineer wh ressonabl atonal bre ane costo he Conc. 1. Excavaton for Paved Aras and Kerbs: Sub.grade shal be sporoved by the Engineer Before rocaeng wih consructon of pavements anata The top 300 mm of subarade resulting trom oxcavaton shall be fee of unutable materi “hd be egal fons fckaning prcnlages of matmem dency at pimum most when fsoa in ‘Deorancs wih ASTI DIST 1) ner paved areas an Kors: 6% 1 Under sa on grade 00% te subgrade does notmet te stove requremerss after proofing, compas te sit-gade ‘yong wih urate compacioncqupmn to tan te dena pected, , Exonaton for General Grating. Excavations made belw the elealons shawn oF specie, ‘Sets ured by Vaatlon Oar eal be ld and compacted (es Horna pciod for ing ‘End compacting th na nsrease ny Conrad Pie F xcuatio ooltd and Coninuus Foun: Excvatn ood od orunusfundaons ‘hal be Mn atcovons wih fe tequtenart of fhe Conc The ground to veave und once FBipe the fcuncatons shat be fal and ee of lous rock, GF brs and sane wate pr To _sezetace fer pacing cont, 6G Treneh Excavation Tendhee fo ping and ulti shall be not ess thet Orem or more fan 258mm alder then te ise dameter of Te pip to be led heen. batons of tenches Shall Go securely graded wih bl ois es0oped Gk to prove untor boaing supports pipe Sta use on undeturbed ot troogheat terre Tong, except where ober means of Stnporng pbs ete nested. Rock risa sal be exceed Yo 1S0rm alow pipe Hert and bod bored wah drainage wal amped lace ‘362 FILLING AND COMPACTING [A Mater Mater for il and bck shallbe as ner before specie, cbiained Fom te vequed ‘rcaraton on St, # socal fom brow sures. 8. Utlston of Excavatd Materia: Sutable excavated mateal for and bacll 3 defned in Paragraph Matera shat be approved by te engineer pot to uve, Mata whch i sane fr tie a Munda exteior lab ar pais an fo Bac sao soparato rom materal wich ‘ony euabl fr pena grading Se anes a TORR of Boron: Provteadsona mater esuted tno additonal cost fo the Employ ‘ecepbl brow sel ona fstab mater! a here blorespeced. Representative samples of each ype of borrow mate coniered suteble sal > dvered {he Enger fo approval 1. Placing: Place fl mar n hoz! lose layers In such manner 2 19 produce 2 uniform {hknersof mato Pacamert shal sot i tha doepet aro ane progress appre pael [oho tnaned pads, Tcunece of lyre before compacting haha exceed 30mm No ft mstra hal be place on area whare fee wales standing or on suas which have ratboan approve gio Compacton: Compact each layer of fi wth equpment to achive the folowing peeanapes ‘masa deny at optimum moisture when tested ssoréann mh ASTM D135 Locarion sma [DENSITY Under ieclates& Continous Foundation % UUncer Pived Acas and Kes, 35 ‘Under Sibson Grade, 38 Soneral Grading * {bo rot compact soll when the moisture cont varies more than 2% fom the opin mote fonerg Malas mtae somtent by weting or ye ‘manpulllon Sucpand compacting ‘pariona when estar renute cant Be obtained Decase of ai oF oar tnselacary ‘orate 2.tn fe of dying by maniplton, cated ime, monshyated lime, sma bent ngecants ‘hay bs used euce te more consent reduce he las nx or prove werabiy. Aly "ich npresint na manne’ and quays fecorenced by tro arwfacue a8 rqued bY tho a approvedaboratry and aperoved by he Engin 1303, DISPOSAL OF EXCAVATED MATERIALS [A The Contacto: stall gan par writen approval fom the Enginaer ard tom te apropie Uhoitas having hetdctin for the ‘apes of sus excavated maori Yom sta 8. Matera resting rom daring an gubing operations must nt be but on te Dispose of at such materi gal of he Empoyers oper ENDOF SECTION “Saag aia, Semen Feria Ope SsecTION o2203, DEWATERING SYSTEM PART 1. GENERAL To be read with Ohison 1 - General Requremenis, Condtons of Gontrct oiroted ‘Tecnica Spectzatone and asocted drowinge of ha Contact Cerny witha appa fequvement,slandas and codae pected in FGI 2010 Cifshines for Desi ard Constant Heath Cae Facies 14 SECTION INCLUDES A. Provision of a tabour mails, san, equpment ond selancss. and eromance of a necessary operations regured to exut the mor of Hs 8. TRE design, provision, neato, maintenance, operation forthe ‘egures dratone and suosequon emovl of sytem 1. Rede the hytotiate pessue and loweng the wet abe win fra sound the man and, tha shar excavations, the holdng Yanks 3rd ps format levels zh that Thee shat be no water soopoge through the sikes of the >The _waler fable wihin the excavations shal be mata ote lew teed Wy uae 33 Ot Oe ‘Ay dewating requres win and around the main excaation tower te walor at blow to required fv 2 Contoing sue wate. 3. Collecting and saporing of dechayge water ganected by te ‘Sperton ofthe ofr stone ©. Contactor shat investaate the nature of tho ground and ‘he sub sail ‘Sindlons and koa ecessary step to del wi hase 2 por he equons Sha requrenents ‘of aly sister oufeies hang jrscton Pariutty the Exveonment Publ Authority. Siato of Kowal wich he Shaul eb stay snd sow form is Tondor pes. 12 RELATED SECTIONS A. This shee ie inended tobe used a hal Indeaton ot the altos ‘Meche inn the Projet Spctcaon, Ie ot neczesalyeeprehenehe Gr eampieie andthe Coase sporty fo cara I Sppios Soon requ Yo undertang th ful cope of work ronded. 1. Seaton 02250 Staring 2. Seon 02200, Eawork ‘aa, Saar, Eee Te 3 Opa densnaracne Honraon i Fanansn sp os REFERENCES ‘A. The minimum standode for prods specfed in tis cecton shail bo bnoudng ne under bt not na 10 the flowing” Excopt 30 cherise pected heron, pein wk ih accordance wi speciation, codes and andor ches “eran, and Dor lalest edtons, revisions appicale [Sodonda and soploments. “Where there le coi batwean Pe rfornced ‘Nandos the most sige! othe cotlonsrequrerans sal te appteste 4. CIRIA Report 113 - Cont of teunewater for amporary wor 8. AY apploable local cove, regulaons, ele of Autres having PERFORMANCE REQUIREMENTS: A Dowsing Stems shat provide dry, stable condtions for subsequent speratone min te excavations 18 eign shat ensure o cil amounts of snd or ster removed dung ‘vecion of work and) no domage” eceus to adjacst bang Srostres, sence, eter consuls or thet Work REGULATORY REQUIREMENTS A. Comply win and. confoem to Kawa Municatly raquraners, PW roqurements for MoS gash deep excavators, EPA roguatone ané fer Sppicble lca codes. Indus a costs fr camplonce an covormaton In ie Contact rca 18, Obtain all necessary permis connestn wt poss of water. 1A. Tne dewatering ofthe Main Excavaon requires under hs Conract i 10 be esgred end xocitad as the esponsiy ofthe Main Contactor. The {otowing ae reqred for reve snd soproval 8. Stop Drawings showing: 1. Type of sewatring, suface watar contol and carpe water Bloc / apes! ests sropored 2. Proposed arangements,wcatons and depts of the elents of he ‘rome 2. Equpment ond materals to be used and proceases to be aap Fred Oso) ‘ain Simmons gt om ‘Dasgn, Conracien Eau Furies Open — 4, Standby equipment, standby power supply. Note tet standby provasns ate to be growed as reqed lo ensue contuocs oumtarrpted eporton tha stems. 5. Measures to be taken to prevent damage du 1 cettoment of bias, rote, paving, her consuctons and sowecs otic the exceveton hot itn’ the fea afeced by dewetting csleltons forte design ofthe dewatering system etned Staten for dewatering procedure. Soni meta statement for teament_ of H2S _sndior other Contaminant Contactor shal ingude in te Teaser cost for vearnent FRetcng, "but ch ited, Meament works, power, clamical and "Show Record Forms: Submit propoced format or epecing deals of war escharge, ‘sunmitio he Conructon Manager and Engineer 2 copies of any requied Derm for depos! of water pr fo nstalaton (GENERAL REQUIREMENTS Insta Envronment Pubic Autorty aproved stom of 2 cacy to teat hyragen spnae rom level oun aught the BPA acceptable evel though {sppreved equpment. [A wotor must be removed in a manner to avi! damage to popety and Irinme masanes of menace 1 te publc nd mt complance wha les Thdvegusion othe EPA the MPW and muncialy 1. ewatarng asta and contaminated water eaten yom stall be fssgnad tod operated Yo prevent smcsion of H2S gas sauon to the anvtonmant stoves seein othe ules and egustons of te 2. The Contacor_shal_ eat the contemiaiad water pror_to Gscnage so tat 8 ish complonce wi EPA Stndorés and 3. The ested water shall bo decharged lo. stom water tanoge system hat has been approved by the Mriy ef Puke ore 4 AE water sche shall be propery tested so Dat 6 sfe and anise mae He, 5. Tne Conracor shall caniweuty monr the snesphere a the project he won HOS ie present Inthe ground Waar fo ensire thal EPA ‘epultors are met ‘sponcona Fananah Hes ns 48 QUALIFIED PERSONNEL ‘A. TheContector must srovide expesnced, qualios personne! to prom ‘A. Where cequred 10 do s0 by the Engineer, he Contacor shat establish 2 eocfed numer of mondorg stators as requred by EPA Tote aea of 1 projec at sto, whch wl be observed dng te work. shat bo oat as dee by the Engineer, 1.40 CONTRACTOR'S RESPONSIBILITY A. The Contactor stall be deemed to have ted the Ste pir to Utmeting his Tender apd fo nave mage a Necotaryinsectons and “hvesigatons and lowes ia Tender for he lowing a om 1. Presence of H2S and ahr contaminants i the groundwater 1st Tests: A. The Contractor shal conduct a Hyerogen Sulphide Stuy of te content of (29) in he” urueground. water and thal on te Infomation about ‘Sceertabe love othe sane at desea bythe Enveonmental Pubs Aur Sate of Kt Alte ols shal be tested at Kowa nse for Scone Research (KISH) oa ater aborstry approved bythe Engine. (vor useD) PART 3 EXECUTION 31 EXAMINATION A. Examine te a, te surounng vey, incudng srucurs, ad the dla ‘on eubeuroee conditions for determination ofthe Procoaures 3rd equlpnent ‘gird to perf te work of ie socton, 8. Condat survey an document condos of bugs wii se they to be Sfoced by dewatering” prior to ‘commencement of opeatone, end Shotgrach exning conditions, ening sreglates. 22. PREPARATION A Complte submits and obtin requted sppovas beer corenencing the “Ges cori, aoe Fos ag Ono Exon Fawenah Poet 8 Examine the Works and adic he Eglnear wring of any contions ‘Samaria! tote executon ofthe work of tie Secon. The ebence of any fen nofeaion wi be akon fo constitute the Consclorssooptaoe, tenon. 33. INSTALLATION A. insist the dowatorng_ syle in accordance win shop dawings and Shovoved” cpa sateen Kaepfhe Enghesr "sovend of any erorgor Fae fo acconmmedate fed cndtane end. on comple ofthe aston tthe dowstong. sytem revse. ard resubmit a-bUM shop eawings, 1 Opera the cawatrng systems ae necessary Lo lower the ouns- water Teva i excovetone to prove stabi, ay candions fot Be swoatucure fneustonscontnue dewstsing nary afe and below ary lee tthe Scot oe rotor “xaruons en ey soy, by avmargin of at acl 50%, Dalancs the hysrosate pressure Senorated “by he ound. wale’ atts ansceaaa moral love. The Enger wil dotermine the lining fe termination ef eperaton fr each part ofthe dowstoing system. The tempor tang wit sane of pts ei, at he Contacars expense metug subsequent sana removal ar cosing, Wl be onndored a8 2 means of pert sara trminaton of alee! dewatering ‘Slow level Prevent auto water and subsite or geundwata tom faving int te frcovaone or foodng te project sie and surousing ses. Do nl lew Water to seoomlave nexosvsone ©. uring the fal stages of excavation to west levels, end theeatr whist ‘ontnuina dewatering ensure the pezoete levels nthe ub ado ls shall be'maniained at less! 080 meves below te fal excavation evel fo Prevent sol dotsbance, he deveopmant of exoesewe unforced Enepoge giles, and peices of bearing supper Intl docs fo ‘montorgrounewaar lavels ung hs para to domonctte conpace wih {hese regutemets 34 MONITORING: A. Koop daly recose of ound water evel and ensue that i is ‘mowsined wah te spaced evel 35 REMOVAL A. Remove dewterng systems gas thereof upon complain of pation, 8. Cian and. make goad to the sattacton of tho Engines” any ems CSstureed” by the" ewaerng syslem —sabaons, operation and END OF SECTION erent To be reas wih Dision 1 - General Requirements, Coins of Contract, alates Techn Spectestons and sserised srawnge of hz Cora Comply i ll apleabe reauitemans, slandarés and codes spaced FI 2010 Gaanine or Osngn and Consruson of Heath Care Facts 14 DESCRIPTIONS ‘A. The Contacor shal demolehtiemantelssassembie al patos of works Inked on ravings snioe ae tled an ole" Conraei Documents ond Fomoveishage all Jebis and matefls fom the saab fequd and dump $Nibcatoneappowed bythe Engine. 12. SECTION nNcLUDES A. Cemolehitsmantessastentie prions of wek mated on doings andor ‘tote on star Document lo compte he new expansion wos 8. Romove'Sahago af deroiched mater as requted ©. Relocate ve ites where needed ster ottning approval fom stattony . —Satvege_ ard store material (any) as agreed wit) the Engineer and as Spprovedn the Mahod Staten ‘A The minmum standards for potucis spciiad in this secon shal be ‘hung at under tt ot ited fo te Slowing Esco az cherie speniied here pofom work accordance wih spenfstons, codes ane standarss ‘hed tore and thew nat edtone, revsons,appabi aden and ‘Stpplement | Were theres confit between the felerncoa tana the ‘most singont ofthe conaonarequrements shal be appleabe 1. ANSI ASSE A108 Sefty Requirements for Domotton Opratons — Berean Nalonal Stange "for "Consuson ana Demolition Operations. 2. NFPA. 24: Standard for Safeguarding Consiuetan,steraton and emotion Operators 3. 8S 5228, Pat 1 Cade of practoe for base Infomation and cedures or nse contol 4. BS. S226, Pat 2. Guide onic contol egiaton_forconsreton ‘nd demote, inulg feed consbueson and mantonanc, 5. B8.6187 Cove of ractce for demotion 8. Allapplcable lecalcodes, regulations eof Autores having ‘iwiton [A Mabe Statement Method satament fo demotion an removal nus the {eauence and the ste fo ensure no darupionsstutbance to Me uncon ‘tthe extng Hostal Locaton of saagesie lama Reston sd eoung ‘ot enning| sonics Lacaton' and consucion “of Barieede, fences and fomporery wor Saielypocosues 10 be aaopa,chacng andmontonng of ‘roceures A. Perform work aceardance wih ANSUASSE A 10.8, NEPA 241, 8S (87 and BS 5228: Parte and 2 15M on copy ofeach document on te. 48 QUALIFICATIONS A emolon frm: Company spectzing i perforning ths wo wit minima 5 soar documented experience. 1.7 REGULATORY REQUIREMENTS A Conform to Kuwait Musial and Environmental Potton Agency EPA) oder and reguatons of demolion of stustsos, cafety of ascent Srucures dst conto. run of conto. posal of exoaee sot: dp yrce {nt burning ot marie. "The Canrector most refer fo Manicpay Sey Deparment bloe commencement of any wore. Ctinn requ pats rom autores navn justin ©. Conform 10 pple regustry_procadires whan scouring ‘azardous of conaminted metals and depose at sppoved wise dopesal {rea and slow fora eelng at D, Wren note sabe gen othe Employer bore dealing er dsrupta any (Ft. cxtng busing. systems. io canes, stematve arengenents Spproved by the Engines shal be made by the Carico port ary changes {oho exng sytem ore’ ensure ne smoot unconing he exsing hospital without any darstons A Produce & programme scheduling he sla and fish date of te works ard tne soquense of operations ‘Scnaula work to conc wth removal of unwanted mata fom ste 1 ches, 8 6. Desorte denation removal pocedwe ‘Agee schon wih te Engner espn, Coneroton, Equant Fras an paral ‘Marian oina Egonnon ot arena Nesp PaRT2 PRODUCTS: a2 Des, Coenen, Equpoant Furie ang Operas ‘Manatee Epanon of aren Hsp! - A Provide, oret and maintain temporery barers and secunty cevees a locaton rected by the Engin 5. Loose, ently and protec envens tama, (©. Provide appropiate temporary nage, nsuding ext sons Conf prar 10 the demolton or removal of any Hem that al sevicos ‘Bova he proposed Works ana wibin he se are closed ane dsemneces DEMOLITION REQUIREMENTS. ‘A. The ute of exposes to breakup structures is net permite. Conduct demolition in an orarty and crcl maner to minimize inference eth ascent eeeupencis and ensue sala working enonver In and ron the st Conduct operation with minimum inelerenco 16 puble or prt. acess. rain Sr pete! grea ana access ino and around tho see ata ines, ©. Otis approval for executing work ther than By hand fen the Obtain wetlen permission tom _agacert_ property cuners and ‘eputor authori when demotion equpmontrowre, mings upon FH lonos thor property F. Spike ode wh water fo minimize dust Prove hoses and water ‘nna for is porese 6. Take cae atta overwat. 1H. Disconnect and grub otal assoc serves, dans, ducts ant he ie Lease operations immediately asacen stuse() elements) apes: 10 be range Netfy be Engineor and te ala haveg Juteon. Do not ‘esiane operas ul dete, J. No accumulation of debra! rutbeh from demotions wil be pemite ether Swnin or ute te projet he Remove all unwaiad dei. abtsh tlm ste end dump st lecaons Soproved by Kuwat Munially and ince al cost of velng |. Maintin edequate uber of uch avaiable Stock ped excavated matril not ox ; To 23 DEMOLITION A. Disconnect, remove and ap and entity designated sores win demotion 1 Careluty remove materals to be ronstaled o reared 1 prent damage ‘Store and protect. ©. Provge susble and adequate eupport ab spsroved by the Eminoer befor ‘demotonsismanting of dassensing enyporton of work D. Remove a debris o approved dumps Backlit areas excaveto, open pts ard es caused as a retul of ‘emotion to he clsfcton of he Engine. F. Rough rad and compact seat acted by demelton to mania ste grades nd somours ae need on he dawns & oot bum or bury materi on ste, Leave se in ean onion Ho Remove allomporary work at rected by the Engng. a, Epa Fare nT Opa Bains ‘one Epanen of Fevwareh spa wanes ¢ SECTION 02260 [EARTHWORK SUPPORT (SHORING) PART 1 GENERAL General provision of the Contract including requitements of a Contract Documents ha ppl to this Season CCompy wih al applicable requirements, standards and codes specie in FG! 2016 Gudeines for Design and Gonstucton of Heath Gare Facies 4101 SECTIONINGLUDES [A Provide al labour, mate, equpment and services requ fr designing uihing, nstaing and ‘manning support syst, including tebacks ei, insta to te Sepa mute fr te Suppo {the perimeter of te excevaton and acacert tes and facies. Submitesin, caleuations and ravings for be Engines approval C. Provide adequate supporto structures, svess, utes, sdewaks nd ther faci within the Mieay of tie excovauon 1 peoct such Tacites eganel damaging movements or oter eects of 1. Provise sue focusing uncsrining of wats of ajacnt propery shoul ths be necassary . Provide sop cranings forthe supp sytem forthe approval the Engr. Continual inapect and monitor te pevfrmance ofthe systom and epot ngs tthe Engine 1.02 RELATED SECTIONS A Sectonzz00 anton 103 REFERENCES AND STANDARDS. ‘186-2006 casTi 04 suawrraLs |A. The Conracior shat submit for approval speifeaons and instaton meth ‘teal used neha con hi menton fo comply wih such fequrements foreach tem of 8. shop cravings showing overall plan layout ofthe system Inca clearence fom existing and proposed utes, srusures oor absvuctons.Indeato Ma dmersene, rater properie, Iceators, and spacing and penetiston cepts of all members and the oats the varous pes “Doan Cenaracton,Eauipnan Friars a Operas — Maonanc forte Eason of Fwansh Hess 6. Weltan dota and caletstons showing te design Inlet for te suppor syeems, to node ‘ginaorg clalatone ara dosgn ssumptons fr detmiation of loads an ateress acting oF Snduahin he seal support some ©. As-buit infomation forthe lateral suppor syst incang 2 deta as-ult saton plan f al ‘amber showing donfeaton sean, con lana ha top and excavaon evel or esc ‘member engin and top slevaton ofeach membe” supper lve, can of walling, nd ODet ‘Steplemonianymerbar ‘108 QUALITY CONTROL, ‘A Examine the se and mantor as work progresses and reper to the Engine any probioms Tavngdovevenaefecs on wor of ie Soto 8. Cesgn earthwork suppor veugh 2 Structural Engineer wal epaionced inthis war an submifor Spprval ©. The Contractor sha rove personnel gulf by taining and experince fo execute the shoring . The Contato shal bo reesei for making prompt and coniruous evaluators ofthe suppor ‘yolem peforance and whenever necessary tating trmedal slaps coed ar Jeena. 1100 REGULATORY REQUIREMENTS. ‘A Work shat comply with al us, rogultons, laws and rdrancss of al shores having yreeson 18. Obtain a necessary perms. Oban wien permisan fom adoring propery Enso nln ‘he Employerunisetes whose works and fies there may D8 Proposed ear of te back Srchors wit pret beyond the vorcal prechon of the cristae, Submis permisione ‘Sin otop crores: PART2- PRODUCTS 201 MATERIALS ‘A. Stuetura see ute for shoring ane racing systems shal be cesgnd in secordance wh ASTM. 15. Timber use for shoring and bracing sytem shal be in acurance wih BS 5268 Code of ‘Concrete sod for racing sytem shal ein accordance wt ACI S18 “Tisback london rqured sal const of ether high svongth bas of roupe of we sand eatin ‘suum and capstan be propoues bythe Contacte . Cement srout mates nd admits for back anchorage sallbe proposed byte Contactor spprovalctine Engen See SIRS TPSTAGT Sa Equa Far rd Oowatons ibe Spann of Pewaran spat SECTION 02310 ini @RADING PART 1 — GENERAL Genera provision ofthe Corre incidng requiemens ofa Contact Documents sha apiya his 1.01 WORK INCLUDED | Landecaped frie grading, ing al panied ares and extriepedectian pavements PART2-PRODUCTS: 201 TOPSOIL 1. See Section G2610-SOIL PREPARATION. ‘A Frosh, pt, clan. 3301 MOISTURE LEVEL AND SCARIFICATION 1. Aa water o seat fil mera a egies each comes mest evel fr compaction, ‘Scnlyal ssbgradee pro itn and compacting 3.02 COMPACTIONMETHOD ‘A Por ASTM test mebedD 1587 maximum dry dency, {Paved Areas: To 85% upper Deh. below trish grade 2 Planted Aas 80-85% upper 100m. of Born ae fl phot aisog pater [A Grade emo and norma ol preparations completed, Round of tps anos of Slope. Prove poste dramog 15. Tolerances: To wien 2 en. of we rade as par he roquromonto th Conic. nn Say “TRENCH EXCAVATION, PIPE INSTALLATION AND BACKFILL PART 1 ~ GENERAL ‘Genera provision fhe Gnratincuing requtemens ofa Contract Documents allay otis 101 summary 1 inl Gacton spots wench excavaton, ips inetaaion and backing persons an ines, tut I nl reso tho flowing 1 Ganartragutement 2 ‘Stomitale and samples 5. Gummy cosa 4 Granular pipe ouround 5. Gonerote pipe suround 7 Geotnte abe 5 Benee markingtape 8, ‘Sere protection ducts 10. Marte posts 12 Temporary fencing an fapona 13 Trench supper and sab 14 Poe natanaton| 18 Baoxtng| AA ctions flected by th esction end all stone atfeeing the section eal te considered “etd Sections [A Product manufair, tng and station shal comply wa the folovng referees, unless ‘heaton species 1. ese “Testing Agente. 2 esisr7 Mstnode eet for Sl for Cu Engineaing Purposes 3 Astwoase1 > Standa reciee for Undargounanttaton of “Thermoplastic Ppe for Sewars and tir Gravy Fo Zevtoatons. 2A The alowing deters sal portant words or phases a lize in tis Secton. 1. “Trenah excavation” means. excaiaion inal maferale of whatever nate encountered for ences into won pipes, sic cates ae to be li, er appuonancos core od 2. “Piper means pipe o pipe, bends, age, junctions ard eter specs end fies and cues ans, ning pits and mates ‘3. “Formato eve means te designatad baton oto excavation 4 “Pipe suround shat mean that materi! which i det bol, around and ‘hove the pbs. *MOD" ena mean maxenu dy dest 6 “OMc™ stat mean optimum meleure content “Stank shall mea conette bares paced in ranula ip suround “Aapomerstd pares" shall mean a number ef ial pails gathered intoa balor mass, 1.08 GENERAL REQUIREMENTS 1a The’ Conaior hat fumien, before commenciment of Sa Soa “Tne Contactar sal compl wit the allowing requremeni, unos oor sprees byte Eraioo. No tovs or subs shall be dubad witht the writen consent of the Engneee ‘Basing ie rot pemited [At works thal be perflamed dry condtions, mained in accordance wih Teaser Documents, Continous temporary fering sub f0 potct he general public (parry ere) stall be prowloe a enicne tranches and excauons oraledin faa ban fea “ie Contractor shal fly suppor the sige ofa Yeneh excavations, unless hess are Seppe Sacks ete and tle slope Showing i ceats ‘of the sheet and brag he proposes fuse, together wih i rales fatale prepared by 2 quale tect engioe Wares Corratorpropocos to excata wih slapped se slopes insiad of proving ‘hosing, shoring, t,o Contacto shal fumish a sabi opr pepe y canter som rghnslngte’ wiht relvenescaatons somereting be stan fener Fovercaiaton worr shall commences! te Enginars consent hasbeen cies. $Schangor shal inno way eee he Contato fom ang! is convacta ebigtins ond responsi “eal ol set be card outs nacastry, 6 conte esting St cantons anc detrmin exact Ioeaonf ties or oar sbtucsona ‘Eicnatne shat be eared out by hand where equted or istuctd by the Exper, 0 locate Sand evo! damage fo ties encountered dung he excovton Werk. Line and lowel ef torches shal be 2 shown onthe Cravings anaes otherwise ected ty te Engines, before commencng the tench excavations, the ru a the Yenc shal be pera ot ceraay ad ts eg rnd nel surveyed ond record. a grees th hs Engine ‘The meth uid to maintain ine snd evel of posines shall be subjcto the Engnees apo {FSectuctors se ercounered dung exeavaton, he Engen wllate neserery changes ot ths srawinge snd aus te amended drowngs tthe Cabot ‘he Conrasor shal not make ary sevaton om te spect tines or lve, winou the writen “pproal ofthe Engines Tie sted bythe Engineer, any devon propaeed Inna andor aad, slong wh any ‘astorl hs Boeke, vas and vacuum assembie, Sow of sseeblss, ea pipe ngs ‘ennols or ee apputenencee whch maybe ued na ba athe cost ofhaConaetor ‘When te work is oied out sacar oor ates th in feising servos, the Conc shall Dereon or maining al seat and uta. |The Corker shal rode al neceeeary supper singe l0 mh exstng Soros, ule ierwteapreedby be Engineer Way" tes ne descbea ar damaped, te Contactor shal enmeitely ry te relevant ‘The Contractor shall at undertake eps witout he authoraaon of he concerned auihey ‘Mies for auch works salle ate Contactors ean. {traps are cared out by te concemed wiky shy, the Conc hal mtu a costs ‘elie to such wor [I excavated terse shal be used im he BOIL unless the mtoril found To be ‘saab Fama sd Opaiol Casas ara Hott 1 able excavad mati nl dieeby oorporated in the work shall be sckpied frre: (hein areas approved by Ie gies. Sel uz or andeeapng or agua purposes el be socked separately © Unoutabie materials habe removes and posed of y te Contato a his om expense 4 Any temporny slope tngse te tench excavaon sal be lo ssleslooe ond eights timen sna be deposted nt manne to sv sty damage and 10 caus a no neononnce 3 possi, he abeening of excovates tenon materl wil not be permiled on ste, wthout the wren pprovalo he Encino 10, Amininum ear cariage shal aay be mitained fr vehicula ta 11, Boom othe tenes shal be propedy tinned of and compacts to pews 3m and uno 1. Toor or out sols enccunoed a frnaon ee such material shal be roves 3b rected By the Engine’ an tepuce wih te cobgeted ips suroundmeal 12, Only approve granular pipe suround or approved concrete pe suound mey be ied 36 ‘edgar aunching othe Be 1 Php stall be paced rene surcund uno thorwiss noted 18, Trench excavation shal ot be parm ul ba pips and Sings to be ln he Hee ae avaible con Stee eng of excavator severe poe ayeg ay be eb Eng! 14 The minimum tronch width for single Iie pipes shall be 8s adcatd on te ewngs, ness hentisinstucea by he Engi 4 Mist spacing between two o mor pips nthe same Wench ld a pra with ima iver lov habe scm Minna wench" wal fo conduits. and cables stall be made i secéance wan te ‘equrements ofthe revo ly aha. 15, the Engnsr considers fat te Contactor not comping wih the eegongguements, the Engnoce may nt pes Tahar Wench extavaten un hale eaefes wih te pe yng. ie {ext and batiig of he xcaralon. ‘Product prov 1. The Contractor shal submit suficen inomaton the Engner. prt purcase, im orto ‘ory eampiance wth he spectestens. Such intrmation etal nude test he lowing © Suppliers name © Product name ppcable) 4 Predict descr 1 Manvtocrrs octal ata £ Shrage instructions 6. Appeatoninsucions 1 Sebplere nme (orow materia) 2 Borew tiacatan Matt ame i aptcabe) Borawnateralseserpion "abo ana on Ug ana Past Lins ‘Sve arate Percentage of water soe sate ‘Testrsuts as quested by to Engineer. Samples sta be suppitd la sutfcent quanttes for at Fequesiay he Engine 22 folonng produc, Fa “Dana Comat, Eapna FOR ans Opes Tina Gran ppesueround Soren praia (requ) Excavator requesoa) Buies maung ape Marr ost ‘Tempera fenong Contac aop9 ‘Sampling of ss sal be conducted under ine Engineer's upenson. Method Statement “The Contador shal submit mehod statements mang the requremants of he “Tender Documents re flowing ectvleso 0 feqeste by he Enginoo. Deveatern tae (ree) ‘Temporaty Fenn as resus) “Ganeratreneh Excavation Pipe nator Placement ot pe sound Placoment of backl ard compacon , Shop Drawinas 1. The Contactor hal evo excavation dating forthe flowing as 2 Exeavaton deuinge Sawing peal dewatering, lompocary Teng and peal uch cose clone ehowing screed slope ses. Shop rewingetarany shen pig, racing o honing Special Reports 4. Siblty inveetgatons ond repo for stopped or sloped excavations bys quale geoiechical Ergot 2 Design cleaion for ary bracing. shothg or shect ping required fr ecavatens,by 3 (uated Engine |. Pf patch rm the factory, the Contractor sal oly te Engr, sunt tne 0 alow Ine Engineer of Ms repesentabes fo hapec and ost reduc, # so dstod. ‘Aa atatns sabe made wit Irepecon Reqs’ sertece ‘i Tender Doc 1 hn'aovancs copy maybe axe the Engineers fe, ul teal must re oe the fehedled day of nepocton 2. Minium notion tes shat 8. 2a hour on ste 8 “inspection Request shal be submited to he Engines curing he one italien work pa to proceeding wih at ect the follwing ste Minimum plea ime shel be 24 Nowe 4, Stat of exeavabonin new 03 Nortarane rhe za ewan espa Casting of nig concrete or cement of bedang Pacing of pipe suround or easing of conte suround. ‘esing Laboratory “eaing of all mata shall ne caries cut by 2 sully equpped sto labastoy or In an Inaepondentaborator as docrbed the Tender Document. uring to course of he werk. tests shall be cai ut unde the supervision of te Engines: ‘ery i mater, ana atari uaa Determine compactoncherecerstis of fi mate Determine mature carer, ana flé sent ‘Toe ‘slowable 2 beang tas anal Ge vafad by dynam cane peneraton tes or ae iectoa byte Enea ‘eterna camsaeion Facton an rang granu pe sure [Contes tats a pected Secton 02300 ‘The Contactor shall malian a day log of all toss cared out for the Enger ee 1 Compaction tess to, extabish maximum ry deny for at sols shal be ciemined by 8S Sri Pansetoo 3 8 ‘2m atu danaty of compacad sole shall be deemines by BS 1977: Pan @ Malncd2 1022 (a8 ‘peropnt) 3. Gone panetaton at (TRL Mathed or BS 1377) 4 Compactanfacton er granu suround sala determined elon E Delarminatin af Compaction Fracion 2 represomathe same of pipe sureuné material (leas 25k) shall be oan, nde the Engineers supersan 2 peparatusRegures 1 'an opan endo rip cyindor 250nmmm long an Somme inert ameter. B. Meta rammer win sting Taco of 0mm el 20mm and weining 400gm 0 10am Staghtedge Rule Balance rina 12k capaci 3. Teatiteios 2 btn @ epresentatve same more han sufcient lheoyinder about 12k) ‘Ine mostre content oe same shl not sr svi rom tha the ma body of mata Hold the ejnder rl down on a fat erface fo prvert movement an geny cour the eae Ino tem’ hoght oF approxima Som above the top! the cinder, ssly ans witout ‘emai. «Sta of he op sutace level wih ne op of the ener and remove al ups sie materi 4 Lite oyinsr op clare contra an lace ov a an mea ater the material na place ne quar of he metal back into the ying and amp vaorousy tnt ne fer compacon canbe cba {Repeat wit the second quart, fampng at before and so on forthe tid Taming he rs svace a ve os posi 19, Measure down fam te top of th yindr 0 the sure of the compacted mater Die he measured tance by Be hight ofthe ind (moasurd tothe ners rn. 1 Reporttevaue ashe compecton fecton tte neorest Ot fourth quart, ‘ang Gain gm rnin dean Saga Narvacans re Renn sa restng Densiy tess sha be made porto removal of dowsing systems. Contactor shal ads his operations so 0 peri time to ma uch eles as maybe requestor sampling and tsing, 3. subsoquort ayer cannot be placod unl the dens ofthe prececing ayer hasbeen eeted and Seproved. 4. least ene Feld ens test shal be conducted in each layer, or every 100 rear mates. of pe Wench tacked. uness oferwise. apood by the Engrs. ‘5. Al eat one fil dency lat sal be conduc foreach ae, accor to sac uct, unless ‘thor agreed by ha Enger 6. At last one compaction tes shal be conducted for every 30 eld dens ass conducted, ofa {rend bythe Engines to changes thes 7. Testing fequeney for be suound mle all be as dread by the Enainaor 1106 MATERIALS AND PRODUCTS. DELIVERY, STORAGE AND HANDLING tests and shales and |. Dalvery, storage and handing shale according fo the manvlatuze recommends, geet mh etn prone: 1, Transports, handing an sloage shal tall ines be gefomed Ine manner avo product samage 2. Only non slog sha be allowed fo iting ros. Sine chains, camps or ctl shal ol be owed fr iting purposes, unless approved bythe Engines. 1. Ste etane or cates maybe allowed for secuing rode ding anspor or dora, proved protcive pag or tnborblecking ule. 83. Do net store produ dec on ground, loss approved by he Engineer. 3. Encure etal moe Bock ute prove auicen spor nar produt manutscrer recommends storage unr confolos tomportures he Contac must" powde on encoses, ‘routed, cool fe mariahed. athe proper temperature (recommended bythe manufac 24 hour day stored outside, cover products o prevent UV deradon, as recommended by Ee manufacturer. ‘The Conrector shal visuly inspect products won dalkery ard report ay damage 10 the Engineer 1. Any produce damaged dung delve, storage o nstlaten shal be mara the Coico and b.Propoeis for rapa of any damaged products shall be submited in wing 0 ne Enger fo approval «No tepals to damaged poduts shal be stampod witout he Engineers aproval 4. Any damages products deemed unsutole for repair by te Engice shat Be fenoved om tla nd repace atthe Conractor expan ‘Sol stall b stock a obo: Atleast 2.0m away rom eo tench Granular pipe suound smal be stocked in sufient quanties and na nanner to avis Storeeton an eoniamingion 1.08 SITE INVESTIGATION ‘A. Compiy wth ahe Tender ocuments. Parr 2- PRODUCTS 1201 PIPE BEDDING, HAUNCHING AND SURROUND MATERIAL |A Granular ate! tal be free dang, hae clean, chomleally stable, cnshed sopenste {ier of aggomerted paces, mesng folowing requirements, unless pres tare OF thoenanoer 40mm nominal ifr pies o0mm Sameer ad ss. 2. Maximum pail size: 16mm 3. Maximum peerage passing Sm sieve: 10% 2. ZOmm nomial sfx lps over 800mm ameter 4. Maxinum part sie: 28mm 3 Maximum peerage passing 1Omm seve: 8% 3. Minemum compact sha bebo. Cranuar pps suround for fexle pee shal be Clas | Ain aecrdones wh AST 02321 wih rnin compaction io 90% ‘Sic sandy ao! sal be clean native sand feo of rocks, wegen, foregn materials ane large opyrgete pices of sand Natural sot boding shal be cean excevted mate! fee of racks and fron mato Conerea poe sound aha be Grade C20 compli win Seaton C3300, 202 BACKFILLMATERIAL A Sotable material placeé sbove the sige suround for ganeral wench backil (ot within paved Tooduaye or paved posing areas) shes confor to the folowing Yequremets, sess terse tpproved by te Engines 1. sama pte 750m 2 Lua Lime 40 Moxa 5 Piateyines 10 Manna, Brine Seco’ mature deemed to be uneutale or nsuficnt, or general decking oom mateal(nonload beading) conforming 10 requre requrements shal be sizes , Bak mari ew rane or pang areas Sal be aprovedsb-bass or ead bee matt peed in Yender Documents AG tls or gran pipe suround sha comply wih the requirements of Table 1 bbw, ures here aprovesby De Eine 8 The fe salt be wow a ror-noven cone chan ett me mans oa tamed ne clable work. such fal the Haments or yar elas te ete poston ach othr when suerte oe pcposed use wh he leno pital cheracoretes regres, seapecieahoren ©. The ge orl shal be nto cormony encountered chemicals a he sland wer and shall ‘Getsbran ls voit snibtor 1. The Contactor shal powse to Be Enghoer a corse sang the name of menace, Product name, se number, chamiol somposton of amen ory ané oh print ‘ormaton ease uly ie goo tx. Geo torle shal be subject 12 samplng and testing, © very conformance with the perscaon. 1. The equeny of theta sal be as dace by the Erg 2. A samples shal be cole end tasted inthe petance ft alabontay aproves Sons. YY Wa gE; by he Enginoe. F Eoah fot of gto tele dlvere to the sto shall cons a carifeate that the matefl isin Scconancs win maufachresconieon (Each ge teal rot shale wrapped wih 2 meteal hat wil protect the ge txt fom damage eto shipment water sunight ana comtaminans 4. The wrapping sal be mantsined dung shipment and sora H Geo toxtoe shat ba Tereponse ard stored In accordance wih the manufactures 2.04 MARKING TAPE (URIED) JL Pabnone pats pe wh metalic race wie or mea tip fr leon detection meeting the fotowing enters 1. Color Yalow of rected by he Engine 4. Minimum angen! teste svengh 0nk/se.cm ‘5. rimum ongaudna logaton (teak 300% “Sewage, “Storm wala” “Tested Effort’ as, appropri. permanent tack latoring {Gomm height and 20 meter pag fo He erpntes on te ape Aabi ard Exp 205 SeRvice PROTECTION UCTS. | Prtecton dts sha bo un aries pony clr (PVC pl, minum 10nm dameter. ‘Apes and fing sabe new and une Pipe shal be fos from vible craks, oles, forign male, bites, deleteious materi, ‘writes and sens 4. Pat pipe aha te delvered the sein unbioken buns orl packaged in such a manner 5 fo prod adequate prucion to Pipe etd pipe ons, eter Breaded er pa, Yom damage or pesto suright [AY plas pe ftings 0 be inealed shal be mauged Minge, manwacted om te same ‘trie fe pipe, and salle ph pe wah neoprene tube gasket, 5, No ste made ben il be pamites 208 FILLER BOARD |. Filer board zed fom dscontnls in oneras pipe surourd shale one of ftowing 4 Beuminous ber boar 2 Siytoam, 8. Atraneieree expansontmovement jit that ne proved at each pipe jot of compressble ‘pandan jet file, shapedexaay to he shape of he pe aha he fl extn the crete. Uae detaed othervite on th ravings, the thoes of hs pa bea allows Pee upto 200mm nominal diameter 25mm Pes Sb! 600mm nominal ameter SOmm Pes 60! — 1200mm noma damster- 75mm Pee grater than 1200 mm nmin! dimer - 100 ym or eters spate 9 sens For slg and socks ype pps, the expansion jin in he concee shat be aligned wth the fe6 ff be socket. Fer flexi detachable seve type ja, the expansion lr marl sal be Postion ‘on on sce cf he couping se sown onthe Grwnge, bl the ar ana eonctele Sed Ersurround eh ony be placed aher he appcatan ofthe spect cotesen prevetion sytem fas been app to the pipe end nj No ste aorcemet shal pas fog he CONTE ‘rpencon jor hs pr MPH requremers A Pipe wrap placed sound pipe jonts sound ppes at stank shal bo sutbl so schosve Wateoat mambvane rata a-ahesve tape as approved bythe Enns. PART EXECUTION 301 TRALHOLES [A ial las aha be excavets wall ahead of te tench excavaton operation lo dep sien 0 niamine the sol condone, sna conn’ te locaiors of undarround wis oF oot 1. The Coniactor shall range forte rellg and reatoment of tal holes Be cared out Immedtay ater be rozurosineraton s obtaned. 2. Reinstatomentet val hls shal be approved bythe Engines 2. Excmaton and rensisioment of Wil Hoes shal be cared out atthe Contec’ cost |. At achiies shal be cared tin dy cantons 8. dewatering shat moat the roqdroment founda Dewar {303 TEMPORARY FENCING AND FLAGGING [A Continuous tempocay fencing sutable Yo protect the goreal_puble (paeulaly chen) fat be povided fo encoes a renches and excavaton ino nou aah ates “Temporary fencing shallbe rove a a enact othe Cer Temporary fencing shal not be vamoves wenau he Engrs pemissio, which wnat be ‘ont ine enh excavation hss boon compile ries be provides song both sides of uenses inal or fe The Contac sha alo provide fr the sett of animals whch may gain anty tthe constuction tz and shal enaure a i open exzavtot, sense roves ard soon or ose hopes fang ‘fom the Contac opeatone are adequately fenced and pee ‘308 TRENCH SUPPORT AND STABILITY 5. Undepining, supsots of ther potcion measures requrd for bugs stetres ané Spparss of adornng excavators. sh be prone by the Conary aparoved by he Engneee . Hdraced byte Engler, « method eatement shal be submited bythe Contac fr the Engine’ approval 5. 1 for any teaton ny potion of the wench excavation sal ave way, the Caracal at ie ow expen, tats noeesaryvomeda mesures, meu he wxevaton 2 eo a Sai thrsby sano 2. Whore the Conair slots (ane is permite by the Engine) execle neh excavations ‘wh stepped sou inland ef prowling support as aforesaid, e topped ss shal ony te [rebated to sable Slopes and eights se Tocommensed i the Contactors sproved say ‘oper 1, Maximum nig of any ep shal be 1.5, 2. Naximum hight wet rae of any sep shal be 1010 1.0, ‘When enceving fo sessed formation kes of to spied ims, the Cortacor shal not ‘rcavala ela 150mm url meds before cammonongconstucion wor, nies erie lperovoaty he Enioa. 1, the Contractor excavfee te last 150mm bala he ie ready or abe te conmenea the work he maybe requted io remove an paca adconal mate = srecedby he Engioe. 2 Any uch Tater exeavaton and repacemert of adaona found ‘ae ordered bythe Engine shal be a ho cao! ha Contractor 18. Shou tm ronch otom, while sceapiabie tothe Enger at We te of Ne inspection, Eubrequontysacome puaties, ote laose de 1 expecte or dng during to pretest of ihe’ worms, the Confeclor shal emave.soch damaged. sere er loosened atarala ‘epics wih approves mater dese by the Cron 1 ay seh futher excavation and repacament of dona fundsten matoral ordre by te Egioar sabe athe cat of he Conrac Any stones 2 fre eater han Son ns sha be picked out of he tench boc, ‘ayn formed sale dw sabe mates a nme to he Soro ve 1. AW shat and ose maa sal be removed from the boom of the wan xcauaons fe thatthe pipe surround rests ona sold ad lean fundaon. “he vonenematton shal be compact oa minum o SS MDD as dotrminedby Bs 1577 Part Maou 3.86, ules otherwse aprove by th Eng! Ina denty lets sna be canada 88 a0" Pat 9: Method 21 of 22 a8 appopate Oe TRENOHWIOTHS FORFLENBLE PIES. ADDTIONAL REQUIREMENTS ‘esause Hexbis pipes ry Inpro te traundng aot en! the development of excessive ‘Sefetons, maybe nacseary, where tanahes pans tough sl rund, to nea the beret ‘hand feptce te oft nate Sl wth iprtd matoral of odes oer asses Ime The pipe Steton. AN such measures shal be cated cu athe wok pceds an The Contactor sta be deemed hve ins ote cat fal auch work hs Tenet 1, The Contacto aha cary ou m sf measurements fo eetatich the deformation modus of the rst soa the nsielton leva of he ips ang Sale fs Penetromasen hance ot Meioun wench wits sal be i accordance wih the Type Orawings unless such penarometer {ests ndete arog of fst tan 8 Kalen fr th Rave sl than ono of te ffowig fom {tconticton shat be enpoyed. a aprad bythe Engines: The Convair sal be Geomed {@ have ncuded orto cae fa sos workin hi Tener 1. Conese hauncting shall be provided between he lps athe wench wal 2. Trench hesing shal beet in place talon a lee of 200mm above the top ofthe Be 8. Precast concrete (er other approved materia) slab, having height of S000 oF one pe ‘Sameer whichever gear ahal be placed vericaly Inthe granular besa ratra the Sie fb pipe msway between he Sos of te pean often 4. Ae an atematve to any of the stove measures ware considerations of ealable space Prastcalty and economice fermi tbe Wench wish may be erseed to at asi De minum ‘ue abana tom ne foloung tb “Trereh Wish Ceara for exe Pes State Cone Persrorsete iam Tench Wah ae fee seen Sx Pigs Daler es an 03 Pps Diameter ae an = Pips Dame see han 0s Pipe Dslr seston = 5 Pipe Diameter see an Eo ee Diameter oes ‘er nan wie enh normaly be esos gorgicessexcwvarion ‘cars sal be fan prevent xoses excavation beyond designated elo nts {t Kayenoats excavate fom he Soom or sero he tench ae be Hed wih he designated ips ‘round matoral unless oerae approved by To Ene: 2. The Conretr tha was orrmove tom te She sf material reauing fom exces xcaiaton, 2 ny acon cost det over scsuaon sabe athe Conocorsexpnee. ‘308 SPECIAL BEDOING ARRANGEMENTS qual or les han 3 kp a constuon ethos A. wares is desma to be unstable, spacial arangements ax mentoned blow, maybe equted bythe Enanos ‘dona sis vestigation ard anys Replaosment of Uneult sal by grand filo conrta Solimproverent metho Pag oundstone No saci rangement shale made witout the Ena approval 1309 TRENCHES NOT TO BELEFT OPEN |A. Trach excavaton and bacfilshl be eared ou expetous 1. fling and sac sinter of vere excavations shall be commenced a completed oon at ressanaly procleabi lar he pipes have Boon ou an rea 2. Ppeloying shat flow ocey upon te progress of trench ncaa 4. Contactor shall_not permit uneasonaby excesshe langts of wench excaaton to real ‘pen ie awasingfesing oe pine ‘Dasign, Conan Equant Fura até Coston? inns riba Eggs aren Hsp 1. Trench excavation may not proceed more han 200m ahead af he pe lying operations, noes approved otnewen by the Erne 1. The Contecor shal fhe pecauons f proven otatn of pipes ination wee open rereh Greavatons may become fooded. Tne may ince the para fllg othe Wesch eavng Be [ont exposes frtots fhe a,b any ahar methods aprove yt Eng 4 i Motagon nae occured, he Contacte shall remove ant rplace the pies afer dying he "nah ness ethers greed we he Engine. - ite Engnaar consiers thatthe Conacor not samijng ei any the toepong ‘ogoroments, he may prot futher ench excavation Ul he 6 ststied wi he progress ot [Sing an ating of pes anit of wench exavaten. S10 PLACING PIPE SURROUND | Pipe bedding, nauncing and surcund shal be ofthe tye shown Inthe Typkal Orang for "a pipe ard fob pipe one atervise speedy ha Engroor 12, Suet Saray Sof Pps turound shal ba placd ae Yale wen reqed by he Type! Drawings, unless eters approved byte Engiec? 1. Selact Sandy So ena be placed in shlow kts apd compacted to minimum pean! MDD. 2. Care shal be taken to provnt movement ofthe pipe when compacting and surouné shal be ‘oughta on each sie ote pe eau. Cc. Pige shaun be bedded mn Natl Sl nthe Typical Drawings shall be set 9 2 minum of "omm tuck be of Natrl Soi Basing ah compact. 1, Bet hols shal be provided ener al he ip bares rope Supported 1. Granular Pipe Suround shall be placed a folows when vequed by the Typical ‘raving, untae oberaie approved by be Engine bpproved gee texas be pace compe round a rel pipe suround ‘Iharonet maton shal be smooth ante tam dai ‘The go lati shal be placadoosly win wines roi Void spaces shal ot beet Deteeen te. go sti ard gtound surface. Sccossve sheets of geotestio shal be bvetapped 8 mrimum of 300mm wth uptean Sheet ovetapaing the downeveam shee. ©. The geo tot shal be faded ovr ep ‘mim ovetap 3 Dom 1 Tt go tox camane cng nstalsion or aggregate placement, ge texte path shat be Pisced over the damaned area ening amiamam dance of SOO beyone the damaged soa . Pracement of beng material sal proceed medias felowng he placement ogee tele suru mater in & manner posice & 2 Granular pipe suround shat bo placed aos the fl wih of he excavate tench 2. eft pte ane bot oho rch excavation hab amove a a dpi of S0Onm esl ‘round whichever is xeon the resulting vols hal be boca wih aporeves lanl ips 4. The Bikness of granular pipe suround shal be mm mismum, below he piper 5. Granular pipe surround mato shall be compacted n lye ot exceeing 5oomm wn meimom one past of pie vrs or eth approved equvant mectalcalmetod. ‘2. Handtampng sal on be peril where maui space savaabieto alow te use mechanical equipment ‘Granular pipe surround habe brought up eualy on bot ies af he pipe and carduty ompacoa inyre rot exceeang 2000 Panase , Enowra pe auround isn contact win the indore of the pipe bate, 4 The pipe Sueound mteral shall een oat least 300m above he eow of Ps 6. Partulrcae shal be geno avoid amage opp og 7. Granular pipe suround sha be places around tne ppas enmedktly str enng. 1B. The placing and compacten of bsckfilmatersl shal be carted gut i squence wth he Temoval of renen supports, noes tho Conratoreiabused by the Engineer 2 lev them piace Concrete Poe Suround: 11 where indeated on te Drawings oF ordered by he Engineer, pipe shall be ented wih Grade [Ch conrsen sezardane win the Seale show onthe Drownae 2. one sa te pla ui eon en ro Be pe heb an ti ari eal be wrapped ‘wih sabe aa adheave membrane a eas 00min we, Proven rut ety ea Thuan ahs be nly supported above the trench btm on sesstwepuposeult procest once sade {he locke tale a accurate and eel and core wth “5mm Dick walrgeoo shooting Bone he pipe Del or two hard wood wedges of Seprved pator. a Conerote shat be placed in sutitant number ofits © rovent trom satiny or Tne concrete sha fret be paced anor ss fe pen eder to ba weksd under the pipe song tl lain feral no vols eve Theos shat hen be brought up equay on both ses ofthe pe unl he requred level irreached 4 he suround is cat none opraion, messes shal be taken osacure hepa tom Matng ot ‘movag, “Tass measures must be approved bythe Engi pot th ia ofthe epeaton 5. The consul of te concrete pipe suru stall be broken at each jt, uns oferwce Approved ye Engr! 6 Diconinites in concrete pip sound shal bagrovded over tor fllcrosssectona area at (20 pp nl wah aporved thar beara 1. Thetheknes oir oar shat tam for pipe dametertous than 450mm |. 36mm or pipeameers 450-1200 Som fer pie dams rst than1200mm 7. Cara conereta with pojhane sheeting fora last 26 hous, medal ater placment {341 GENERAL TRENCH BACKFILLING |. General wench backlit eras ove pave roadways and paved pag atcas. 1. These areas ince, bal ae nl kd fo, snven corrore, landscaped sea, undeveloped es, ron-sphatog aes, los, ays and a pate ans 2. Backing of wanchas shal commence 38 soon a8 paceable afar the ppe na works have been ‘compa sled ana approves be Egias. 3. No fl material shall be placed and no campacion shal be pormited again to concrete ‘hrutren, ull 70% of the desiatod compra concrete sengh has ben eaied 1. Sulabe materia fr gens vench bac hal compl wih he requirement fount in Part bis Specicaton . Any sie wtized for landscaping shel be replecod in ter gal postion and conatan, Back materi chal be compced oa ss 80% NOD, 3 Nethoa 3308 “Das, Comite, Faun Fura snd Operates aineoance re Epp Fanaa ep! honey 1 It densty et sabe carta out 8S 1377: Pan 8 Method 22, 2 Maxim ticiness teach noe thal be 250mm, 5 Moisture content shat be maintained within the ange of 3% of he opin. © Testing 4. Se01.07- Quality Con. 1 Fished non-paved surface: +25 mm ftom spcteg level nies ahericesppoved by the paioar. ‘A General Requirements 4 Corractr shall sup al necessary tools for citing, chamerng, jing fing and fr any ‘thor requirement or satay sanatonof the pipe. 2. Tne Conactor ell fash al necessary equipment fr prope lowering and pang secon of the ppain the vonch, wou damage 2. duet before Inna, each lgh af pipe shal be clesnas and Inpacod for defects, bah noe 4. ‘Any aamaged peso ngs sal be marked and put aside for rea 3: Poser or any pipe tepas sa be pesote for he Engneers approval ort aeton being Any opeiad materi equee for he reps of pip, sheng, hing o coat shal ba chained the Gontacor sn halle sed accordance wan the Maniac recommendations ‘© Allshestos pips sat be checked fo conn of he apple protcton by 2 "ley tcton tn 46 Dicontnlies and pinols insted by te fest shal be pope epsked 5 ‘Nleamagosshallbe epared before insta, “Te Contacer shal remove om the Ste any le er apputenance, wich inte opinion of te Engineer 2 damaged eo be lor oorporaton ihe Woks 1. Replacement for damaged pigee or tinge shal be at the Contactors expense 7. Each pipe shat be cartuly fwered on 10 ke prepared bed by means of apron sings snatodk, 18. A recess shal be lef in the propred Bed to permit ing sings 1 be wiheaun. 9. 1th prepare bedi damaged, he pipe shal be raised and he Bod rostered boo pps laying 1. Inno case sha pipes be jantefore being lowered ito poston 11 Nopipe sha be dagger in ple for lowering into re werch 12 Pipes shal be lst o hat each one In cntct win th bed roughest he engh os bare {2 Tho'bed sha be et away and removed at eas Secale aoe fe a clearance Barn. 5 Aer the jont has boon made bedang fatal shal be cteuly paced and fare compacted Sneath the jot bare! o cose any ves et 1. Pipe sat teas wth centeton mars wpemost 1 Besding mata! shal be preverted rom enarirg os 1. Pipe ‘thall be jad in accawance wit De. mandactre’ recommendations except 8 rmodiegin wis Seen 14 Each Seton of pipe sal be fd toetercorecl and shall e laid tue oe ard ade sccrdanos wn the baneh mass sibs by be Coc SEER ai FavonentFunise and Opeaiowl Te ‘ayo whichis ol ue almant, btn variety ana horonaty o hows any undbe fetloment sr lain, shal bo tkan up and relat correc by the Contacto at he own exper, For granule pips suround, all adustmonts in ino and grade shall be made by sping away oF fing and tamping under the Stel ofthe pie: nol by weepng a ockg ‘Sei nd sockt pipes shallnamaly be aid ih he Soke nd upgde ‘Sub-sl water shal be kp! Below theo whea jing 8 accosance wih al requirements, oes shall be lid in eight nes, both Be horzental and vertcal planes, uss detctod [pnts ae appreved by be engneer For ope ines inh vencher, the pemisnble evans shat be a8 flows, sss oense ‘how Ba ning or appre ye Ean oronfl evan fom the conte ne af any pit 12. \Wnenever wotk cates on ay pips, the unianed and ell be securely csed wi a fh ‘ting pug or cover, unless fers deed by Io gio. ‘lsures and Snot Sectors: For the purpose of reaueng the angular deecton at pipa Jos, and for desu sectors, ‘te Conair may be pomited io meat ppe aostons fens tan andar ng, he Enonears aproval Cloang pices and stot stone of pe stall be insta bythe Contactor as demos nocossay Irene fata no seaonal conte he tiny. ‘Convaco hal be responsible fr taking to measuroments required, to determi the lengths of ‘ctporton of pipes for Meet a lung engin plies Pipe and methods of osing shat e such thal the ects f ings and lengths of lps can bo ojstoa inno cut als conten ag vations soionig. Ne oxva payment wil te made for such djusiments, nor for any welding, couptngs, Ras, brepedal ong roqured omect he esarenent ' reazonabetolrance tha locaton of ee fn, Enger lo enable he minimum ise ofspecillngts- Ccuting of pipes for inserting specs, ings or desu ploces shall be cared out in 3 Professcnal manner wih an approved sung machine’ descbed below in Sr lo ave & Tooth anda ight ange eats fe poe {ating Rg tor ND 10016 150 ‘ating Ghai for NO 100 460 Die eter for al art approved bythe Enginoe. “ha cat nds of al pps hal be propery chamfood Cniy wertare eapatereed in tanaing suing UPVC and HOPE ‘pes sale employed byte Contactar on ths wok. ‘ha, Contactor shal take every procaon fo one tat both the measurements andthe {ting of pos ae othe sceuraryrequred ‘Should ey sore oosur he" Conocor shal remedy the same, asthe Engine dacs, at his Buta n Poe [A butos pes but into conrte wa or erucue shal be provided wth Wo fei jens hiss otnescs detated on he drawings, he et int habe within 00mm Kon the eter ‘doe the suture ane be socands fre Tos 203) Unless others shown the Drawings, pes contucted io a concrete wal or suc ‘hat be petacoa win a conceo suound, regal wih fe eral feo ef fe Seve a Shown ene Drawings 4 spurenances wl be pried bythe Spi ibe Eoarsen ol Fans Hepes 3. Al.mrrat and extemal potcten membranes tothe concrete shall e seid around the ipo ‘openings a rocommendado the momerane maniacs: 4. Ray overoxzaiaton beneath to foundton leva of 3 stuctre andr beneath te frat level {' apeine, ether lobe conaused nde the coat on afte convo, cal be backlog ‘tn Grade 629 concrete, Pip Stopes 1 Pipohangor and support shal be a spocfedin Tender Docurens, {if apron bythe Engineer, a change of ration in eer the horzontalor vert lanes may be ‘made by detacng evagh piper, provides the sete O ont aeiacion es ns ewewes 75% of the mansacares recommended maninum vale and sue 10 sateen perarmance of he Joe. 2.Whare a change of Srcton cant be made by defection a he jin of ony straight pipe. 1 Locations of such bonds. and ther specials inated on the Drawings and th pation wl ve determneby the Cnactor end apeoved by he Engine A pressure pals sal be secured at si change In econ By concol actor locks a or by he prowslon of eer os 6 Cleaniness of Pts: 1. Paling end chambers shat 2. When wrk ot in rote, the open ends of the ppt shall be securely hugged wih an “oproved wari lo or sloppe ml feed to rss urautorzoaremova 83. Claw pe pug o ary pe alee damage he pie wil ot be approved. 4A such stoppers, pugs oc caps shal ba provided witha vont incorporating a valve fr the purpose ‘ot esing whet! fhe Bp unser pressure vacuum anda anate posure oe eqlas, ‘orto romoval 5. The Conrator shal ear neni ofeach hing and pips rath immediately rong, 3 Sab at finge and pe longi fo remove ai i, sand of ler mate at may og the he tr cafamints hed obo Uanapartad teppei, ‘Arig ese ssa eo ny a, nor abr matt my have 7. For he puree, 9 bbe deo, bush o thr sable plement that wit not hm he fara ‘ing of We pipe shale putes rough the pipe afer jong. $18 CLOSED RCUIT TELEVISION INSPECTION (CCTM) [A The Convactor shal ange to inspect by colour CCTV the siplne, fore ineaty and Aslormaton The equipment ured ote te mepesions shal Rave ti ane aces th ‘om adbeast std parabe f9 mamae devin 19 vr rae es MA oe al tes be hopt fo of at sit. mora, debs, rash and othe 1. Thal he speine is reasonably clea an tat no deisel In th invert ot he pine 2.Thalno unacceptable delomaton exist. Thal all he Inara! connectane have been ientfed and Bey chansges ecorée 4-Thal no jini ae serious misalaned oan or siFanwanh spa ‘The Engineer an Contact salon review the COTY suveys 1 In the opmion of the Enoinoer,signicant debs vemsing in he pple ter caring the Engiaor sal oct the Contraco cary ou fuer een ad anche CCTV hepecen, ime CTY Inspection reveals pipe ebro fale, detrmason or misatgnod ens greta than te deed inte then he Engiea il rect he Confer to undertake an excavation reps {The cost of excavation an eparorroplacerem shal beat he Contactors expense CCTV Inspection Eauipment ‘The CCTV inspeton equipment shal lncde, bt shall pot be lend to, folowing unt, ao Ihe appvelal te Enger Cour Camera wn and pan cis with 20m (Gamera ightnend assem [GamoreCrawer Assembly (of prope): Skil Assembly ‘SW"capls Fel, -conwal cbe (wi minim sf 100) wih cate drum assarty ‘COTY Cental Conrol Unt ected in purpose uit etic a), Coeur tenn, ‘VRS idee Casste Recording System win Audio infoostion system. “The camera anal be capaoe of akng cea and close pte in ny recton Le 90 degrees tho lof and 90 egret tha gt (lal TOD depreos fs oraora a) and le 20 Geese the Greunferenas a the pipe weheu using an oxra reveling mir attache 8. The camara shal continuously tanems danas inmates, slecroncaly mene 2 the movement the camera, wth maximum eran of 101%, 19 tha conl TV manor ent resutant eo tapes. 4. The camera ravi sesambl shal be agus for deployment in ppelnes of wring ies fom {Summ to Teagrim gamer The camera cartage shat be capable of vator relate Wo Sipe Gamer ‘Shout the Contractor propose to use a sell propled camera, It shancuporat etues {planes tebe wana dawn wnat afscng he ay oe wea recor ny 6, The Contactar sal submit peal veo rcarnge of smisr work cries out by Be proposes Camere prof ay aprovs. Suen rcndngs# accept, wl be elanoa by henge e the ‘Standort for apps of subsequent cogs 7. The vio tae ec snl shal be pred pemaney cr, or vies lps of approved quai, any tensmisson fom ‘camera unt in the con cool nt the {permor shal Mave rome convo fails fo dive te camera I ward ane ovr, ane "aM ora aol roped camer) conlthe cabo crm nd por winch ‘The CCTV vn sha have vee compaments thovverseann the operators rom which hi «the TV camera equpment trae areas ‘The COTY van sal be equipped wi aco ntl condor oh fr eacng and nesting) for the devers cain sid Be opariors fom shal leo bo. oqupped wih 3. wrest ‘ommaniatan tytn Seveén te opertr nals the van ana heiprs ate evan. 66 COTY inspection Requemerts: “Th tate of tal of th camera shall be such af fo enable a dea lo Be exacted tom the ideo tape record, But narmaly aval not excsed 0m a emir eles btean ttn oa ton “Gasp, Caner, upnan Fr rd Opwaona hve sufint space for twee personnal ning he TV Tho aus ofthe camera shal be ce up coincide wih the contin of the ibe. “The pistre ianemied by the CCTV camera sal be fe fom itereence and loss of vee! 2 fee fl The ete saben fs, oper Munn pod cons ond wt 4 von i obscured at ony ume by foung ofthe lens or ghting ystom. ores is impedes by Struct, the camer shal be wihdaun and ha sustion resis 5. Potions of deo tape mared by iefetence, of unscaplble for other ese, shal be frased and the felvan orion ef Bosna sha be r= suneyed and refocovdd. The Engies! wl bert ol arter a othe aoxapabiy of ny vido recon, 16, The master vise recording on Dita Video Dts (OVD) salle handed the Engheer and shat come the property the Employer Progmme or epecion: “The programme for caring out the CCTY Inspection aif handing oer he COTY ress sha be ‘grend wane Engines Video Tape Recorings: 1. The Conractor sal record the whale ofthe inspection in ¢ VHS video tps fomateorforing wth the recorang equipment manuacarers poctetin The recording shel pe 3 eorinuoi= ‘Sepny of an one monorsorcn fie eal cae the fohowing wom ‘tlomate update th camer metarage ato: ay. month ana year format “eaten sfmepecton-upetea/Gownsteam fominal gamete of ppetne (Gemton ference ‘The video recrdng shal be stopped whenever the cameras safonay or more ha Seconda sa have marval veri cpabiy, Viseo rocorngs wil bo appraised, by the Enginow against those retained 2, the Stand ‘itv the caer apo and ote fang Comp be rjc de wet 314 PPETESTING 'A Pipe testing sha be conducted as specifed in Tener Documents. For tho purposes of testing, pressure ppalines shal be dhided ito sections not exceecng 11000 meres in length and ‘each scion aha be sapaaay ed, to the Erpneecasteton ot dtenton ond rerere ©. For rant ince the plpsine shal be ested betwoenasacani manholes. |. Stank salle plac i ll granular pipesurcnd, unas others insted che awrgs ‘Stank sal be prouided a maximum spacag of SO, wh les! ane sane Bevsen we ejacent Mantes, valve chambre and other selarsrucures shal be considered as efi bas. 4. Stank shall be insted across te ful CoHe-eecon of te granular pe surind and ino te ‘rene walt en shown on te crowns “Das: Coos Ease Fred Open oan of Fatwa Hee 4, Stank shall be construed tyough the badéag at he ends of fue connection pltnas or te sub-poee bat ou st mantoles close to the capes end lo faite fue deter ar ‘5. Correte Stank shal be made of Grade 20 concrete an be atest 300mm tek” measure long © Psi strc shat be cnstucle frm layer of last sheeting, minimum hiknate tm, cu ftaround'e pipe arose te fl th of the rench ane lon the font Dadcger malar at thernturalrepoee anol Past san shale acon conjunction wi themoplestoppes 1B. Tho cast of providing stank shale ncuedtn te Contactar rate for ip lain 43.46 RENSTATEMENT OF ROADWAY AND FOOTPATH SURFACES 2A onoways ana footpaths sraces shat be restovad To neon conn by the Conc, 8. Mains tenporarycentaementr he duration ofthe Contact. {Make permanent ropa ony te nd of pric. ©, Those ronstatoments are deomed 16 be ently covered by the Contactors rts fr piping 1247 EXCAVATION FOR STRUCTURES IN THE PIPELINE 2 Cantractor sal cary out furhar excaraton st may be nackesry lo accommodate SbuEueS ‘Sion se mantles and chambers. 1. Stchescavaon halincuse poss of surpus metas. 8. Any osouaye and footpaths disturbed by excavation fo appurtenances shat be inated bythe 1. These seinttements ave deemed to be entirely covered ty the Contactors ae the 2.9 peru nowncent To STRUCTURES ‘aot round “ecturos st be conc Bpproved bythe Engines. ‘ack scacont fo sroctres shall be placed in manner to vod damage tthe seus, prota costings of water rool meranes Cc. No beck males shal be placed around sites unl the exterior protcvecoatrg rmambrene hes boon nepeced snd spptoved by he Engine: secovang 10 Secton 02200, ines etharise 4.18 ucts sence, racuiiee ao sTRuCTURES “ie. Conestr shal be Teepansibe for escaraning fom hs own inepecton of the Site and fovdraton wit respecte tly suerties and cer puble bos, th postin of al mas, pipes and ealeswneher ondrroand or ovehead, who near he Ste exg SPU, 18. Whore ranch excavation cared au close 1 fates ising pipes cable or ter serves, the Contanor shat prove sutable lamporay supports or shoring. to he Engineer approval 1. IC for any reason, any portion oF porons of the exiting faces oe srucres ge way, te Contactor shal cary out at his expense, al pessaay romedal werk fo te sleacon ot he Engines Where specfed onthe Drewng or bythe lent Ut Aus ‘pocttednon = split dts sal be proved at 1. Where, n he open of he Enginoer,constctn ofthe pptna carol reasonaty be cried aut Unloes ve pp, esl or oharsruceis permanent sevros permanent) dees permanent ‘opprted y sneret, he shal nc! he Contacto to undrske suh work, ‘The Contractor shall be reimbursed fr all soch work at the appropiate fle In he Bis of ‘Guanes ino appkabevales ens Ihe Engineer shal este the amount Be paid te Any raoeston of existing sents shall be done in scence withthe regurements cf the ‘exponsbleaubotis. 0 Fewoes ano waLis "Whar renchstoavtonctoses borers sich a fences an wale he Contactor shat obtain ‘ran spprovalt he Engine ele breaching the Ba. 8. The Contractor stall provide temporary fencing fr any pats of such balers at have had to be «Siar tench exoavatin hasbeen rena he Coico aha cary out such wot a he Engineer ‘ay oer Yor permanant restrston of cba 321 CROSSING WATERCOURSES 1’ "Conracter snl be seamed lo have stowed forall tho sional mossurs racessay forthe Proper constuction ofthe pgeline where eoasac undo of ovr sears, ers, pes an that srscoures needing martaningthe ul Now falar |. rid maringtpe anal be placd inthe ences hove a ies. 1 Depo shat bo sim bacw inched grade. 323 PIPELINE MARKER POSTS: 27 Marker poets, bocorance wih MEW requirements shall be plsced over pumsing oF peteue ‘mans sf oeaione nace one rnin, 18, Allabesng andetering shal be complet befits, (Marko posts sal be etn correo a shown onthe rang. 1. Exveme cre shat te taken o avid damp to efectveshestng ancl letorng, . Any posts wih damaged sheeting o leteing shal be replaced atte Contraco’ expense. 2324 INSTALLATION OF SERVICE PROTECTION DUCTS 1A Protection duct shall be supported on aulabie nancorosie spacers before slag conte 1. Diameter of he UPVC pipe stall bettas 150 mm, and must be epproved bythe Engineer. . where conte work is required, shall bef accordance wth Section 03800 - Cas rity 1. Concrete encasement habe with Grade C30 cones E Mimum hekness chal be 160mm a around; nest shown othewice onthe Sanda Drawings eae ea ea a Pps aT a BRT {325 DISPOSAL OF MATERIALS FROM EXCAVATIONS. |A. Subject to any ther specie requrements of the Gorract the Corrctor shal make his own Brrangerents forthe lemperary sage of sny excavate rater whichis eqied To use fefiing Wench or srure excavators nc ary necessary double hang. 8. The oii and ope of any temporary tos eongsee fe Wench excavation mud be stables at aimee . Ware the nls of he mati permis, be Coneacors temporary storage felts shallow {or eopatee storage for various grade maiora, ©. Any excavated mater hate not raqure or found i be unsuitable frre, sha be mowed frome na dapose of ns og manner, by te Contacto 1326 CLEANUP ‘A. Upon completon of work, bis, deb, fds and excess or waste mati tall be removed ‘rom the Sto '. Al corstucten equpment and mplomenis of sonics shall be removed and the eniie area ‘nieve shale ion anos, clean conden, accep tothe Engineer Ps a EET ‘SECTION 07365 TERMITE CONTROL PART 1- GENERAL ‘General proision ofthe Contract ncn requremenis fall Contract Documents shal apply this Secon 101 SECTION INCLUDES [A Furish al abou, material, plant tools and equpment, and perf st opreions and serces necessary al Wear emits coral |. The Contractor sal be roqurad to coorinate the werk of ther section wth he wrk ois section Retaed werk tobe coornated ard usedin coruncion win the oloweg speticsons bu at imited © Section 01320 - Submits Procedxes ‘Secion 01400 — Quay Requremerts ‘Section 01600 — Product Requirements ‘Section 92200 — Earthwork 1.09 SUBMITTALS 'A. The folowing smite are reared as per provision ofthe Seton 01528 ~ Submit Requrements 4. Predict Dat: Treatments and eppeaton nstuctons. 2. Product Cerfeates: Signed by manuachrers of terme cont product cethyingthatweatmants furnishes comply wth requrerens . Sol Tresiment Appleaton Report Afler epplestion of temiciés ie compa, sit report Inluding the folowing a apa: Date and tine of aplication Mole conan of 20 eles sppleaton Brand name and manatee fermi ‘Quanity of unde emit used Dilaions, metho, volumes, aerate of appcation used ‘Areas apptetion. ‘water sures er application 1.08 QUALITY ASSURANCE: |A.Aeplcaor Quattcatons: Apples wih minmum 5 years exprence termite cont raiment iar to ‘hat nestdor ns Proj and wns work hae a ear ucrestl insane peters 1. Repultary Requtmers: Formule ard apply tomtciesto comely wth ea puts [A Eminent! Linkatons: To ensure penetration. do net teal sll al wie stuated D2 ‘nol weat salle rections Socueng. Camp) wath aguements of eal autres +108 COORDINATION [A Coons sot samen appeston wih excavating, ling, and aang and connting operations, “roa sol unde footings, tee beams, ane oun supported sab, bles consul 1 O7 WARRANTY |. Special Warrany: Wren waranty, signed by appeator and Contractor certirg tat termite rial wor. cotstng ot apie tod tems Vener wil revert stata of subeanean 8. Warranty Pro: Ten years from de of Subtantal Compton, PART?2- PRODUCTS 201 SOIL TREATMENT ‘A Teme: Prowse termiede comphirg with rogues of local auhores, a sli or {mulbie,consnrted forsaton et tes wah wae" or Young agen, ar Yorulsled ‘vert ene session, Use on sof Ueatnent soos ht are nat harm pena, Prove {vary Tequred for apgeaton atte label Ylumo ‘nd Tato for the maximum frmiiaes forcertraton alowed for eaoyspace ue ‘Al sutjeco the fa ha te prozucmatel vertuaty uso ent banned by ris of Heath, owt PART 2- EXECUTION ‘A. amin subtates, areas and cansons, wih Apples present, for complance wth requirements formlstire conti of te so Iertace wth eshwork ea and foundation ark, and oer {ondtonsstecingperformancs of ermie cone, Proceed wih appeaon aly af aeattacoy 3.02 PREPARATION [A Gane: Comply wih the most eingetregoroments of lal suhortes and wih manure ‘retoninsivcbone for preparing tubes. Remove al edvancous sutces of wot callose Sod Sher eae meters such ab wood debre tao. supe end ron. stakes, MWD, aed ‘oterton wate wood rom sland rund foundations 1. Sol Tresiment Preparation: Remove foreign mater and impemeable soi malate het coud ‘eurtse Westmeneacivensesonsreas be ead Loogeh, rake, an eel so be toned. ‘Srceptprovousy compacted arose unr sibs ad footage, Temlies may be apped belo pissing compared i undr sia f recommended by lemaie manuaeie Cc. Fiefing hose connected to water sure the ao with x backlow preventer, ‘Doan, Cones Eauran Fon rd pwn Waitrane orbe Sgenean ot Fawanah oa 3108 APPLYING SOIL TREATMENT [A Genetat Compl wih manutecurers recommandatons. 2. Applition: Mix sol testment temicide sluion 1» @ untrm constancy, Provide quanty ‘eau or epplcaton at he lb vole and ate forte mann speahiedconcenaton ot forma, sosording fo manforirare ket te following wo hal census ronal 2nd Vora! trmistl bare o bose Zone elglshed sound end under bullang enero Disebut tho veement ovo 1. Sabon Grade: Underground supported sab constucton, neudng feotngs, bldg slabs, ané tached sabe anon ver tesment Tres! sol mata before conesafotnge an sab ae paced 2. Foundstons: Adjacent sil lndusng sot slong entre side permet of oundaton wa ‘2ound plumoing pipes and lee cond ponatang ss, nd around oor column Tok, [Ent pet. and Sung aire ouside permet om pra fo boar toot, Ale So Washout ‘Zon tooings ‘3. Penetrations: At contol js and aras where lbs wi be porated (Avid daturnancs of rated 01 ate appeaton, Koop of reted aoa ul compa. 1. Protect temic solution, dispersed in Heated 038 and fs, rom being subd unt ground ‘Stppored bs aerate, Use watrpce barr . Poutwaining ign n steas of ppeaon FF Respply 208 resimentsokion to steat itbed by subsequent excavation, cadng, © othe ‘onartton seas ebonng appcaten END OF secrION ‘Daag, Coavacin Equant Furr are Opal eae ‘bitnsne one gunn aren Hsp ‘naozses-2 SECTION 02510 ROAD PAVING PART ~ GENERAL (General provision he Conractincuing requirments ofl Contract Documents shal apply to this Seton 1.01 DESCRIPTION |A. The work covered by tis secon compises fishing el plat, labour, equprrant, appliances fre mates en povtoming a operations in commerion wt 9, Rte cnt era et a appr Pu remsreet of Coc, 1 Conectonste esting reeds.) Surace 102, RELATED SECTIONS |A. The Conractr shal be required corsnate he werk of ther sactons win ho work f hs sect. Relned wort obo coordinates and ueos in cerjunton wth the floming spectators Bure mead BS 1. Secton 01529 ‘Smita Provedres 2 Secten 1400 = OualtyRequrements 3. Section 02200, Eaters 4 Secuon0asts = Paves 5. Section 02525 Precest Concrete Kes 6 Secton 2500 - Landscaping Works 1.03 REFERENCE STANDAROS ‘A. General Specfeston ofthe Roads Adminstration of MPW Last Eton 1. ASTIADE46- Peneraton- Graded Asphalt Comentforusein Pavernet Construction ©. TAL (he Asphat insti) © MS-2 ii Detgn Methods for Asphl Conerte ae eta mc Types 1MS-3 Asphalt Pant Marval 2 MS-83 Asphat Paving Manus 1 MS-39 Base Asphalt Emulsion Manust . Whore thse standards confit wth he ther spectedrequrements, tho most sigan requitemont shal govern, 1.04 PERFORMANCE REQUIREMENTS [A Paving: Bese for parking and ght diy commercial ate movement of rks us to 15000 Ka 1.05 QUALITY ASSURANCE |. Perr workin acordance wih MPW Standards by @ company wth minimum § yas! exponen mas '. Mixing Plant Conform to MPW Standards Obtain mates om same source twougheut Devan, comara i Furs aa Operant rasan Heep snes 1.06 ENVIRONMENTAL REQUIREMENTS, [A Do nat place asphalt when ambient ar or base surface temperate is ess hen 4"C or sutaco is we A. Testing end anaes of asshalic mix wal be performed under proiion of Sacton 01400-Quaity Conia ‘Submit roposed mx design for reew one month reo commencement wer (© Contractor wi take sample fram completed work and part tet n accordance with specfed Sane +108 suawrraLs ‘A Submit product ata for coat ©. Submitmancfackeersinetustons PART-2 - PRODUCTS. ASPHALTIC CONCRETE MIX MATERIALS: ‘A Primer: Homogeneous meen cut Kqud asphalt, MC 70 in accoreance wi ASHTON Tack Coat Emulsied Asphalt Callin accordance wih AASHTO M208 AaphaitGement 6070 penataon grado accordance wih AASHTO M0. Coarse aggregate: Relaned ln No, 8 sive, Crushed natural stone, and gravel coment costes ‘Semping AASHTO T-2 Seve Tett AASHTOT-27 and Sounaness AASHTOT-I0¥ Mayerum sogum supnete soundness of 10% Abratr les AASHTOT-86 soma Fine Aggregate: Natal sand passing No. 8 sive. Clean and fee frm organie mater. Semping” AASHTO T-1h, 27, Sand Equnalors AASHTO T-108 10% Maximum Mine Fier: Faly gound parce of mestone,hyated re, or ober approved mineral dit, ros ‘ot Torgn mater acoowanes wih AASHTO Hi? and 1-20. Hjrata men scordance Wek astm ee {6a Coat: Asphalt Insitute Mansa MS-, Sand ype 202 ASPHALT PAVING MIX ‘A. Use dry materials to avoid foaming, Mx uniferiy 8 Aephat Base Course: 35105 percent asphalt cementby weightn mre A vods 3% sae .Asphat BindovLeveling Course: 4 to 85 percent of asphalt coment by weit In mitre. Ar tons 3.8% Topping Course: $5 to 7.8 patent of asphalt coment by weight in motu. A vods 3H mimum, Craton neues Myst ime PARTS - EXECUTION 1301 EXAMINATION |. Vecty compacted ub arade ie ey nd ready to supped paving and imposed los. Check fr any “son set 1, ety raters and vations of base re croc. 1302 PREPARATION |A. Compact subgrade to 85% maximum dey densty, conforming 1 lovls nd slpes| (oforto tome 20" H& 3.026, Patil Exact, Becton 02200 Eartwot) , Aoplyprer over base couse at unfermrte of 1 KGJsqm, ©. Aoply primer 113.012 he suface what atime, overop adjacent apleations. Use clean sand obet xce68 primer afer 26 hous tom tne of apliton. Apply primero contact surfaces of concrete curbs, utr. Coat eurtaces of manhole catch bain ames wih ll to provent bond wih asa paving $303 PLACING ASPHALT PAVEMENT |A. Pace asphalt ee course to ieknesses indicted within 24 hous of pining hae sutaces 2, Place Tack coat trate of Kosa, ©. Pla binderlevaing couree to thickness indested win two ows of pacing and compacting oso course, Place wearing course to thickness ids and compact pavement by rling. D> net diac er ‘true pavement em poston Develop roling wth consecutive passes to achive even are smecth fh, witout roles marks F. Hand compact in rea nsecessletoroling equpment ents to be constructed so tet even, integrates, compatible wserpcef sue wanstions are ‘ehlved. nora‘ ool ont must be made, ei Bac areaay posed asphat ncaa o a can, ‘oral surtacs and paint surface wih hl asp cen nelly prior To appa fresh mix H. Moke comectons to evsing asphaltic coneeta where Indeted on the cwinge st correct ‘ovations. Prime edges of existing asphale concrete fist. 306 TOLERANCES |A. lanes: Manimu von 6 mm maasired wth 3M sight edge. 8. Compacid Scheduled Tres: Win 8mm of design Pickness (Vasa om Tr Elevatn: Wain 12m, 1A. Apt seal coat in accordance wih Asphalt Insttte Maral MS-3 and manuachrers 1308 FIELD QUALITY CONTROL ‘A. Fld inepecton and ting wl be pecomed under provisos of Secon OY420 - Quay {307 PROTECTION 1A. immediate aor placement rote pavement rom mechanical iy. Do not tow vehicular tac on newy paved areas unt surface has cole to Stnosphere temperate secrion 02815 PART - GENERAL ‘General provision ofthe Contact cluding requirements ofa Contract Documents sta ap} fothis 1.08 DESCRIPTION [A The work covered by iis secon a aha te as pr the resuirament ofthe Contact and specfod oven ‘compass. of fumshing. al pant ntour,equpmentapploncee ard. materials or Dering af eperatone in comecton wa ne instalton of Precast Coneete Paves, Fed ly Sok Pavers and stone paver. ‘ine, RELATEDSECTIONS |A. The onracorshal be requires to corte the work of fer soins wih the we of is ecto, Folslod wort be corn ad ud nconjneson ih he ol specteatons but rot nog 4. Sectonara29 Submit Procedures 2. Seton 1400 QualyRequremens 8. Seclngzs'5 = arbors 4 Seaton g26i0 Rad Paving 5. Sectongases Precast Conerete eros 8 Section 62009 Langreaping Werks 10s REFERENCES |A. Amorcan National Standards rst: 1. ANGIAI1B4- LalexPorand Cement Mons 8. American Sooty or Tsing and Materia: 1. ASTM A185 - Standard Spactcabn for Stel Welded Wie Fabri, Pin, for Conse Reinoreament 2. ASTIACS3.- Standard Spectcaton fr Coneot Agrees. 13. ASTIACT44-Standara Specfeaton for Aggrogate fr Mason More 44 ASTIACI50-Standara Specean for Portand Cement 5. ASTM.C270. Sanda Speciation or Mota for Unt Maton. (8. ASTH.C7S7- Standard Temiolgy for Ure of Ol and Resin Based Pty ané Gang Compounds 7. ASTM.C302- Stadt Specileson{or Paden an Lae Peg Bc | ASTALCTZ72- Sanda Seater Hea Ve Paung Bick ° ASTM D848 - Sanat Spetatn fr Penetration Graded Aap Cement for 1 ASTILDE7S- Standard Pacis for Sarping Bumneus 11. ASTIEDIO7S - Standard Spectator Fe Aare Noone re Expos Fovaih Hsia aN ee? 1s avrg Mates. 12, ASTM C06 - Standard Speciation for Sas Conese Inerecking Paving Unis. 1 ASTM 29 - Compressive svengtno cineca corte specimen [A Thefolining submits, efinain Secin 01529: Submit Procedues ae required 1. Product Dal: Prove characterises of paver unit, dmonsions and special haps. 2. Samples: Submit wo samples of each paver 25, utatng ve, se, colt ong nd surface ten of nts beng proved 2 Testrapa: Cry products or oxcsos specified requrements. 4 Morac’ instalation Instutons: Inéeatesustaterequtamentsendnetslaton maha 5. Submishopsauings. {. The Contacte shall rovide and submit for approved te the Engineer, the dtl of proposes Pavers aquest anaue ons, 105 MOCK-UPS [A Prepare medkups of uta Zn fr each pe of patio et. afr ihe approval ef mati samples snd [Salecaton decode Engst Parr 2 - pRooucTS |. Procast Conroe Paver n Basket weave pata for Landscape Woks “Type: Bay Frrexe00 ‘Aeprove Mantoctuers ua Bing Mataale (Tet 24874610 Natona indus Tal 24874005) i Bonyan Co Tet 25260776 Fax 25200881) Cr Aoproved Equal eee Precast Concrete Pavers or Root ‘Approves anuacters Natoma indies (Tt 24874085) ‘Rat Bung Mai (e242 7A010) erazzo a at Tel! 2585291, Fan 25952962) ‘Grape Exist ‘Cement usd In the manufocue of concato paving blocks shal, unis sled ens, ‘Se suphate rest coment which compics wth he oguemens ASTM C160 1. Compressive srengh sal b 400 gin 1. Coloured Conerata Ties, Un Pavers stall have minim content ofiergant pigment of 5% [5rwmigh of te ooment content ang secarsng to manuasrarstuctons . Aowsaggmal te crushed imestone comping wih ASTM C33, fee from ear ly am FR Op + Se cna tt con of a tog a ta Serre om eared meres oe ma area Te ive wae Rattaeey ete wag re aa sooo o. ae nie nae en ay fer bate ae cis Ait Ses Surfer utah fete Mc neal MEE PSE a a to oe = «STE sg atc er ne cy cn 8 sce 4 Sand for Praca Concrete Itvoking Paver Jone: can fe sane 202 FIRED CLAY BRICK PAVERS Fed Cay Bick n Gasket Weave Pate ‘ype: Coxon Roser ‘S20: 1003200. mm Fred Cay Beka Hening Bore Ptr ‘ype: CoxmoorRosemul Fed Cay Brick Stacked don Pate “ype: BadgemeorOcire Wut ‘Ste: 100200 6mm 203 STONE PAVERS. 1 tne Paver forRanom Pats “Type: Hphmca, Fina Gries, Har Yorkstone Clout tue Grey Fineh Honed Finish ‘829: 5) 300% 600x Son 8) 600x600 Somme) 300% 300% SOmm ‘Stone Pavers for Ruraing Bond Patem ‘ype: Gramte colour Ugh Beige Finan: Fimod Fish ‘91005 200 Som [ PART - EXECUTION I A. Verity that substrate is level or to comect gradient, smooth, capable of supporing pavers and Impovedtaads, andeady a rocave wor of hs Seaton, | Vert grasns and lovtns of ubsato ao correct [A Instalas per the approves sectons a per he requirement the Contact. ‘5. Dampen an ler compact sand evel and evn sua before placing te uit, (Pace unts wth ints per he equtementthe Contact. ©. Place ans in patenaepe he requirement fhe Cont om a salt ference ed, Place hat nts and special shepos uns at edge a inten. Spine sand over surtace and swesp ito ois whore tase exit. Moistn joins and recover ith ‘tuna sand ulm arse sehevwed. Remove exces sand. {G. Temp and ive unte wih machancal vibrator unl unt a fly bees, eve no comet ‘Seraion and graders: Do noltamp unestaned edge ‘363 INSTALLATION OF CONCRETE PAVERS ON ROOF [A Lay tos of ab pete requrement ofthe Gonret 15. Lay toe fy one Me fa, wthout moa bod Laying oftes salle untormly sigh oie deel |Ar0om dan pong sca, Olpote of exces san. 8. Clean sled sures Do rat loge un damage scart Wo o uae Ew oF SECTION ‘es CneWelon,FupaR Fore a Onion) PART - GENERAL [Genera prvion he Contacting requtements fall Contact Documents halo this ‘101 bescRIPTION 1 ne work cover byte secon finest on he savings and ae specie aren compres of famahng sl part, iteueupmt,applonoes and metre fer poforing al operons ‘nec wth ne nstalatanof Mocs Gores Robe 4.02, RELATED SECTIONS. ‘Tne Convator eal be requrato coordinate th wok of ther scans wih the wt fs secon Restd werk be coordinated and uredin connton wh he flowing specicaovs Bat ht ii 4, Sexionots28 = Submit Proveaues 2. Secten01400 = ually Requremenis 3. Secteno2200 © = —Earworks 4. Seutan25i0 = Road Paving 5 Sectunoasts = Paver. 5 Seeen2sc0 —- Landscaping Works 7. Sextan0sico —-_Conerte Forms & Accesses Sexton 03200, Conte Rarereamert 8. Secten03300 = Cain Place Concrete ‘Aloe section efacedby ts scion and effecting this secon “The work shal conform othe cages end stds of he flowing agancie as rer ote "ASTI Amercan Solty fo Testing ane Motori 188.08 Precast Cone age. 2 Aart can Const gregtes S.ASIRIOSO Comprescu cron of jindicl cneee specimens ASTM GH80 Ponand coment 1.04 SueMITTALS |. Te folowing submits, as cetnadin Secon 0132; Submit Procedures ae requ: 1. Shop Drawings: 1 Propare and suit shop caving i seordance wth he requrement fh conbsc ripe ctmaterisis spac taron i accotarce wih equtemens fe coat ‘Design, Conracon Equant Fura sn Opsateat Mannie fr be Exgencon oFawansh spa Es |. for tne mate! samples have bean approved, bul fo ha Enger approve a samo length of roca concrete abe ceucton wih he samp panel of paves, shown mae aon o ouree Combines sample of paver ad precast concrete Hast ba reine as aecurancs of he mininum ‘lant eocenbe roles amps ere drat ef i wes andrew upon ele. “1.06 DELIVERY, STORAGE AND HANDLING |. Take ot nacessarypreceutons Ww prevent cgping, cocking, or ther damage cre te wlan na soaps on ie sts, Damage kre not lowed 9 be site ana shal ay damage oe {ound ated work suc work sat be remove mesa ar eplaced wih ow Mao The Convet shat assume a expenosencred bream, ‘The wok of his Soon sha be compli coos wh the wor of ter Sacre, ‘Vsiy densa and war of ether ase who aon mata of bie Sanson Bele he Retaon ‘ftemsneren, PART 2 - PRODUCTS: |A. Precast Caner Kerb shal be aed on yale reso, 1. Face Seaton of Precast Corres Kerbs sal const of Portand Cement contigo [ASTI C-160, Typo and BSN, 12 supe essaneumen . seat santo 8S 882, The maxenu cyan st centnt shal net exceed 3%, 1. Coa sparegie to BS 882. Aggie shal be fee of dees matt and rave mat, 202 APPROVED MANUFACTURERS ‘A National ndustis Go NC; Tel 24874060) 1B. Borja Co, (et 23260775; Fax 2325081) 5: Orhoprved Eau ° Note: Precast heft shown en drawings and at svat wh he sbows manutacures ae 12 be ‘peiy ranged trough Soo ae pacant. Coetin=t ker willbe ace. [A Concrete Bang materi haben sccordance wih Specteatons Sexton 0300 PART - EXECUTION 301 WORKMANSHIP ‘A The Contactor shal be response or propaing 2 proper suas to ceshe pices cone 2. Proven cone baking an founds (140) oa carte ess shown on ho eawings C. lor ls and conerse fo ace precos concrete orisha be clean and ect fn {302 PROTECTIONAND CLEANUP [A.A eof each day, camo fom the ste ad spose of al cartons, bch and obs ‘esiiog fom te wok he secon, END OF SECTION “Ban, Canaan gape FRR ne Opa Mamenapafenng paneon ot aren Hosp! Q secriono2s0 SANITARY SEWERAGE SYSTEMS PART 1 GENERAL ‘General proven fhe Continuing reqrement of l Contact Documents shat apply this 1.01 suMMaRy [A The section spaces installation and tasting for Santry Sewerage systems end inudes, but Ie nl iit te foun Sonera Requremorts Pe txing Connections existing pstnes ‘verpumpngandfow everson For wench excavation, pige inetalaton, and backSl see Secton 02521 Trench Excaven, Ppelnsaiaton and Bac [A setons sffcad by this section and a setons afectng this ection shall be coniéered 100 REFERENCES A. Prodt manutactur,tstng and instalation shal camay wih tbe ftonng reference, tinaesoerise said inte peteaton, runes oterwse opproved bythe ghee 1. ASTM D221 - Recommended practice fr underground nstataton of xb themoplastisewer 1104 DeFINriONS [A Theoloning dtr sal parti to words or pass as ulredin ti section 1. "UPVC" shail mean un pase pony clr, 2. HOPE" shal mean igh enstypayetyene 3. “RCP shal mean renorcedcancele pipe 4. “Dr-ehalmenn duct ron, ‘5 “Pipa Suround chal meen that mata dest Slow, reund and above he pipe 6, “Fat sa mean Bota he tae exert. cri sone cas, owe 7. *Stanks"chall mean bars to owing walerwihin gsnular pipe suound mate 1.05 GENERAL REQUIREMENTS |A. The Conracor shall provide all abou, materle and equipment necessary fr proving a ome operaing som 18 Responsiblty for he safety and soundness of al materi shal rest wih she Contactor ©. Contactor ie sevied to cary out any tess (a hie cos) nesdea to satisfy Hs rogang the caundnes fhe pp, fing an jong materia plato acceptsncststnigby he Eras . Pipe malril o be ued sha be shown onthe drawing, ora descrbedin the patel Sra general speniatns . Each to of pipe and fitings shall be fuished by a single manuactuer, anaes oerwise cepted he Engree. 1.06 SUBMITTALS 1A. Prosi Aproval 1. The Conair shall submt sufcent infomation to the Enger, prior to puase acoring {p Tenaor Document. Fade overly complange with fe specfestone. Such mlomaton Sal ‘fade teat alow ‘a Manuecurersname 5 Suppers name © Programe (if appeate) 4 Prost deotipton 1 Manufackrersachicl dla © Strage nntuctone §. Instalaion nsructone 1, Mote! samples shal be submited. at requod in the retvant soctora win these ‘pectcatneo 0 fequstad bythe Eran. ethed Statements “The Contractor shal provide mathe sates mesg th requirement as pr UPW standards, {erat ical he folowing acts, o at roqesoaby the Engines. Ppetastng INemroe and cham eoratucton Poe instalation ncting back compaction methods free (UPVC ana HOPE ips. 1. Shop Drawings 1. The Contact’ sal suet shop éaningsacordng to Tener Documents forthe flowing ems 1. Pampstaton coneructon, 107 QUALITY CONTROL, |A. Porto patch ram he fatay, tne Contactar shal oly the Eines n suerte alow the Enpner or his oposeristve fe nspect and tea he pou, so deed. [AY moifeatons shal be made by writen “nspecion Requst @ szzoraarce win Tender ‘4 Roaavance copy may be faxed the Engngers ofc, but he oral mus ave bere the ‘dhekled day ot npecton. “Basan, Coan, Eure Fru ne Opal ea amar a serene rhe Uganeon Fare Hsp! Te 1, “hspeton Requete” for a last te folowing toms, stall be sutmild lo te Engineer ‘ing the onsie uetalason work, por to roceading wah the Totowng settee. Mlnmom ‘ation tne shal be 2¢ howe Ppe sting backing Fenforonant or Cast Stu Concrete, Fors forCastn St Corsa Pango Castin Sta Cones 1108 DELIVERY, STORAGE AND HANDLING [A General equements for delvary, slorage and handing of posits and mates hal be Species n “Msi and Ecupmont 8. Specie roqurements shat be 98 spocfed in the elevant speciation satan governing Ine anvltrs and msataton of te matora or product in uot. ©. Adora quirements may be recubed Geccives ofthe Engineer. br the mandactures recammendsons andr te ©. Produce shall be delivered, hand and stored according othe manufacturer recommendations ong wit he owing prow 1 Transperaton, tanding and storage shal tl tm pouct “aumoge 2. Only nylon singe shall be slowed fo tng prodits. Stel chan, clamps a les shal nt Be ‘Sowed or iting purposes, mses approves bythe Emp. ‘a. Sot chains of sabes may be alowed for sacung OSS dug transsortor storape, proved protective pang o” Unber Docking ied 3. Donel store produce dec a the ground uniss approved the Engineer. Ensure aosqute tember blocking ula prone outlet sport 4 Vauly inspect all products upon dbvery ad report any damage t the Enghes. | ny preaete damaged suring clverysovage a staton shal ba ard ae et a6 1 Proposals for reps of any somged prog shall 02 submilod i wing fo he Engineer or eerova, repairs o damages pods shat be atempled without the Engines spproval, Zany damages prosuts doomed unsuebi a epar byte Enpnes shal be ranowe mse ‘lepine sna Conair expana te performed 9s manne fo aid PART2- PRODUCTS: ‘A. Polymer Concrete Pipes stall comply with the cequrements of Secton 02098 8. HOPE Ppes an ting sal conor tothe roqurement of Socbon 02630. 1A. Pipe surund shall confor to he requirements of Secon 232% - Trench Excavation, Pipe Inestign and ack and ote raquemens of he peste pipe mate specteaton. [ori Fars me Opal ere Fare Hora ass CGRP fobseaton snes bow shat comply wih te MP requirements. Lado and safety capes Maron nr ants eee 2.04 CONCRETE |A. Concrete and accsssorae shal comply wit the relevant secons In Divison 3 of these Speciation 205 CONCRETE LININGS AND COATINGS 1A. Cones rings and potecive coating comply wth the requtemens.o MPH |. Weer proofing shat compiy wih te raqurements of Them an Motu Protecton. 207 MANHOLE COVERS AND FRAMES |A. Manhole covers and tfames, song wah te fallowing ams shall comply with the ‘equi of Seoton 02594 Cast ans Due Wen Mane Covers and Gratings 4 Mubipa covers 2. Sura boxoe 5 Seaing plates 208 VALVES, GATES AND APPURTENANCES |A. Pumps, ves, gates and appurtenances shel comply wit the requtements found in other Diao of hese Spectcaons £209 PIPELINE WARNING TAPE A. Pine waning ape shal campy withthe requtemens of Seaton 02321 ~ Trech Excavation, PPpelnstaston and Bac. 240 PIPELINE MARKER POSTS |A. Paine marker post shal comply wth the reqlrements of Seton 02321 ~ Treen Excavation, PPpeteiinton and Sakti 301 PIPE INSTALLATION A. Teach excavation, pipe lstalaton ad backtl shat comply wih, Section 02521 ~ Trench ‘vat, Pipa Inetstaton and Sack unaescnewise approve by the Enges £02 CLEANING AND INSPECTION OF GRAVITY PIPELINES |A. For the purposes of clearing and ispecon, the tom gravy ‘pels includes Hose i ending ory pipe sky om tnnaingo ear ech, 1. The Contactor shal submit for approval, his proposed mt «Saar Fu and Opens on oar sp ‘ch deenng system shl not damage the pene in any way ©. ing and ater censtucon tne Cantata shal ake rasonate measures incucng the proven ‘tapas plge and heads where approptnn, fo prevent the ngs of dellfioue malar ino pps. 1. Alter beeing pip enches and completing mantoles, chambers, halch boxes ee, and beta the tenon susaeee are rsa the nln ot pene shal be cleanes ofa ad cobs by Spproved mets for nepecon by tha Enginoe flows 1. Pipnines of 0mm nominal ina meter and smater sel have alone pus pass trough {namo show fat hy ae la obstruction ane free fom detection For fexhle ppaines the {Gove plg sha be Smensined fost the prmisia mnimum deleted dame pe 2. pein greater than 800mm nomial nll dame wi ater cenng, be Inpected fom he bruie'and the Contoror sha proud 2 sual tobe. ventlaton and sfey equipment, an Shy ote ln and bor necessary or the purpose, road Te Engines. 2. All sipeines wit be specie agin bere commissning oF taking ove (whizrever ner nd," required bythe Engineer. shall be Gaaned agan in whole ori pan The foal pre ‘cominissonng inspection for ppcines wih nomial etal amor of 800mm oes shal be Sy"ecTv camera wih wseecessete apa im secrdancs. win Secon Ot. The” tape ‘arcnge Shall become the pope ef he Misty. Pipelines with nominal heal dimers ‘rater an 100mm shal be pected a fal pre chemissoning In acoreance wi Hem 2 (re fomina ny voy) ‘ter tal pro-commissoninginepocton, al pipelines lo which ows wit net bo immodately connects ‘ral Be plugged wih puroue made femovate soppers unl such tne ss" te pipeles re ammisisnad’ A log tering he nsaaton dato and ncaon and he subeesuen eva dat of tt stoppers stata shal be mantaine and euntersigned byte Enger. 1303 CLEANING OF PRESSURE MAINS. sce, inuting the not stoppers loge. and Peaduals were aproprae, 10 prev! te gress of oletooue mar o pipenes 1. The Contactor shat dean the Inrioe of ach pipe int a¢ i Id and natal temporary ‘Seewe paces on the endef the pipeline whanever work is sloped or dsupid 10 Keep te pene ces (©. Pressure ines shal be sed wn water unt al stand sane removed and Ine flows an orto hyarstae pressure testng 1. All pressure nes tat wil anspor cladnated water (obo, tesled fuer. et) shal be utfacied to snfcton win che in aecoréanes whe eppcane AWWA sadarss ane bx andrepuntons {04 TESTING OF PIPELINES: GENERAL A. For the purposes of ingpecion and tang tb tom “lplnes nls toss lcm heading or by Pipe acting omic tamelng asa eaniuoe 8. Prot to commencement of fsting of setng, aporou! shall be coined to the qualy and ‘moths of prowsing ens depoang a al ade Use fo sng o fst purpose they shat be norughly cleaned of al sit ane any resulting damage mde good se use, lagoons forthe slorage of such hid are permits, hey must be suiably rtd wih fring natn by day an ght prevent accor bythe goteral pubic and wnat be sed adacen ts bulkings. Approved means of provering fe aman of Mesqu lvee onthe saa of He Tapoonswitbe orev, ‘esting of ppalines shat all catos be care atin he presence of he Engine. To Centaser shal prowce comple plant spd a st. ook, ee. = may te nacmeeay fo ‘Feamely tetng ne panes othe spots proseires, For bath gravty and prossire ppeines, oly testing of naw oF replaced soctors of pplnes Sa tinge wt be requred under he Contac, nsororance wh this Spesiaton loss “etied Sarwise, Such teatng ‘wl be cared aut Dfore maxing Sal connactors tothe existing etre. However where toot or oher ings ate muela ni exsing ppelnas, ard Wore (Gnu of ppsine are reacee, na toetling wil be alowed atthe foes or finger atthe Js batvasn new and exeing pipe work el he ppeine has Socnflunado soe abd "Wal pecton of euch tinge ana fs rade wi ihe network under reese ‘Should any inapecton be unesstacory ot anf lst fl, te. Corrector shal place defective pes, lating freer cheoe re-enectedefcive work ax neue, flowing whic, Searing testing wa be repeat nt te Engines safes he pba lo be estate, “The Contac shal ake cre tat cing parods of rafal or fzodng of werches tam athe Cates, lenge of completed pneanes who nove na Ben backlld may be sje 1 felaton. Fe 'snal ake grecauone and meacute to aois any sugh fltion pens sro sb} fo fotation they shal be tmoved and comply reli to he Engrs satsacien. cone ‘The Contractor shall submt a metiod slaement ia acsodance wih TenéerDocumerts MEW RRequrements for the Engine’ appoval covering doate of Mie propoced mebods and proramme to’ ean (ncn datas ost oguemen). "The Contacte sal provid a abou, malerits and supe necessary fr cing ut tsing Gnd ceaning"ndudig water, pump, gauoee. ped canneclon, slop ence vd eer temporary works, The Conracr shat ac nade seal rte deposs of wate Use Tor Gauges used for losing pressize pipelines shal ether bo of conventional cur ype, not {Eee nan 3torvm darn calbatedn bar, ortallhave a dial nce caable of feadig Inerment 0 bar Before any gouge e weed. te Contractor shall arange fr to be checked inependenty and = ‘eoent cores oft aceuray shal be proses To Te gio ‘ne nitonal gauge av above shall bs handed ove the Engineer for purpose of veiaon tg testing. ‘The Gonractor shal caltrate pressure gauges at eguar inten, os equradby he Enger. at nesdtionai cot tothe Minty Pipetnesstallbe propa secured and supponed before boing putundertest. 2. At pipe ens, prowse for wanemiing te end Brut io the ede oe Fonchos Eure mat snchorae of band i sfeset sd ast fom a branch oes ar opery No tasting wil be parmitod unl en day afer tus sks and eter holding down works have boon comple, sles ater apravedby he Enginoe Trenches may not be Ie open a one pr to testing plpenes, except a5 eros by he Engineer wo may lay den cota esr condone, {9 chock materi and workmansip onthe sine 1 Ths et eheve the Gonracor of hs obligations complete a testing desist under ihe 9. Al water reuited for tesbng and cleaning the genes shal be potable water oration water ‘ha sha be proude by he Cantal ath coat. 1. Abaxbeppeinas (UPVC, HOPE) must te ese or ceftecton, 11. The Engineer ehall have power 10 requte the Contactor 19 vary any tet procedure or Dressua, asthe Enghosr inks st no ee cst the Mnshy 12. The Contacte shal submit an mepecton request to the Engines, in acasance wih Cl 1107 uatty Gon 1 tent a sccton of ppebe, ar havingsatises Nese Pat to secon of ipsine lobe eeadin the prosenceof he Engines satsfacoy in al aspocs 12, The Contactor ehoula note tat ner the eatitactary testing ofa pgine, scion af a posing rany ater poe work nor he acceptance of such tostng bythe Engine’ Or he erent Shat nary way tele tha Conrer of any of ie vosponsbties and oblgiboneundor te Conan 14: neta or ntain cash aroun lined ye setts, be Crea sha i'n own expenge, make the necessary Tepe feplecements Fy aczosance wil the Speofcatone 0 eauca he leahage orton ote specie Imes 45. Any nasil detectable leaks sha be repeted,rearcess of the results of te ee, nies ‘three acct by the Enghrocr. 4. Dalton Tostna 1. Al fexble poses (HOPE, UPVC, et) shal be subjected to dalcion fess a, at ete forin ann the pareua pipe apectzation of tess documents 1 Thestovereqatement shal nt apply pipes 1mm a and sna. 2. Dstecten shall be calauste as a percentage of to oiference belween the nessuted niu ‘Samat on any aul) and the eed ron dettad ameter. hed by he nom deat eee. 1 Aedutn in he ameter sal be considered abe a ogee dofacson. | Maximum detecton Crteta fr Fexbie Pipes (mossurdin-St) shall be at tad in he Pancuarppespectistansectons of ese dures pe surround shal be remove tom al secons of pipe fang to meet the epi detcon UUncamagedppes may be backliled an tested aps, ‘Aveton taken 9 corel tbe pipe deecan ata be atthe Contractors expert Reid seclons shal be leied i sccotdance wt fom number 9 above it the pemanent set or deflection, ater aol of pipe surround, exceeds the iis stout above, the piper tnallbe deemed to be damened ar wl eefore be ete. + Pascoe sabe mn mates reno om We aden athe Contacte 308 TESTING OF GRAVITY PIPELINES A Ai nompressure (any) pales of 800nm nominal imal damotr ané small shal be ven pms fest when teppei ecdedsndJonted but tore baciing ad a (2st ae! bocciing.Unots clas mstcted, non oresure pipsines shal be ested sectors between mantoles In salion, ppslnasthown st neigh ines on De Projet 'angs shal be ‘bocted oa gh teal bawoon manholes to vet alignment 1. Proiminarytest for tines wth 800mm rtm amet: ores: 2 AES ged athe pose ls pesice in Read ot wt nid ona water ‘manometer and he pressure spa not at oles than Ts cng pido mits. The Contecor wil het be permed fo commence faring att than 4 hows ter suse or aver han # hous Delors suneat during the aunme Pere ues oferse Greced by Ne Engineer aoe 2. Finaltest fr pptnes wth 800mm rte camete oes: 4 The par ofa ppetina unr tot shal be od wi watr under pressure ones the ‘oquements fam below ‘tna praia sa be sine fr apoio of 20 minutes andthe ome of water equred to Iraian the test pressure shal be elermned ‘hah approved’ manner The tet wi nt be nrisred satay he at a lous of wala om a ul pple sncweds 1 Are pe Nour per tae f Grete pe 20 meee engin of ipaine under ts . Allnangrasira (grave posing age han 80nm nominal nemal amcor sal be rer Inepeccs, presse tsled and ste tested for Inilsion when fs blow the graund wale lable Intemal mepacn sal bein oecoreancs wth rile 3 2. 4. Tne Contactor sal, csr out tests on every jot by means of an approred jm tstng {ppartis by hyoceatoaly teeing he pena. Teal pressure shel be h scence wih sm iio 1. The pa of he pipline under tat shal be fled wth water under pressteta nee the Foguroments of tem c blo Tet ein sal ssid or pel 50 mew nd he ole of aes eared ‘haan the let pressure shal be detained han approved manner. The lest wi Not be ‘anedeed satay th rte of oss of water fom 2 fl pipeline exceeds 1 Are pe Now per ‘moe of cametor por 30 mebor of ang pipe unde ts For any jain of pipeline tht fais th lst stone! joint sealing wil be required to be ceed ot by soprovedreuiglgout weston fchniuoe ate Conran: co “Te Contactor shal ropa anyon wh vse ekg. pone test pressures Sexo —— Pee ssthan om [rz mo ‘sr = rasta han Tim fretor oF 1 BW above pound wai abla OZ . tntraon Test ‘Ina measured inflation sha not exceed 1 the per tour per mete dlmster for 30 mates of lenge" f ppetne andere 1. Pee 6odm and lrer and smal ze fsecod bythe Engineer, laid below the groundwater able shal be sbjaced tp an rfraton es. ‘The nfran at shal be conducted alr dewaterng aces have been suspended for least 7 aye «The Contactor shal inde in is matiod statement complete dota for he measrenent of any Inieaton 46 For any fine thal fats the lft tat the Contactor must ropse measures o remedy ‘ne ston and execiie such messes at his own cost Yo ashowe comganee. Wet The 2, For any jot ofa plplne wih nominal tena ster groster than 800mm, whch al he oe ‘riser ost sealag wil be rquved 10 be cared ou by approved rsivguiyot econ teeigues the Contactors cost 5. The Convair shat repat anyon wh sb eakage Fintispecton + Afar bacting and prt commiesening, al ipeines shallbe inspec by CCTV camera end @ video econgiaken of soy 2. The Contato shall reper a repo ofthe plples in an approved ote satacton of tho Bath the oper ai ie reorehg shal bee oft MPM 308 CCTV INSPECTION OF PIPELINES |A.CCTY surveys ehall be cared out on all gravy ppsines stor backing in aeeodance wth Speciation Secon 02321 Al pipelines hal be inspected by CCTV camara wit a vito recoding taken ofthe survey ater tacking and prior fo commssonng m acorsance wih Seaton C2321, .The.Contacor shal papare sepa af fe poslnes ian eprevedfomal to Be ection of Ihe Enger, Bath he report and he vdeo rearing sha ecame the propery ole MP. 1. The Contactor shall pa delactsGscovered by the CCTY inspection ano cod othe My The ine opments bo epared sha be e-nepocodby COTY. {307 TESTING OF PRESSURE MAINS [A Aipessuce maine sal be tstdin sections not exceding 100 mete In ng 1) Each pipeline or section theo sal be filed wih water anda air rovedas a 3 posse 2. The presse shall be raised by pumping ut the tes oresure is reached and he pressure shel ‘Divas at hs pressure y urter pring uel saa. {Pumping sal be stopped andthe te fakon fr th observe pressure lef by one mate shel 4 Pumping stall en be resumes andthe quaity of waler pumped In order to restore the fest ross chat be records and uring topes. 5. The tat shat be held at pressure for 2 hous wihout pumping and if the pressure dots nat {alloy moe tan | mete pumping shal a ecu an the quan of wate pumped nore {Gio ie lat posse shal be recoced andthe pimping lopped ond ene eerie 3s 2 6. The rte of foes shal bo caloated as the reoardes quantity dvd by te remrded ime of re 2. reesuretxing against ves 2 The Contact enoulg note hat nce valves cant be guaantes to be precy ip taht sing {iat cased valves connected fo exang or operating syslams shal rt bo permite Teng pant ofr cased vaves,(reudng avalos) Not"so conectod may e allemtad # Sesigned,provaed the vaives ate suitably anchored agains rus. Testing agent vate carbo or fer street No datne wil be entaned on account iaking valves, ov anyother eificubss encounters, Ineluding he kelon of ta lenge pe wo tsb. 4 The Contac shat ial af fleaca cake tl hgh pons Hf not eaupped wi ar eleese Valves tno otto the ity request releses ape a order pss toc, 9, The tet pressure shal be such thatthe ere ppaine or secon being tested i subject 018, {ines te waning presaur. Whon teppei sconce o «pupae ean oe sujet he pumps shut hed du sini ves te woking pressure shal be taken es he Su of Mead of Fre map athe elevation the pump. 10 The los shal not exceed 0.02 te per mm dametsr gar Kiomer per 24 hou for ath bar of hese ppt. 1. the spe a to pa the tat the out salle orate and repaid and he pelo ets Unt posse the pressure et tno adstoal eat othe nity. 12, All expored pipe ings, volves end Jos hal be aly Iepocted uring the test. Any ‘eb iakage sha be epazes fearas otha lume 13, madaion fay tess of naval ans or mor mtr ete which may b speed esawhere, the Conrad: shat submit at parts of he pelins 1 al est I EesrnentFoe ang Opens I 8. Prossuretstng apant vos. ‘The Corrector shou nota that ence valves cannot be guard 1 be petty dito {eving agin sored valves comected ousting or operaing etre sal ole permfg. ‘Testng sgn other lose ves (cing a Yes) rot so onnectod may bested [ eared provdesthe vales are sufably anchored againel thst and rated forthe Tul fest [ 2. Teng epant vate chambers or other srctres wil alo be robe 3 No aims wi be entertained on aosourt of aking wales, o any cer iui encountered ‘noting te ison of cera ange of pipe work a tata, ©. In sation 10 any tests of Individual joints or other interim tests, which may be, speciied ‘Seownere the Contovor sal aa pare ha ppeines ater ai sootone have Dea ones {p-ainainyaosiate est operating peste i 1. The test shall be conduced as requied for Ine dvds! eaton exept that He a pressine ‘haus set alhe seal operating pressure [ . A mecedent tthe ae of Cate of Complete shat bata valet te poelne {.STve an staely peraad unser wregpresrore an hea he pipes sh fae icon sccesiulypreetteosed and toaes t 208 NTERM PRESSURE TESTING OF PRESSURELNES ‘A. Allpressure lings nthe syst shave given an trim result ter backing l 4 Ones noted otnerne al results shal be concute at 5 tes he Waring Posse oF ‘hemacmam shat nes, whchoveris Maer [ 8. Pipaine shat be dived nto setns rat exceeding 1000m north ness ohewse approved by the Engines [ © Contactor shat submit othe Engineer dead prcosdues for performing hysostnc presse ‘eater isate pining, ings, valves, meters ard appurtenances ri 1. i roqured, stable slop ende(2ston of tet pips abet 05-1 Om long onto whith a cling plate [ hae boon woe) contaning te necessary openings fr aecormodatng gong wale 2 ou Coming ar maybe utzed ctr he os 1. Sap nd ay ao ince a epeing ough whch te test wer maybe amgesem he 2. Stop and may be Joetad tothe pipe to be tasted by means of standard coping, or oer ‘mote aprevedby he Enginoe 2. Thus looks or tomporary anchorages shal e provided chad tho stop endin lace against no 4 Conactormay also use ropetary attained joisiney of hustle. Procedures fr perming hyostate pressure lest fo ech sation of pple sal fom pat of ‘he Contactors iehos Statement ané shal nese a ern: {ooaton and capac of te et pu. Test pees lhe puss wel as hat ate hphes and owes pons. recaares for ventngine arom the aipeine. Disposal fn nator ator sateen ach piptine or section tea! sha be fed wh water and ala removed as fr posse Irpemanant ar ents se nt ecsed at ab high por he Contato sol msl sual cocks L a soc pos, 2 hate “Desi, Canavan, upan Furae an Ope iounaen of Fanvansh Hsp G. Line shat ted swt prevent posi water hammer. H. Test pump and gauge shal be connaces tothe pipsine ata locaton eter tan ne ghee pont Intnelin facta te relonse ofa rom he highest po. pecebie 1L_ Aner ting and netere sptcaton of tho test pressure, maintain the test secon Pressure ors etandng perio fmt oss han 24 hours to achieve avatars a8 fortotng 4. The tamdng period wil commence ‘fom the time at which the rated pressure was reached 4 neater appreciable movement ofthe pipeline, ner any lskage has bn obese ding he ‘sanding pao te Secon shot be sibjectedta the speedtest presau. K. Pumping shat be resumed nd the possue slowly raced 10 the spoiied test pressure at the Mest pontine ppsne (or ston under le, proved tthe presse ale west ont of pele (or escon snort) shal at exceed tne maxim allowsbetest presi LT spect tet pressure shat be contmuousy mantains by he uss of the pup fra pero of Stewraaly measurea and record Ee nearest 18 Ie) regu. fast onsy 30 mites Throughout te tet 1, Petne shat be doomed to have passed he lst 1 Nowatorsvisty coming otf te pip or jin at ny po. 2. Aeount of mako-p wer reid does nl exceed the ate of O02 te per mime of pipe ‘aber, par tmeter ef oee, para our foreach 30 mer han of prose apptes af Nour of he test pore, when no urher makes Welermay be pumped) sh 4. HOPE presture pigsine tig shal flow the procedure etaed in Tender Domenie or MPW Requirement. 1X. Should tee 5 the Contact shall this own expense, replace defective fpes oF fing, ‘apa laking nts cherie rectly detecve war, (© Cleaning, inspecton and testing shall hen be repeated unt the work is socepted by the Engineer ane ox cot tae int. 1300 FINAL PRESSURE TESTING OF PRESSURE LINES [Avater ter losing he been sastocrly compiled, al pressure Ines shall be given fal presaute eat fo Be cared out on Be entre engi of he pipeine, afer at secons have been ood togaber 8. Final posing test pressures and procedures shall be conducted ae deterBes under intern pressure esting C Vatee and al ppeine appurtenances when bey oe ale, 7a be hysralealy tested, together wit the pipe in 1. Vatee shal be ested or operation under working pressure 1. ahs shal be adjusted so hat they operate smoctny, seat propery and are isaled to tolerance recommended by he manufacture ‘Say Goneape Sy Seg Sesion, Egon Foe wd Opi 2310. SEWAGE MANHOLES ANOWET WELLS papers p: 18 16 ", Mictovsre gSdten ct Fenn ea Unless nse therwise, manhole salle consractson otal sewers: ‘leach etange of yale or arecion teach cangein dametr veh nervosio hehe spe ‘eh eter oii 2 shown ene Drawings. ‘erecta byte Engineer ners work set ot bagi ont the pipe fitigs tobe cast nt the manhole wa, ae on se ‘e"box ov wi be nlowed, less epproves by the Enger "Threat ne manne shall be eae. waterproofed ana bckiled os quehy 2 esse. (Channel inverts shallbesccursoly ado meetin vert eevatens. CChanre Sends inthe benching ar 10 be as "sow at pose, by setng te manele "o- ‘meat changes in drecton [NI ppsines edoning sutures (eat entes and ex to manhok) shal have 2 flexble it ‘djconta each cucu, ae deafedon the erawns. ‘Unas noted aterisa, all sewage manole shal ave potectve GRP hing, berching and tos, ‘contomingo Sexton 06810” Gaus Renerod Pash Fabcaons. Berching shal bo formed wth insta C4020 mace conte with exposed ih, protected by ‘nm tack chemicaby resist (opxy) mora shed vl Unies otto noted, al exterior surfaces below grade shall be coved wit watrroof ‘mambranenaestdance wih Seton O7130- Wateprotng. Unless noted aera, ot extror exposed conte surtaces shal be epoxy coed according anole covers in rac areae shall be zt to te paved area pole and be fs wih he paves ‘wensursca Manolo covers located in nontaic seas stall be set to an elevaten as shown en he ‘Sawnge. or taco by fe Engineer Unless otherwise noes Unless noted these, and raog sal be stains te! Type 316 ing bots and other haroware shal be sa ibe Sm narnia see anes nted ene. ‘wner dap manhole ae inated ey sha be as shown onthe Drawings and sl be omic ‘hore tho 'upeear tengo tewer ears mantle ats eve! mabe gate ebove the ‘Almantoles hale watetghton completion. ances shal be fst in ctodanca wt th equcerete ofthis aus, ‘The Contactor shall take all massures, dered necessary by the Enghoe, 1 ensuro that ‘annsts ae olefin a oodod or unpeeled condition Fine designated covers ar nt on ste star lan the cover lb, a omporaryphwcod cover hall be soarly tes al openinas Becksropeta anoles (Pines & Figs) ‘These. sal be consucted verily adjacent 10 the extemal face of he mane shat, ner {Gene tne vet nena ha manhole Demaitono Replacement ot Manhole Where an-aetag manhse ie 12 be demolened, of remoed, por 16 the cnsbucton of ee antle shalbe denotes andthe gebis ramos fo eston 092 9608 shall ste! Type 316 of any or auorty hav a Fo Osea 12 anette cove sab sha be carey boken to ecover he ame and cover, which shal be tken tothe dsgnata Minety sore. 1. Manoles manuecured ftom Pobmer Concrete shal mest the folowing minum standorts {aul deta sabe submited iar revew and approval he Engnoor 1. Alesis hal be voy aster 2. Manhole stu shal have sufcent weg to preven easton, . Manhole covers habe nove except fr 10 percont oh tal number. Th 10 percent hal De'vaned and supoted win sctvatd exbon fier Sastla The Vented uns sha Be tae there shown on he ajc! Orgs ots dete bythe Enginoat £11 PUMPING CHAMBERS AND OTHER STRUCTURES A. Genera 1. For any pressure mains win the sytem, vane chambers andl junction chambers shal be ‘oneness each nerecion vith tor plpes and at ober pose sown an he spproved Srawigs ‘Conse wrk shal at beg unl ihe pipe ings to Be cst int the charter wal ro sto. ‘Fhe he chamber shal be ae, wer posted and bckliled es queky ae pss. ‘Noboru wb sowed Ai pcs ac ino ‘amber wate shall be fed. wih 2 tenporay ina "Io" to ensure {hat ‘proper aignment and flange steriaton = matanes between al reonacing pes ana ‘tinge ering carta 1. ligetnay be made am UPVC plpas, HOPE pipes or te! big |. Shorting of ie wh lexi inte sal be provided alent and we al chanbers 44 Unless othenvite shown on the deawings, all eer tutes teow grade stall bo covered ‘ath waterroat membrane maocrdance wih he apeticatn. 5. Unless cerwise ted. ll intr and exer expoted sufacee shel bo epoxy coated scoring MPH Requrarins. 6. Manoa covers i rac areas shall beset othe paved aeaprfle and be fu wih he paves ‘renvursca 71 Mantols covers laced in non‘atic teas shall be set to an elvaton as shown onthe Srawnge or ae see by be Engine 8. Hand rating, shown on the rawings shal be lumii. 8. Allfng bots and other hardware habe sans sol Typ 316 5. Safty chains and cher nacnare ae requted shal to sainoes sto! Type 36, Sas thatbeanm, iets noted oherwes 0, lcnambers shat be waterigton compelon No testing tor testoge of water imo enambers shal Be conducted, unless ne opinion ofthe Engine his doomed necessary 11. The Contactor sha ake all measures, deemed nacassary by be Enger, o ener that “hambors are ration 3 foosed oe ipctaciedcondion 1. Hine designated covers ave not on se sor ptong he cover alah 2 tmparay plywood cover fhallbe securely tied allporings. {3.42 MANHOLE TESTING A. The Contstr shal es 10 gorent ofall manole,o be selected at endom by he Engner 8: Mangagarsite tysosiatcay teste tot lest one neve above he cow of Be highest z = Sens bg ete

You might also like