ENGINEERING STANDARDS AND GUIDELINES FOR MARITIME
STRUCTURES

COPYRIGHT
NSW Maritime
This Document is copyright. No part of this Document may be reproduced or copied in any
form or by any means, electronic or mechanical, including photocopying, without the written
permission of the Chief Executive, NSW Maritime.
Published by NSW Maritime, Locked Bag 5100 Camperdown NSW 1450. All enquiries to be
addressed to the Chief Executive, NSW Maritime.
___________________________________________________________________________________
First Edition - March 2005

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

DISCLAIMER
Every effort has been made and all reasonable care taken to ensure the accuracy of
the material contained within this Document.
However, the Waterways Authority trading as NSW Maritime does not accept any
liability or responsibility in any way whatsoever and expressly disclaims any liability
or responsibility for any loss, damage or costs howsoever incurred by any person as
a result of or in connection with reliance upon any part of this Document.
Where required, independent advice from competent professional persons should be
sought on matters covered in this Document.

___________________________________________________________________________________
First Edition - March 2005

Disclaimer

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

CONTENTS
Page

SECTION 1

SCOPE AND GENERAL

1.1
1.2
1.3
1.4

General
Reference Documents
Notations
Definitions

SECTION 2

SITE INVESTIGATION

2.1
2.2
2.3
2.4
2.5

General
Survey
Geotechnical
Existing Structures
Assessment

SECTION 3

DESIGN REQUIREMENTS

3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13

General
Australian Standards
Stability
Strength
Serviceability
Durability
Redundancy
Design Life
Scour and Siltation
Sea Level Rise
Disability Requirements
Risk
Health and Safety

SECTION 4

DESIGN ACTIONS

4.1
4.2

General
Imposed Actions

SECTION 5

TYPES OF CONSTRUCTION

5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
5.10

General
Marinas
Wharves, Jetties and Boardwalks
Piles
Ramps
Handrails
Pontoons
Fenders
Boat Ramps
Boatsheds

5
5
5
6

11
11
11
12
12

13
13
14
14
14
14
15
15
15
15
16
16
16

17
17

21
21
21
21
22
22
21
23
23
24

___________________________________________________________________________________
First Edition - March 2005

Contents

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

5.11
5.12
5.13
5.14
5.15
5.16
5.17
5.18
5.19
5.20

Seawalls
Ladders
Davits and Winches
Stormwater Drains
Slipways
Skids
Embankments
Stairs and Steps
Lifebuoys
Demolition

SECTION 6

MATERIALS

6.1
6.2
6.3
6.4

General
Concrete
Steel
Timber

SECTION 7

MAINTENANCE

7.1
7.2

General
Inspections

24
24
24
25
25
25
25
26
26
26

27
27
29
30

32
32

___________________________________________________________________________________
First Edition - March 2005

Contents

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

SECTION 1
1.1

SCOPE AND GENERAL

GENERAL
This Document sets out minimum engineering standards for maritime
structures proposed to be constructed on the NSW Maritime Authoritys
land.

1.2

REFERENCE DOCUMENTS
The following are recommended as useful reference documents.

1.2.1

Design Guidelines for Wharves and Jetties NSW Public


Works 1990
Advice is provided for the planning, investigation, assessment, design,
construction and maintenance of public wharves and jetties. Guidance is
given on pile design and calculating berthing forces.

1.2.2

Marina Guidelines NSW Public Works 1987


Guidance is given on approval processes, site investigation, design
loads, planning, design, materials, safety aspects, services, boat
launching ramps and maintenance of marinas.

1.2.3

Boat Launching Ramps Guidelines NSW Public Works


Department 1985
Advice is provided for the design and construction of trailer-boat
launching facilities. Guidance is given on planning, geometry, materials
and design of boat ramps.

1.2.4

British Standard Code of Practice for Maritime Structures


BS6349
Advice and guidance are given on the planning, design, construction and
maintenance of maritime structures.

1.3

NOTATIONS
CD
Chart Datum.
DWT
Dead Weight Tonnage.

___________________________________________________________________________________
First Edition - March 2005

Scope and General

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

GRT
Gross Registered Tonnage.
H1
Wave height used for the design of structures.
Hs
Significant wave height.
HAT
Highest Astronomical Tide.
ISLW
Indian Spring Low Water.
LAT
Lowest Astronomical Tide.
LOA
Length overall of a vessel.
MHWM
Mean High Water Mark.
MSL
Mean Sea Level.
ZFDTG
Zero Fort Denison Tide Gauge.

1.4

DEFINITIONS
For the purpose of this Document the definitions below apply.
Accretion
The growth of sand banks and other marine deposits by the movement
and settlement of waterborne particles.
Bathymetry
The depth of water in oceans, seas, rivers and lakes.
Beam
The greatest width of a vessel including all permanent attachments.
Berth
An area of water allocated for the wet storage of vessels attached to a
fixed or floating facility and allowing for walk-on access to the vessels.

___________________________________________________________________________________
First Edition - March 2005

Scope and General

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

Boardwalk
A horizontal decked walkway on piered or piled footings, providing
pedestrian access that extends over or beyond the intertidal zone, but not
intended to provide direct access to a vessel.
Boat ramp
A structure designed primarily for the launching of trailer-borne
recreational vessels and includes associated car parking facilities.
Boatshed
A building or other structure used for the storage and routine
maintenance of a boat or boats and which is associated with a private
residence and includes any skid or other structure or device used in
connection with the building.
Breakwater
A fixed or floating barrier in the water to intercept waves and create a
sheltered area to protect vessels and property from storm and wave
damage.
Capwale
A horizontal structural member connecting two or more piles and
providing support for superstructure decking, girders and joists.
Channel
An unobstructed waterway which allows the movement of vessel traffic.
Chart Datum
The datum used on Australian hydrographic charts and other
hydrographic surveys for the specific region. This datum usually
corresponds to the level of LAT.
Chine
The lower external line of any flotation component.
Davit
A mechanical device used for lifting or lowering a vessel out of or into the
water.
Dredging
The removal of material from the sea or harbour bed or the bed of a river
below MHWM.
Fairway
An unobstructed waterway between rows of berths which allows vessel
movement between interior channels and individual berths.
Fender
A buffer, usually made or rubber or timber, to protect vessels and
structures against damage during berthing.

___________________________________________________________________________________
First Edition - March 2005

Scope and General

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

Fetch
The distance over open water across which wind waves can be
generated.
Freeboard
The vertical distance between the still water level and the top of the
flotation unit of a pontoon.
Gangway or Ramp
A structure which provides pedestrian access between a walkway or
shore and a floating structure or vessel.
Girder or Joist
A longitudinal structural member supporting the deck of a boardwalk, jetty
or wharf.
Headstock
A horizontal structural member connecting two or more piles and
providing support for girders or joists. A headstock is generally supported
directly on the top of the piles.
Indian Spring Low Water (ISLW)
Obsolete estimate of LAT formerly used as Chart Datum. Equates to a
reading of zero on the Fort Denison Tide Gauge.
Jetty
A horizontal decked walkway on piered or piled footings providing
pedestrian access from the shore to the waterway.
Landing steps
A set of steps located at the end of a jetty or abutting a seawall or rock
face used for providing access from vessels to the shore.
Length overall
The length of a vessel measured between extremities of fittings.
Marina
A group of pontoons, jetties, piers or similar structures designed or
adapted to provide berthing for vessels used primarily for pleasure and
recreation and may include ancillary works such as slipways, facilities for
the repair and maintenance of vessels and the provision of fuel,
provisions and accessories.
Mean High Water Mark (MHWM)
The position where the plane of the mean of all ordinary local high tides
intersects the foreshore. This is presently 1.48 m above ZFDTG.
Mean Low Water Mark (MLWM)
The position where the plane of the mean of all ordinary local low tides
intersects the foreshore. This is presently 0.415 m above ZFDTG.

___________________________________________________________________________________
First Edition - March 2005

Scope and General

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

Mean Sea Level


The average of the sea surface over a long period, or the average level
which would exist in the absence of tides.
Mooring
A detached or freestanding structure to which a vessel is moored.
Pontoon
A floating platform used for access to the water or a vessel.
Reclamation
An area of dry land that was previously submerged land but now is
enclosed by seawalls that alter the natural line of the foreshore.
Revetment
An inclined face of stone, concrete or synthetic material protecting an
embankment from waves or currents.
Seawall
A structure separating land and sea.
Significant wave height (Hs)
The average height of the highest one third of waves in any given time
interval.
Skid
An inclined ramp used for the manual launching of small craft but does
not include a slipway.
Slipway
A structure, usually in the form of two supported parallel rails on which a
wheeled cradle is run to draw a vessel out of the water for maintenance
and repair and includes any facility over which a vessel or object is
hauled by means of a manually operated or power operated appliance
such as a powered or manual winch, a block and tackle, etc.
Sponson
A rubbing strip, generally at the main deck level, to strengthen and
protect a vessel from berthing impacts.
Stub jetty
A short jetty designed as support for a ramp or gangway to access a
pontoon.
Swimming enclosure
A net or other structure placed in the waterway for the purpose of
providing a protected swimming area.
Vessel
Any boat longer than 5.2 m excluding rowing boats, dinghies and other
non-motorised craft.

___________________________________________________________________________________
First Edition - March 2005

Scope and General

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

Vessel displacement
The total mass of a vessel and its contents.
Wharf
A structure on and parallel to the foreshore alongside which vessels may
lie to load or unload cargo, passengers, etc.
Zero Fort Denison Tide Gauge (ZFDTG)
The hydrographic datum adopted by the NSW Maritime Authority in
Sydney Harbour.

___________________________________________________________________________________
First Edition - March 2005

Scope and General

10

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

SECTION 2
2.1

SITE INVESTIGATION

GENERAL
Site investigations are an essential part of the planning and design of
maritime structures. Consequently, site investigations should be
undertaken to provide sufficient information for the design and
construction of any maritime structure.
It is anticipated that site investigations will be aimed at two levels.
The first level, preliminary investigation, will be aimed at collecting
information to assess whether the proposed facility is feasible. This
assessment will usually be carried out based upon a site inspection and a
review of existing data.
The second level, detailed investigation, will generally proceed following
development consent and will usually be based on detailed hydrographic
surveys and geotechnical investigations.

2.2

SURVEY
Hydrographic surveys are required in order to determine the available
depth of water and in particular to determine whether any dredging will be
necessary in order to accommodate the proposed structure. Reference is
made to the NSW Maritime Authoritys Guidance Note GN 03 Depths in
Berths and Fairways.
Hydrographic surveys shall be undertaken in accordance with the NSW
Maritime Authoritys Guidance Note GN 01 Provision of Hydrographic
and Geotechnical Data.

2.3

GEOTECHNICAL
Geotechnical investigations are required in order to determine the
properties and constituents of the seabed and underlying rock strata and
the depths of the various layers comprising the seabed.
Information required from an investigation might include some or all of the
following:
(a)
(b)
(c)
(d)
(e)
(f)
(g)

soil, sediment and rock classification;


grain size distributions and shape;
in-situ soil density;
stratigraphy;
soil strength parameters;
soil deformation parameters and;
chemical composition of any sediments to be dredged.

___________________________________________________________________________________
First Edition - March 2005

Site Investigation

11

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

Geotechnical investigations are generally performed under the direction


of specialist geotechnical engineers and geologists.
Geotechnical data shall be collected in accordance with the NSW
Maritime Authoritys Guidance Note GN 01 Provision of Hydrographic
and Geotechnical Data.

2.4

EXISTING STRUCTURES
Any existing structures on the site need to be considered during the
planning and design of proposed new structures.
In particular, site investigations should consider the following aspects:
(a)
(b)

2.5

whether any part of an existing structure is suitable to be


incorporated into the new structure; and
where any part of an existing structure will become redundant,
demolition of same.

ASSESSMENT
Together with the above, site investigations should also include
assessment of the following aspects:
(a)
(b)
(c)
(d)
(e)
(f)

wind climate;
wave climate;
currents;
water levels (tidal range, storm surge, flood levels, seiching);
coastal processes (accretion, erosion); and
services.

For further guidance on these aspects, reference is made to the British


Standard Code of Practice for Maritime Structures BS6349 and
Standard Australias - DR 02536 - Guidelines for Design of Maritime
Structures.

___________________________________________________________________________________
First Edition - March 2005

Site Investigation

12

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

SECTION 3
3.1

DESIGN REQUIREMENTS

GENERAL
The design of maritime structures proposed on the NSW Maritime
Authoritys land shall take into account, as appropriate, stability, strength,
serviceability, durability and redundancy.
The design shall be carried out in accordance with appropriate Australian
Standards together with the requirements of this Document. Where this
document and the appropriate Australian Standards conflict, the requirements
of the Australian Standards will prevail to the extent of the conflict.

3.2

AUSTRALIAN STANDARDS
Commonly used Australian Standards for the design of elements of
maritime structures include the following.
AS/NZS1170.0

Structural design actions General principles

AS/NZS1170.1

Structural design actions Permanent, imposed and


other actions

AS/NZS1170.2

Structural design actions Wind actions

AS/NZS1170.4

Minimum design loads on structures Earthquake


loads

AS1428

Design for access and mobility

AS/NZS1664.1

Aluminium structures Limit state design

AS/NZS1664.2

Aluminium structures Working stress design

AS1657

Fixed platforms, walkways, stairways and ladders


Design, construction and installation

AS1684.1

Residential timber framed construction Design


criteria

AS1720.1

Timber structures - Design methods

AS2159

Piling Design and installation

AS3600

Concrete structures

AS3962

Guidelines for design of marinas

AS4100

Steel structures

DR02536

Guidelines for design of maritime structures

___________________________________________________________________________________
First Edition - March 2005

Design Requirements

13

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

Generally these Standards are strength limit state or ultimate limit state
design though some are working stress design.

3.3

STABILITY
The structure and its elements shall be designed for static stability under
overturning, uplift and sliding and for dynamic stability. Appropriate
combinations of design actions shall be considered so that stability loads
and other actions exceed the destabilising loads and other actions.

3.4

STRENGTH
The structure and its elements shall be designed for strength in
accordance with appropriate Australian Standards together with the
requirements of this Document as follows:
(a)
(b)
(c)
(d)

Determine the appropriate loads and other actions;


Combine and factor the loads to determine design loads for
strength;
Determine the design action effects for the structure and its
elements for each load case; and
Determine the design strength.

The effects of fatigue from wind, wave and current action under normal
conditions shall also be considered.

3.5

SERVICEABILITY
The structure and its elements shall be designed for serviceability by
controlling or limiting settlement, horizontal displacement and cracking.
Under the appropriate load combinations for serviceability design, vertical
deflection shall be limited in accordance with the requirements of the
appropriate materials Standards.
Horizontal deflection and acceleration limits for trafficable structures shall
be limited to a maximum deflection of l /150, where l is the distance
between underside of the deck structure to the level of the support in the
seabed, and a maximum acceleration of 0.1 g.

3.6

DURABILITY
The structure and its elements shall be designed for durability in
accordance with this Document.

___________________________________________________________________________________
First Edition - March 2005

Design Requirements

14

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

3.7

REDUNDANCY
Consideration should be given in the design of the structure and its
elements to allow for redundancies to prevent failure of the structure in
the event of the loss of a critical element.
For example, when designing a timber capwale supported by timber
piles, consideration should be given to specifying at least one additional
bolt than that required for strength purposes at the capwale/pile
connection and/or notching the capwale into the pile.

3.8

DESIGN LIFE
Design life is the period of time for which a structure or an element of the
structure remains fit for use for its intended purpose with appropriate
maintenance. The design life of maritime structures will depend on the
type of facility, the intended function and the applicants requirements.
Design life should be based on consideration of capital and maintenance
expenditure. The designer, in consultation with the applicant, should
determine an appropriate maintenance regime consistent with the
adopted design and materials that will achieve the design life.
Particular care should be taken when considering design life and
maintenance regimes for inaccessible elements of the structure. Such
elements should have a design life (with no maintenance) equal to the
design life of the structure.
At the end of its design life, the structure should have adequate strength
to resist ultimate loads and be serviceable, but may have reached a
stage where further deterioration will result in inadequate structural
capacity.
Guidance on design life is given in Standard Australias - DR 02536 Guidelines for Design of Maritime Structures. It is recommended that a
minimum design life of 25 years be adopted for maritime structures.

3.9

SCOUR AND SILTATION


The structure and its elements shall be designed to remain stable, of
sufficient strength and not become over-stressed in the event of
temporary or permanent changes in the level of the seabed due to scour
or siltation.

3.10

SEA LEVEL RISE


Structures shall be designed to allow for future sea level rise caused by
global warming.

___________________________________________________________________________________
First Edition - March 2005

Design Requirements

15

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

Guidance on the amount of sea level rise to be considered is given in


Standard Australias - DR 02536 - Guidelines for Design of Maritime
Structures.

3.11

DISABILITY REQUIREMENTS
Structures which will be utilised by the public shall be designed to provide
access for disabled persons in accordance with AS1428 and the
Commonwealth Governments - Disability Standards for Accessible
Public Transport Guidelines 2001 and this Document.
Aspects that are to be considered and addressed in the design include,
but are not limited to the following:
(a)
(b)
(c)
(d)
(e)

3.12

Ramp slope;
Lighting;
Obstructions;
Tactile surfaces; and
Rest points.

RISK
Consideration shall be given in the design of the structure and its
elements to firstly identify, then minimise or remove risks to future users
of the structure.
Examples of potential risks to users include, but are not limited to the
following:
(a)
(b)
(c)
(d)
(e)
(f)
(g)

3.13

Tripping;
Slipping;
Falling;
Pinch spots;
Inadequate lighting;
Inadequate safety and rescue equipment; and
Inadequate egress points from the water.

HEALTH AND SAFETY


The design of all structures to be used by the public or to be used in a
workplace shall take into consideration occupational health and safety
requirements in accordance with the Occupational Health & Safety Act
2000 and Workcover NSW.

___________________________________________________________________________________
First Edition - March 2005

Design Requirements

16

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

SECTION 4
4.1

DESIGN ACTIONS

GENERAL
The design for ultimate strength, serviceability, stability and other relevant
limit states shall take into account appropriate design actions in
accordance with AS/NZS1170 and Standard Australias - DR 02536 Guidelines for Design of Maritime Structures except as modified by this
Document.
In particular, the following design actions shall be considered, where
appropriate:
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(j)

permanent actions (dead loads);


imposed actions (live loads);
wind actions;
current and debris actions;
hydrostatic actions;
wave actions;
construction and maintenance actions;
lateral earth actions;
boat wash; and
earthquake actions.

Combinations of design actions shall be considered generally in


accordance with AS/NZS1170 and Standard Australias - DR 02536 Guidelines for Design of Maritime Structures.

4.2

IMPOSED ACTIONS

4.2.1

Marinas
Minimum live loads for marinas shall generally comply with AS3962.
Fixed structures, other than gangways, shall be designed for a minimum
uniformly distributed live load of 5.0 kPa or a minimum concentrated live
load of 4.5 kN whichever produces the more adverse effect.
Gangways shall be designed for a minimum uniformly distributed live load
of 4.0 kPa or a minimum concentrated live load of 4.5 kN whichever
produces the more adverse effect.
Floating structures shall be designed for a minimum flotation load of 3.0
kPa or a minimum stability load of 2.0 kPa.

___________________________________________________________________________________
First Edition - March 2005

Design Actions

17

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

4.2.2

Wharves, jetties and boardwalks


Minimum live loads for wharves, jetties and boardwalks shall generally
comply with Standard Australias - DR 02536 - Guidelines for Design of
Maritime Structures.
Wharves, jetties and boardwalks subject to pedestrian traffic only shall be
designed for a minimum uniformly distributed live load of 5.0 kPa or a
minimum concentrated live load of 4.5 kN whichever produces the more
adverse effect.
Where wharves, jetties and boardwalks are subject to access by
emergency and service vehicles such structures shall be designed for a
minimum uniformly distributed live load of 10.0 kPa or a minimum
concentrated live load of 45.0 kN whichever produces the more adverse
effect.

4.2.3

Ramps
Ramps leading from wharves, jetties, boardwalks or the like shall be
designed for a minimum uniformly distributed live load of 4.0 kPa or a
minimum concentrated live load of 4.5 kN whichever produces the more
adverse effect.

4.2.4

Handrails
Minimum live loads for handrails, including handrails associated with
gangways and ramps, shall generally comply with those given for
guardrails in accordance with AS1657 Clause 2.1.2.2.

4.2.5

Pontoons
Pontoons shall be designed for the minimum flotation and stability loads
as shown in the following table.

CATEGORY

FLOTATION LOAD * (kPa)

STABILITY LOAD ** (kPa)

Private

1.5

1.5

Home Units

2.0

2.0

School/Club

2.0

2.0

Marina

3.0

2.0

Public

3.0

3.0

Flotation load to be applied over the whole of the pontoon deck area and ramp
where applicable. For pontoons that will support shelters or building structures, the

___________________________________________________________________________________
First Edition - March 2005

Design Actions

18

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

flotation load shall also be applied to the whole of the roof area of such shelters or
structures.
**

4.2.6

Stability load to be applied in the most adverse locations over the pontoon deck
area and ramp where applicable with consideration being given to pattern loading.
For pontoons that will support shelters or building structures, the stability load shall
also be applied to the roof area of such shelters or structures.

Fenders
Fenders shall be designed so that the deceleration of
vessel/acceleration of the berthing structure does not exceed 0.1 g.

the

In deriving the berthing energy of a vessel, the eccentricity factor Ce shall


be taken as 1.0.

4.2.7

Boat ramps
Boat ramps shall be designed for a minimum uniformly distributed live
load of 10.0 kPa or a minimum concentrated live load of 45.0 kN
whichever produces the more adverse effect.

4.2.8

Boatsheds
Minimum live loads for boatsheds shall generally comply with the Building
Code of Australia.

4.2.9

Seawalls
Subject to recreational use only of the land behind the seawall, seawalls
shall be designed for a minimum uniformly distributed surcharge live load
of 5.0 kPa.

4.2.10

Ladders
Minimum live loads for ladders shall generally comply with AS1657
Clause 2.1.2.5.

4.2.11

Skids
Skids shall be designed for a minimum uniformly distributed live load of
4.0 kPa or a minimum concentrated live load of 4.5 kN whichever
produces the more adverse effect.

4.2.12

Stairs and steps


Steps shall be designed for a minimum uniformly distributed live load of
4.0 kPa or a minimum concentrated live load of 4.5 kN whichever
produces the more adverse effect.
Minimum live loads for stairs shall generally comply with AS1657 Clause
2.1.2.4.

___________________________________________________________________________________
First Edition - March 2005

Design Actions

19

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

4.2.13

Marine growth
It is recommended that in stability calculations for concrete pontoons
allowance is made for marine growth with a minimum buoyant weight on
all submerged surfaces of 15 kg/m2.
Fibreglass pontoons are generally not affected by marine growth.

___________________________________________________________________________________
First Edition - March 2005

Design Actions

20

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

SECTION 5
5.1

TYPES OF CONSTRUCTION

GENERAL
Requirements are given below in relation to various types of construction
for which the NSW Maritime Authoritys approval is sought.
These requirements are not exhaustive and designers shall investigate
and determine the requirements relevant to the type of construction for
which approval is being sought.

5.2

MARINAS
Marinas shall be generally designed in accordance with AS3962.
Marina berths and fairways shall comply with the NSW Maritime
Authoritys - Guidance Note GN 03 - Depths in Berths and Fairways.

5.3

WHARVES, JETTIES AND BOARDWALKS


Wharves, jetties and boardwalks shall generally be designed in
accordance with Standard Australias - DR 02536 - Guidelines for Design
of Maritime Structures.
Wharves, jetties and boardwalks shall be designed so as not to impose
lateral loads on existing seawalls.
Wharves, jetties and boardwalks providing for disabled access shall be
designed in accordance with AS1428 and the Commonwealth
Governments - Disability Standards for Accessible Public Transport
Guidelines 2001.
Wharves, jetties and boardwalks shall have a minimum clear width of 1.8
m.

5.4

PILES
Piles shall generally be designed and installed in accordance with
AS2159.
Consideration shall be given to achievable tolerances when installing
piles over water when designing elements of structures to later be
connected to such piles.
Consideration shall be given to marine growth when designing piles.

___________________________________________________________________________________
First Edition - March 2005

Types of Construction

21

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

Where timber piles are used they shall have a minimum toe diameter of
300 mm.

5.5

RAMPS
Ramps leading from wharves, jetties, boardwalks or the like shall
generally be designed in accordance with Standard Australias - DR
02536 - Guidelines for Design of Maritime Structures.
Attention shall be given to the design of connections and appropriate
bracing where lateral loads from the end of the ramp are being
transferred to the jetty.
Ramps for facilities providing for disabled access shall be designed in
accordance with AS1428 and the Commonwealth Governments Disability Standards for Accessible Public Transport Guidelines 2001.
Ramps shall have a minimum clear width of 1.2 m.

5.6

HANDRAILS
Handrails shall generally be designed in accordance with AS1657.
Handrails for facilities providing for disabled access shall be designed in
accordance with AS1428 and the Commonwealth Governments Disability Standards for Accessible Public Transport Guidelines 2001.

5.7

PONTOONS
Pontoons shall be stable under the most adverse combination of dead
and live loads applied to the pontoon deck. Under such loads, unless
permitted otherwise, the following requirements shall be met:
(a)

(b)

(c)
(d)

For pontoons with a rectilinear flotation system, the minimum


freeboard shall be the greater of 50 mm or 5% of the moulded
depth of the pontoon, measured from the top of the flotation unit;
For pontoons with a horizontal cylindrical flotation system, the
minimum freeboard shall be the greater of 50 mm or 25% of the
diameter of the cylindrical float, measured from the top of the
flotation system;
The pontoon chine shall not emerge; and
The angle of tilt shall not exceed 15 degrees.

Consideration shall be given to marine growth when designing pontoons.


Pontoon stability shall be calculated in accordance with the metacentric
height method.
___________________________________________________________________________________
First Edition - March 2005

Types of Construction

22

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

Any restraint from adjacent piles or moored vessels shall not be taken
into account in calculations for pontoon stability.
Pontoons composed of a number of compartments shall be designed so
that the stability requirements above are met with a single compartment
flooded. All compartments should be accessible from hatches in the
pontoon deck and consideration should be given to ventilation of all
compartments.
Pontoon decks shall be designed to have a positive fixing to the flotation
unit. Such fixings shall be capable of supporting the deck in the event the
pontoon turns over.
Consideration should be given to the ride of the pontoon together with
its suitability for the proposed wave and wind climate. Factors such as
weight, freeboard and form of restraint shall be considered in the pontoon
design.
For certain types of pontoons involving a stepped or sloped deck the
NSW Maritime Authority may give consideration to varying the above
stability requirements and may permit part of the deck to become
submerged. Such pontoons will be considered on a case by case basis.
The minimum depth of water required to accommodate a pontoon shall
generally comply with Clause 3.3 of the NSW Maritime Authoritys Guidance Note GN 03 - Depths in Berths and Fairways. This depth of
water shall be provided under the pontoon and for a minimum distance of
500 mm measured in plan around the pontoon perimeter.

5.8

FENDERS
Fenders shall generally be designed in accordance with Standard
Australias - DR 02536 - Guidelines for Design of Maritime Structures.
Proprietary fenders are recommended to be used and in these instances
manufacturers catalogues will assist in the selection of an appropriate
fender.
Absorption of a proportion of the berthing energy through deflection of the
vessel hull is not recommended. Consideration should be given to not
exceed the vessel hull pressure when berthing.

5.9

BOAT RAMPS
Boat ramps shall generally be designed in accordance with the Public
Works Departments - Boat Launching Ramps Guidelines.

___________________________________________________________________________________
First Edition - March 2005

Types of Construction

23

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

5.10

BOATSHEDS
Boatsheds shall generally be designed in accordance with AS1684 and
the Building Code of Australia.
Attention shall be given to the design of connections and in particular
bracing and tie-down details to resist wind loads.

5.11

SEAWALLS
Seawalls shall generally be designed in accordance with Standard
Australias - DR 02536 - Guidelines for Design of Maritime Structures and
AS4678.
Where applicable, seawalls shall be designed taking into account the
recommendations made in the NSW Maritime Authoritys Guidelines for
Waterside Works Subject to Rivercat and Harbourcat Wash.
Allowance shall be made in the design for the loss of at least 600 mm of
material from the seaward face of the seawall unless the seawall is
founded on rock.
Seawalls shall be designed to incorporate drainage holes together with a
suitable filter layer to relieve water pressure behind the seawall.

5.12

LADDERS
Ladders shall be installed to permit access to and from the water where
suitable alternate access is not possible in close proximity to a maritime
structure.
Ladders shall generally be designed in accordance with AS1657 as stepthrough ladders.
The maximum spacing between ladders shall not exceed 50 m unless
there are objects located between ladders that a person in the water can
hold on to as they attempt to make their way to a ladder. In such
situations the maximum spacing between such objects and between such
an object and a ladder shall not exceed 10 m.
The ladders rungs shall extend from deck level down to below low water
level with the bottom rung 300 mm below LAT.

5.13

DAVITS AND WINCHES


Davits and winches shall generally be designed in accordance with
AS1418.
Davits and winches shall comply with the requirements of the WorkCover
Authoritys - Construction Safety Branch - Requirements for Shore
Mounted Cranes and Hoists .

___________________________________________________________________________________
First Edition - March 2005

Types of Construction

24

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

Proprietary davits and winches are recommended to be used. In these


instances, applicants should ensure that the manufacturer is prepared to
supply a certificate indicating that the davit or winch has been designed in
accordance with the above requirements.

5.14

STORMWATER DRAINS
Stormwater drains shall generally be designed in accordance with the
NSW Maritime Authoritys - Guidance Note GN 100 Stormwater
Discharge.

5.15

SLIPWAYS
Slipways shall generally be designed in accordance with Standard
Australias - DR 02536 - Guidelines for Design of Maritime Structures.
A minimum horizontal clearance of 600 mm over a vertically projected
height of 2 m shall be provided each side of the slipway between the
vessel cradle and any other object during slipway operations.
Vessel cradle track wheels shall be guarded to prevent persons
becoming trapped between the leading face of the track wheel and the
slipway rail.
Winch controls shall be located so that the vessel cradle remains in full
view of the operator during slipway operations.

5.16

SKIDS
Skids shall generally be designed in accordance with Standard
Australias - DR 02536 - Guidelines for Design of Maritime Structures.
Skids shall be designed to provide a safe foothold. This can be achieved
by means of spaced decking or the use of cleats. Where cleats are used
they shall comply with AS1657 Clause 3.1.2.

5.17

EMBANKMENTS
Embankments shall generally be designed in accordance with the US
Armys Shore Protection Manual.
Where applicable, embankments shall be designed taking into account
the recommendations made in the NSW Maritime Authoritys Guidelines
for Waterside Works Subject to Rivercat and Harbourcat Wash.

___________________________________________________________________________________
First Edition - March 2005

Types of Construction

25

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

5.18

STAIRS AND STEPS


Stairs and steps shall generally be designed in accordance with Standard
Australias - DR 02536 - Guidelines for Design of Maritime Structures and
AS1657.
Steps shall have a minimum clear width of 1.8 m.
Stairs shall have a minimum clear width of 1.2 m.
Steps in the tidal zone shall be provided with an antiskid treatment.

5.19

LIFEBUOYS
Lifebuoys shall be provided on all public facilities.
Lifebuoys shall be located in order to cover the water area a distance of
10 m measured in plan around the perimeter of the public facility.
Lifebuoys shall generally comply with the Australian Maritime Safety
Authoritys Marine Orders Part 25 Appendix 1.1.
Lifebuoys shall be fitted with a buoyant lifeline which shall comply with
the Australian Maritime Safety Authoritys Marine Orders Part 25
Appendix 1.4.

5.20

DEMOLITION
Demolition shall generally be carried out in accordance with AS2601.
All demolished materials shall be removed from site and disposed of in
an approved manner in accordance with AS2601.

___________________________________________________________________________________
First Edition - March 2005

Types of Construction

26

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

SECTION 6
6.1

MATERIALS

GENERAL
Maritime structures are usually located in very aggressive environments.
Materials for maritime structures shall be chosen so that the structures
are capable of withstanding this environment and achieving the required
design life in conjunction with an appropriate preventative maintenance
programme.
Materials shall generally comply with the durability requirements specified
in Standard Australias - DR 02536 - Guidelines for Design of Maritime
Structures and appropriate Australian Standards.
Whilst this Section only deals with the use of typical materials, it does not
preclude the use of other materials.

6.2

CONCRETE

6.2.1

General
The deterioration of concrete maritime structures is predominantly caused
by the corrosion of steel reinforcement and prestressing tendons as a
result of chlorides in the marine environment coming into contact with
steel.
Steel corrosion shall be minimised by designing durable concrete
structures and limiting concrete crack widths. Common methods used to
achieve the above include, but are not limited to the following:
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(j)
(k)
(l)

use of plain concrete members;


use of high strength, low water to binder ratio concrete mixes;
use of chemical absorption agents in the concrete mix;
use of pore blockers in the form of admixtures to wet concrete or
surface applications to finished concrete;
painting of concrete members;
use of non corrosive reinforcement such as galvanised steel,
stainless steel, plastic filament and carbon fibre;
designing for low stresses in steel reinforcement;
minimising the use of thin sections particularly in the wetting and
drying zone;
encapsulating prestressing tendons in watertight plastic conduits;
use of epoxy coatings to reinforcement;
use of cathodic protection systems; and
careful attention to structural detailing particularly with respect to
constructability and maintainability.

Care shall be taken by designers in specifying high strength concrete


(concrete with a characteristic compressive strength above 50 MPa) in
___________________________________________________________________________________
First Edition - March 2005

Materials

27

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

order to improve durability. Further advice regarding the use of high


strength concrete is given in Standard Australias - DR 02536 Guidelines for Design of Maritime Structures.

6.2.2

Maintenance Considerations
If normal (carbon steel) reinforced concrete is used repairs would be
expected after about 25 years and thereafter at about 5 to 10 year
intervals. A higher grade of reinforcement and/or concrete may extend
the life to the first repairs.
Repairs will require the removal and replacement of deteriorated concrete
and reinforcement. Consideration should be given to the following:
(a)
(b)
(c)

the ability to access the repair location including the need for any
scaffolding;
the ability to remove and contain waste materials during repairs;
and
the ability to apply and maintain an adequate curing regime to the
repairs.

Saltwater washdown of concrete members should be avoided.

6.2.3

Structural Design
Concrete maritime structures and elements shall generally comply with
the design and performance requirements of AS3600 together with the
requirements of this Document.

6.2.4

Material Requirements
Requirements for concrete, reinforcement and prestressing steel shall
generally comply with Standard Australias - DR 02536 - Guidelines for
Design of Maritime Structures.

6.2.5

Exposure Classifications
Exposure classifications for concrete elements shall be determined
generally in accordance with Standard Australias - DR 02536 Guidelines for Design of Maritime Structures.

6.2.6

Cover to Reinforcement
Minimum requirements for cover to reinforcement shall generally comply
with Standard Australias - DR 02536 - Guidelines for Design of Maritime
Structures.

6.2.7

Crack Control
Crack widths shall be limited by designing structures with low stresses in
the reinforcement. Maximum allowable reinforcement stresses shall

___________________________________________________________________________________
First Edition - March 2005

Materials

28

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

generally comply with Standard Australias - DR 02536 - Guidelines for


Design of Maritime Structures.

6.3

STEEL

6.3.1

General
Whilst steel is a suitable material for use in the construction of maritime
structures, particular where design loads are high, its vulnerability to
corrosion after exposure to seawater should be considered when using
carbon steel in the marine environment.
In the design of steel members, designers shall consider appropriate
protection systems to protect and maintain steel members. In addition,
designers shall also consider methods for installation and connection of
steel members to prevent damage to pre-applied protection systems.
Consideration should be given to the selection of steel members to allow
ease of application and maintenance of protection systems and not
simply based on the most efficient size or shape with regard to strength.
Further advice regarding the selection of steel members is given in
Standard Australias - DR 02536 - Guidelines for Design of Maritime
Structures.

6.3.2

Maintenance Considerations
Paint coatings can generally provide a service life of 10 to 20 years,
before repair or recoating is necessary.
In relation to any repairs or recoating, consideration should be given to
the following:
(a)
(b)
(c)

the ability to access the repair/recoating location including the need


for any scaffolding;
the ability to remove and contain waste materials during
repairs/recoating; and
the ability to prepare and apply protective coatings in-situ to
achieve the required standard.

The preparation and recoating of steel in the marine environment is


difficult and standards reached in the manufacturing process are
generally not achievable in this environment.

6.3.3

Structural Design
Steel maritime structures and elements shall generally comply with the
design and performance requirements of AS4100 together with the
requirements of this Document.

___________________________________________________________________________________
First Edition - March 2005

Materials

29

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

6.3.4

Material Requirements
Minimum sizes of steel members and connections shall generally comply
with Standard Australias - DR 02536 - Guidelines for Design of Maritime
Structures.
Requirements for stainless steel shall generally comply with Standard
Australias - DR 02536 - Guidelines for Design of Maritime Structures.

6.3.5

Protection Systems
Protection systems for steel structures and elements shall generally be
applied or installed in accordance with Standard Australias - DR 02536 Guidelines for Design of Maritime Structures.

6.4

TIMBER

6.4.1

General
Timber has many applications in maritime structures, particularly in small
craft facilities such as jetties, ramps, skids and steps due to its ease of
workability.
Timber can be used on its own to construct complete structures (including
piles, headstocks, bearers, joists and decking) or in conjunction with
other materials to provide economical, and durable structures.
The deterioration of timber is usually by rot or attack by living organisms.
Timber durability is dependant predominantly upon the species chosen in
the design.
Further advice regarding the use of timber is given in Standard Australias
- DR 02536 - Guidelines for Design of Maritime Structures.

6.4.2

Maintenance Considerations
Individual timber members are relatively small, forming an assembly of
members within a structure. Members can usually be replaced easily
within a structure to maintain the structural capacity, without significant
interruption to service operations.
Timber members will generally have a shorter service life than concrete
or steel members. For timber piles affected by marine organisms a
service life of 5 to 10 years would be expected. For timber decking
exposed to weathering a service life of 10 to 15 years would be expected.
Natural shrinkage of drying timber will result in the need to tighten bolted
connections during the early years of the structures life.

___________________________________________________________________________________
First Edition - March 2005

Materials

30

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

In relation to maintenance, consideration should be given to the following:


(a)
(b)
(c)

6.4.3

the availability of skilled carpenters, able to maintain the works over


the structures design life;
the future availability of suitable timber species and member sizes;
and
the detail and accessibility of bolted connections for ease of
replacement during maintenance.

Structural Design
Timber maritime structures and elements shall generally comply with the
design and performance requirements of AS1720.1 together with the
requirements of this Document.

6.4.4

Material Requirements
Requirements for timber shall generally comply with Standard Australias
- DR 02536 - Guidelines for Design of Maritime Structures.
Hardwood timbers shall be either durability class 1 or class 2 in
accordance with AS1720.1.
Suitable species for timber members are shown below:
(a)

Piles:
Turpentine.

(b)

Headstocks, wales, capwales, girders, joists and braces:


Grey ironbark, grey gum, white mahogany, tallowwood, grey box,
yellow stringybark, white stringybark, woollybutt, forest red gum,
mountain grey gum and turpentine.

(c)

Decking:
Brushbox, blackbutt, grey gum, white mahogany, tallowwood, grey
box, yellow stringybark, white stringybark, woollybutt, forest red
gum and mountain grey gum.

(c)

Kerbs:
Blackbutt, grey gum, white mahogany, tallowwood, grey box, yellow
stringybark, white stringybark, woollybutt, forest red gum and
mountain grey gum.

(d)

Handrails:
Tallowwood, white mahogany and grey box.

___________________________________________________________________________________
First Edition - March 2005

Materials

31

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

SECTION 7
7.1

MAINTENANCE

GENERAL
During the design life of a maritime structure maintenance will need to be
carried out in order to ensure that this design life is achieved.
Costs associated with such maintenance can be greatly reduced by
adopting an appropriate preventative maintenance programme.
Essential features of such a programme include the following:
(a)
(b)
(c)
(d)
(e)

regular inspections;
timely repairs;
timely renewal of protection systems;
timely replacement of worn-out components; and
keeping records of inspections carried out and maintenance
performed.

7.2

INSPECTIONS

7.2.1

General
Inspections should be carried out by suitably qualified persons
experienced in the design and construction of maritime structures.
Typical inspections for various structures that should be performed are
given below together with suggested inspection intervals. These
inspections are not an exhaustive list and will vary from structure to
structure. More frequent inspections may be required where structures
are located in extreme environments or subject to severe loads.

7.2.2

Piles
The tidal zone of a pile should be inspected visually from the surface at
low tide annually. Signs of excessive wear or evidence of marine borer
attack or corrosion should be noted and remedial measures taken if
necessary.
Timber pile tops should be inspected for deterioration due to decay or dry
rot annually.
At intervals of 3 years or after major storms or other severe events, a
detailed inspection of piles should be carried out. It is recommended that
experienced divers be used to inspect the condition of piles below water
level. Timber pile circumferences should be measured above and below
low water, pile alignments measured, any corrosion noted and marine
fouling removed.

___________________________________________________________________________________
First Edition - March 2005

Maintenance

32

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

The intervals between inspections above should be reduced for old or


partially damaged piles.

7.2.3

Pontoons
Pontoons and their mooring systems should be visually inspected above
water at 6 monthly intervals. Such inspections should take note of any
damage from boat impacts, mooring line chafing, chemical spillage,
pontoon freeboards and levels, and the condition of pontoon connections.
At intervals of 3 years, a detailed inspection should be carried out. This
inspection should include an underwater investigation of marine fouling
and pontoon connections not normally visible above water.

7.2.4

Timber Structures
Timber components above water should be inspected annually for decay
and infestation.
Major structures should have a detailed inspection at 5 yearly intervals.
Such inspections should note the condition and alignment of the
structure, fastenings and all associated hardware.

7.2.5

Steel Structures
Steel fittings and components should be inspected for wear and corrosion
on an annual basis. Any damage to protective coatings should be noted
for repair. Distortions due to overstress should be noted and remedial
action taken. Attention should be paid to wear and corrosion in pile guide
systems and pontoon connection hardware, where visible.
Major structures should have a detailed inspection at 5 yearly intervals.
Such inspections should consider corrosion, deterioration of protective
coatings together with signs of fatigue and wear.

7.2.6

Concrete Structures
Inspections should be carried out to check for signs of deterioration
usually evidenced by white salt encrustations, cracks, rust stains and
spalling. Such inspections should be carried out at intervals of 5 years.

___________________________________________________________________________________
First Edition - March 2005

Maintenance

33

Engineering Standards & Guidelines


NSW Maritime
For Maritime Structures
_____________________________________________________________________________________________

THIS PAGE LEFT INTENTIONALLY BLANK

___________________________________________________________________________________
First Edition - March 2005