Professional Documents
Culture Documents
DeterminationofWall"U"Value
2
5
4
9
24
8
3
1
1
1
1
R1
R2
"R"atInsulation
"R"atStructure
0.17
0.80
0.97
11.00
*
0.45
0.68
N/A
N/A
N/A
N/A
14.07
0.17
0.80
*
*
4.38
0.45
0.68
N/A
N/A
N/A
N/A
6.48
Outsidesurface,15mphwind
FaceBrick,4"
AirCavity,4"
Mineralfiberbattinsulation,R11
Woodstud,nominal2x4
Gypsumwallboard,1/2"
Insidesurface,stillair
N/A
N/A
N/A
N/A
Rtotal=
R=(%AreaxR1)+(%AreaxR2)
%AreaatInsulation=
0.75
%AreaatStructure=
0.25
R=
12.1725
BTUH*sq.ft.*F
U=1/R
KnownUValue=
U=
05/12/2016
BTUH*sq.ft.*F
0.0822
BTUH*sq.ft.*F
Page 1