Professional Documents
Culture Documents
1265 - 1010KVA DG Set Specification PDF
1265 - 1010KVA DG Set Specification PDF
FOR
2 X 1010 KVA, 1500 RPM, 415 V DG SETS
INDEX
S. NO.
SECTION
SUB HEAD
PAGE
NO.
SECTION - I
SECTION - II
SCOPE OF WORK
SECTION - III
SECTION - IV
12
SECTION - V
SECTION - VI
SECTION - VII
SECTION - VIII
SECTION - IX
DRAWINGS
34
15
22
25
32
SECTION I
1.0
SITE CONDITIONS
-
:
:
:
:
:
45 0C
9 0C
97%
30%
1000 mtr
IMPORTANT :
ALL MAJOR EQUIPMENTS LIKE ENGINE AND ALTERNATOR SHALL BE DESIGNED FOR
OPERATING TEMPERATURE OF 500C FOR ALL PRACTICAL PURPOSES. BIDDERS TO FURNISH
THE DERATION CALCULATION AT SITE CONDITIONS MENTIONED ABOVE IN VIEW OF THE
SUPPORT FOR THE CAPACITY/SUITABILITY OF THE EQUIPMENTS OFFERED. PLEASE NOTE
THAT OFFERS OF THE BIDDERS NOT SUBMITTING THE AFORESAID CALCULATIONS, SHALL NOT
BE CONSIDERED.
SECTION II
SCOPE OF WORK
GENERAL: Design, manufacturing, testing, supply, erection & commissioning of Emergency Generating
Set for prime power output of 1010 KVA at 1500 RPM, 415V + 5%, 3 Phase ,0.8 pf (lag) &
500 C ambient with complete accessories.
3.0
Note:DG Panel & PLC synchronizing panel is already installed at site and provided with I/C
breakers for these new DGs. DG Panel consists of feeders for 6 nos. of DGs (2 nos.
existing 1010KVA, 2 nos. 437.5 KVA & 2 nos. new 1010KVA). However CTs & meter for
1010KVA feeders are provided with 800/5A rating. These CTs are to be replaced &
modification of control schematic for DG Panel / PLC Panel synchronizing is to be done by
supplier of new DGs.
EXCLUSIONS :
i.
ii.
iii.
SECTION III
TECHNICAL SPECIFICATIONS
DIESEL GENERATOR SETS
1.
GENERAL
Work covered by this contract shall include design, manufacture, supply, transportation, delivery,
installation, testing and commissioning of Diesel Generator Sets and auxiliaries required for prime
power generation.
The generator set shall consist of a diesel engine directly coupled to an electric generator,
together with the necessary control panel, battery, diesel tank etc and accessories to provide
prime electric power for the duration of any failure of the normal AC source.
2.
STANDARDS
The equipment offered shall conform to the latest revision of relevant Indian or British Standard
(BSS) as indicated below and Codes together with the requirements of the Local Supply Authority.
Engine shall conform to BS 5514/IS:10000 and the alternator shall be in accordance with
IS:4722/BS:2613/IEC-34(Part-1).
3.
3.1
Heat Exchanger
Cooling water centrifugal pump
Bypass Thermostat
FUEL SYSTEM :
-
Fuel pump
Fuel injectors
Fuel filter
Fuel hoses
Lube oil pump
Lube oil-priming pump.
Lube oil filter
Bypass filter
3.2
Fuel Consumption
The engine shall be suitable for satisfactory operation on H.S.D. as locally available.
3.3
3.4
Governing
The governor shall be Electronic type confirming to Class A1 and shall be a self contained unit
capable of monitoring speed.
3.5
Frequency Variation :
The engine speed shall be so maintained that frequency variation at constant load including no
load shall remain within band of 1% of rated frequency.
3.6
3.7
3.8
Exhaust Piping
Exhaust System
Each engine shall be provided with residential type silencers so as to limit the sound level from the
DG set.
Exhaust piping shall be fabricated from Class C MS Black Pipe conforming to relevant IS
standard size suitable to limit back pressure to within permissible limit. The exhaust shall be
terminated as per pollution norms. Exhaust piping inside DG room shall be insulated with 75 mm
thick mineral wool and 26 gauge Al. cladding. Exhaust piping shall be connected to the engine by
means of flexible section or an expansion joint.
3.9
Turbocharger
Turbocharger mounted at the side of the engine for better conversion of energy of exhaust gases
resulting in more power, improved fuel economy, altitude compensation, lower exhaust
temperature, lower smoke and noise level
3.10
Air Filter
The engine air intake shall be fitted with dry type air cleaner with vacuum indicator facilitating
change of air filter.
3.11
3.12
3.13
Safety Controls
Low Lubricating Oil Pressure
Pressure sensors shall be fitted such that in the event of a fall in the lub oil pressure and indication
shall be actuated. In addition, the engine shall be automatically shut down in the event of lub oil
pressure dropping to a pre-determined low value.
Over Speed
Speed control shall be so arranged that 12-13% increase over normal rated speed shall cut off fuel
supply, thus stopping the engine.
3.14
General
The DG sets shall be complete with all equipments, indications and controls required for fully
reliable and safe operation of the DG sets whether specifically stated in these specifications or not.
It is essential that the operation of all protection equipments be completely reliable in all respects.
4.0
4.1
Coolant Temperature
Lub Oil Pressure
Battery voltage
Engine speed
Engine Run hours
4.2
Engine and alternator protection : The electronic panel will display the fault
codes on the screen so that the necessary action can be taken. It should
also provide the engine protection features such as :
4.3
5.0 GENERATOR:
Synchronous alternator of suitable capacity to generate 1010 KVA output at alternator terminal at 415
V, 50 Hz, 3 Phase, 4 Wire, 0.8 pf (lag) 1500 RPM and in accordance with BS:2613 / IS:4722/IEC34(Part-I) shall be of totally enclosed or screen protected dip proof and self air-cooled type driven by
the Diesel Engine. Generator shall be supplied along with its excitation system, AVR and include all
necessary auxiliaries.
Excitation System:
The Generator shall be provided with brush less excitation system capable of supplying the excitation
current of the generator under all conditions of output from no load to full load.
Enclosure :
Alternator enclosure shall be Screen Protected Drip Proof (SPDP) conforming to IP-23.
Winding :
BATTERY :
Battery of voltage and capacity compatible with the engine, complete with battery charging equipment shall
be provided to energise electric starting equipment. Batteries shall be of lead-acid automotive type. The
charging unit shall be part of existing DG control panel.
DG Set Accessories
6.1.
DESCRIPTION OF WORK
Scope of works includes supply, installation, testing & commissioning of following items :a) Cooling Tower, Pumps & associated piping.
b) Exhaust Piping.
c) 360 AH Battery with accessories.
d) Any other item not specifically mentioned but required for satisfactory installation,
operation and maintenance of DG Set.
APPLICABLE CODES, STANARDS AND APPLICABLE PUBLICATIONS
6.2
6.2.1
SUBMITTALS
6.2.1.1
6.2.1.2
6.3
SPECIFICATIONS
6.3
6.3.1
6.3.2
6.3.3
6.3.4
6.3.5
6.3.6
6.3.7
Painting
The exterior and all steel (ferrous) surfaces of the tower shall be given two shop coats of
anti-corrosive paint of approved finish.
6.3.8
If these shop coats become marred during shipment or erection, the effected areas shall
be cleaned off with mineral spirits, wire brushed and spot primed, then coated with enamel
paint of matching shades.
6.3.9
6.4
6.4.1
6.4.2
6.4.3
6.4.4
6.4.5
6.4.6
6.5
6.6
Exhaust Piping
The exhaust silencer piping system shall be MS pipes confirming to Class- B. Suitable
length of flexible piping shall be used for connecting the exhaust piping to the engine as
per the recommendations of the manufacturer.
Exhaust pipe along with silencer inside the building shall be provided with mineral wool
insulation with chicken mesh wrapping and 26 SWG aluminium cladding.
All terminal connections and pipes joint shall be of welded construction. The terminals of
sizes 2" and above shall be butt welded, and of sizes 1.5" and below shall be socket
welded, complete with flanges, jointing and fasteners.
This welding shall be done as per relevant ASME/ASA codes. The Contractor will have to
indicate beforehand the welding procedure he proposes to use. After confirmation by the
Engineer-in-Charge the procedure which is finalised shall be strictly adhered to.
Water Piping And Oil Piping
Water Piping shall be Class - B M.S. pipe. Oil piping shall be MS pipe as per A106 Gr. B
Sch. 40 or provided flexible type of SS - 304. If M.S. pipe as per IS : 1239 heavy class is
used, it shall be " TATA " or any other make approved by the Engineer-in-Charge.
Alternatively, the piping shall be braided flexible of SS - 304 only.
SHOCK TREATMENT CHART
Shock treatment chart in English, Hindi and local language explaining the method of shock
treatment shall be provided duly framed in glass.
Testing and commissioning
SUPPORT SERVICES :
Throughout design, implementation, field installation the contractor shall supply consulting
assistance, as required by the buyer for site preparation, field installation and other areas where
technical support may be required.
TECHNICAL SUPPORT :
Consultation with contractors technical support personnel and trained field service personnel shall
be readily available on a short-term/long-term basis to assist the buyer in maintaining, expanding
and enhancing the installed setup.
INSPECTION :
Access to the contractors facilities during system manufacturing and testing and to any facility
where systems/equipments are being produced and tested shall be available to the employer.
DG TESTING :
TESTS AT MANUFACTURER'S WORK
The following tests shall be performed at manufactures works prior to packing and
dispatch to site, in the presence of Project Manager/Consultant. A weeks notice shall be
given. Nothing extra shall be payable. If witness is waived off the contractor shall have to
submit test certificate.
On DG Set
a. Maximum power load capacity.
b. Maximum motor starting capacity
c. Endurance test.
d. Fuel consumption at full load, 50% load, 75% load and 25% load.
On The Alternator
a. High voltage tests on stator and rotor windings.
b. Insulation resistance of stator and rotor windings.
c. Temperature rise test.
d. Stator voltage and current tests.
e. Stator phase sequence check.
On The Exciter
a.
b.
c.
d.
Sensitivity test.
Response time test.
All routine test as per IS/BS codes shall be conducted on alternator, exciter and AVR.
Moreover the engine and alternator supplied shall be duly tested and supported by the test certificates of
the respective manufacturer.
DRAWING & DOCUMENTATION TO BE SUBMITTED WITH BID
-
11
10
11
SECTION IV
GUARANTEED TECHNICAL PARTICULARS
FOR DIESEL ENGINE & ALTERNATOR
VENDOR SHALL FURNISH THE POINTWISE CONFIRMATION/INFORMATION AGAINST EACH POINT
DESCRIPTION
Sl.NO.
A.
Diesel Engine
1.
Rating :
QUOTED DATA
a)
b)
2.
3.
Cylinders :
a)
Number of Cylinders
b)
Cylinder length
c)
Cylinder diameter
4.
Engine rpm
5.
Aspiration
6.
Cooling
7.
Type of Starting
8.
9.
At 3/4th load
c)
At half load
d)
At 1/4the load
At site
condition
10.
11.
12.
variation +
:1958 ).
variation +
12
At NTP
condition
Sl.NO.
DESCRIPTION
13.
Governing characteristics :
14.
15.
16.
QUOTED DATA
17.
Type of Governor
18.
19.
Weight (kg)
B.
Alternator
1.
2.
3.
4.
Generated Voltage
5.
Number of phases
6.
Standard
7.
8.
AC Power factor
9.
10.
Make of Alternator
11.
Model No.
12.
Efficiency
a)
At full load
variation +
b)
At 3/4th load
variation +
c)
At half load
variation +
d)
At 1/4th load
variation +
13
Sl.NO.
DESCRIPTION
13. Type of Excitation
a)
Rated voltage
b)
Rated current
c)
Response ratio
QUOTED DATA
14.
15.
Stator
b)
Rotor
c)
Cores
16.
AVR - Type
17.
Degree of protection
18.
19.
variation +
a)
x d
variation +
b)
x d
variation +
20.
21.
22.
Weight (kg)
14
SECTION V
TECHNICAL SPECIFICATIONS
FOR
DG AUXILIARY PANEL
15
1.
DESCRIPTION OF WORK
This section covers the detailed requirements for design, manufacture, inspection,
transportation to site, installation testing & commissioning of L.T. Panel suitable for 415
Volts, 3 phase, 50 HZ 4 wire system, in line with schematic diagram, schedule of quantities
and as specified.
2.
3.
3.1
3.1.1
3.1.2
3.1.3
3.2
IS : 1248
Electrical measuring
accessories.
instruments
and
IS : 8623
IS : 3072
IEC : 61643-12
IEC : 60947-7-1
Terminal Blocks
switchgear
their
and
SPECIFICATIONS
GENERAL
The L.T. panel shall comprise the following type of switchgear as specified. The panel
shall be capable of fault withstand capacity of 50 KA for duration of one second.
The panel shall be metal enclosed, indoor type having sectionalisation of incoming, and
outgoing switchgears as specified. The design shall be cubicle type as specified.
The panel shall be floor mounted free standing totally enclosed and extensible type. The
panel shall be with lockable arrangement with degree of protection IP - 54 and shall be
suitable for the climate conditions as specified. The design shall include all provisions for
safety of operating and maintenance personnel.
CONSTRUCTION
3.2.1
The panel shall be shall be fabricated out of CRCA sheet steel 2.0 mm thick. Wherever
necessary, such sheet steel member shall be stiffened by angle iron frame work. General
construction shall employ the principle of compartmentalization and segregation for each
circuit. Unless otherwise approved, incomer and bus section panels or sections shall be
separate and independent and shall not be mixed with sections required for feeders. Each
section of the rear accessible type board shall have hinged access doors at the rear. Overall
height of the board shall not exceed 2.40 meters. Operating levers, handle etc. of highest unit
shall not be at a height more than 1.8 m, and that of the lowest unit shall not be less than 300
mm above finished floor level. Multi-tier mounting of feeders is permissible. The general
arrangement for multi-tier construction shall be such that the horizontal tiers formed present a
pleasing and asthetic look. The general arrangement shall be got approved before fabrication.
Cable entries for various feeders shall be either rear or from the front through cable alleys
located in between two sections of minimum 300 mm width. There shall be separate gland
plate for each cable entry so that there will not be dislocation of already wired circuit when new
feeders are added. Cable entry plates shall therefore be sectionalized. The construction shall
include necessary cable supports for clamping the cable in the cable alley or in rear cable
chamber. All cable entries shall be from the top/bottom as specified. Gland plate shall be
minimum 3 mm thick.
16
3.2.2
3.2.3
Instruments
All meters shall be Digital type flush mounted type conforming to class 1.0 for accuracy
and of size of 144 mm2 for incoming feeders and & 96 mm2 for outgoing feeders.
3.2.4
Indicator Lamps
ON/OFF and phase indicator lamps shall be provided suitable for operation on AC 230
Volts supply. Necessary filter G/Y/R/A shall be provided depending upon the function. All
lamps shall be protected by proper HRC fuses. All lamps shall be LED type.
3.2.5
Wiring
All wiring controls, indication etc. shall be with minimum 2.5 sq. mm suitable stranded
copper conductor cables PVC insulated. Wiring shall be suitably protected within the
switchboard. Runs of wires shall be neatly bunched and suitably supported and clamped.
Means shall be provided for easy identification of the wires. Identification ferrules shall be
used at both ends of the wires. All control wiring meant for external connection are to be
brought out on terminal board. Brass/Copper thinbles, insulation tape etc. shall be
provided at joints & terminations as required.
3.2.6
i.
Terminal Blocks
All control terminal blocks shall be unbreakable and IP 20 compliant. The metal parts of
the terminal block including the captive screw shall be of Cu. Alloy and its housing shall be
Polyamide class V0/V2 as per UL94. It shall be suitable for mounting on both C&G type
rail and shall be capable to withstand vibration level upto 5g.
High current carrying terminal blocks suitable for 25-240 sq. mm wire shall contain
individual terminal sleeve cover on each termination which is also individually separatable,
to avoid accidental touch. It housing material shall be Polyamide as per UL 94 and shall
be separated from each other by separating/partition plate.
ii.
3.3
The bus bar temperature should not exceed 90o C i.e. 40oC temperature rise over
50oC ambient. The calculation for temperature rise and bus bar sizing should be
furnished along with shop drawing for approval.
c.
Wherever copper bus bar and Aluminium bus bar are connected to each other,
bimetallic strip shall be used.
17
ii.
iii.
iv.
Clearances
The minimum clearances to be maintained for open and closed indoor air insulated
bus bars/electrically non-exposed and working at system voltages upto 600 volts
shall be as follows :
-------------------------------------------------------------------------------------------Between .................................................Minimum Clearances
v.
Single Phase
Red
4.
Neutral Connection
Black
5.
Connection to
earth
Green
6.
Phase variable
(Such as connections
to reversible motors)
Grey
Gy.
18
vi
vii.
b.
ii
When the run of the conductors is horizontal, the red shall be on the top or
farthest away from the centre line as viewed from the front.
iii
When the run of the conductor is vertical, the red shall be on the extreme
left.
iv
When the system has a neutral connection in the same plane as the phase
connections, the neutral shall occupy an outer position.
Unless the neutral connections can be readily distinguished from the phase
connections, the order shall be red, yellow, blue and black.
Terminations
Incoming terminals shall be suitable for receiving cables.
3.4.1
PROTECTIVE DEVICES
Suitable Surge Protection Devices shall be provided at the input of Panel, conforming to
IEC-61643-12 (Stage-I/Class B). The device shall be mountable on standard DIN Rail. It
shall have the capability to arrest external lighting surges (of 10/350 waveform) up to 50
KA between Line to Neutral & 100 KA between neutral to earth. The wiring shall be as per
TT configuration of wiring.
Protective devices shall be provided as specified in the schedule of quantities.
There shall be not less than 4 N/O and 4 N/C auxiliary contacts rated 5 amp on each
breaker. The auxiliary contacts blocks shall be so located as to be accessible from the
front. The auxiliary contacts in the trip circuits shall close before the main contacts have
closed. All other contacts shall close simultaneously with the main contacts. The auxiliary
contacts in the trip circuits shall open after the main contacts open.All current carrying
parts shall be silver plated and suitable arcing contacts with proper arc chutes shall be
provided to protect the main contacts. The heat generated in the contacts due to tripping
under fault conditions shall be very nominal.
19
3.4.2
3.4.2.1
Moulded case circuit breakers shall comply with the latest Indian Standards and IEC
standards. They shall have the voltage and current ratings, rated duty, rated short circuit
service breaking capacity and rated short-time withstand current as indicated.
3.4.2.2 MCCB's shall be of the independent manual closing air-break type, rated for an
uninterrupted duty, unless otherwise indicated.
3.4.2.3 Each MCCB shall have a facility for padlocking in the "OFF" position.
3.4.2.4 MCCB shall have front operating Extended door operating handle.
3.5
CURRENT TRANSFORMERS
Current Transformers shall be cast resin type.
a) All phases shall be provided with current transformers of accuracy Class I and suitable
VA burden to operate associated metering.
b) Separate C.T's shall be used for protective devices.
3.6
VOLTAGE TRANSFORMER :
Voltage transformers shall be cast resin type with accuracy class of 1.0.
3.7
RELAYS :
The contractor shall furnish, install and co-ordinate all relays to meet the requirement of
protection, interlock and bus transfer scheme as indicated in BOQ, Drawing, Specification
and system requirement. Relays shall be Microprocessor type.
3.8
EARTHING
All components, frame etc. shall be properly earthed. Al. earth bars of 50 mm x 6 mm
shall be provided for the LT panel for the full length of the panel and connected to the
frame work. Provisions shall be made for connection from this earth bar to the main
earthing bar on both sides of LT Panel.
3.9
PAINTING
All steel work used in the construction of the LT panels shall have undergone a rigorous
metal treatment process as follows :i)
ii)
Pickling in dilute sulphuric acid to remove oxide scales & rust formation, if
any, followed by cold water rinsing to remove traces of acidic solution.
iii)
iv)
v)
20
vi)
vii)
3.10
LABELS
Anodised Aluminium labels shall be provided on all incoming and outgoing feeder
switches. Circuit diagram showing the arrangement of the circuit inside the LT panel shall
be pasted on inside of the panel door and covered with transparent laminated plastic
sheet. Caution notice place shall be affixed at the back of each vertical panel.
3.11
4.
4.1
4.2
Test witness
Tests shall be performed in the presence of the Engineer-in-Charge. The contractor shall
give at least fifteen days advance notice of the date when the tests are proposed to be
carried out.
5.
SUBMITTALS
Following data, drawing & manual shall be submitted :-
5.1
5.2
b)
21
SECTION - VI
GUARANTEED TECHNICAL PARTICULARS FOR DG AUXILIARY PANEL
(Separate GTP to be submitted for each size & type of panel).
Sl. No.
Description
Quoted Data
1.0
Assembly
1.1
Make
1.2
Type
1.3
Reference standard
1.4
Voltage (Nom./Max), Volt
1.5
Phase, frequency
1.6
Short circuit rating for 1 sec (KA)
1.7
Insulation level (KV)
1.8
Enclosure
a) Degree of protection
b) Minimum thickness of sheet metal (mm)
2.0
2.1
2.2
2.3
2.4
2.5
2.6
3.0
3.1
3.2
3.3
3.4
3.5
3.6
4.0
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
Construction
Completely compartmentalized
Working height limits from floor level (mm)
Minimum clear space required at front for
breaker (mm)
Minimum clear space required at rear (mm)
Overall dimensions (LxBxH) mm
Approximate weight (Kg)
Busbar
Make
Material & grade
Reference standard
Cross sectional area
a) Main busbar
b) Vertical busbar
Continuous current (at site condition, 50oC)
a) Main busbar (A)
b) Vertical busbar (A)
Short time current for 1sec (KA)
Circuit Breaker
Make
Type
Reference standard
Rate voltage, KV
No of poles
Rated current
Short time current for 1 second (KA)
Total closing time
No of breaks per pole
Spring charging motor
a) Rating (W)
b) Voltage (V)
22
4.11
Closing coil
Sl. No.
4.13
Description
a) Voltage
b) Closing current (A)
Tripping coil
a) Voltage
b) Trip current (A)
Overall dimension (LxBxH)
5.0
5.1
5.2
5.3
MCCB
Make
Type
Reference standard
6.0
6.1
6.2
6.3
Fuse
Make
Type
Reference standard
7.0
7.1
7.2
7.3
7.4
7.5
Condactor
Make
Type
Reference standard
Duty class
Utilization category
8.0
8.1
4.12
8.2
9.0
9.1
9.2
9.3
9.4
9.5
9.6
Quoted Data
Current transformer
Make
Type
Reference standard
Ratio
VA rating
Class
a) Relaying CT
b) Metering CT
23
10.0
10.1
10.2
10.3
Control transformer
Make
Ratio
VA rating
11.0
11.1
11.2
11.3
11.4
11.5
11.6
12.0
12.1
12.2
13.0
13.1
13.2
13.3
13.4
Voltage transformer
Make
Type
Reference standard
Voltage ratio
Accuracy class
VA burden
Relays
Make
All relays furnished as per BOQ, specification
& drawing?
Meter
Make
Type
Reference standard
Size
14.0
14.1
14.2
14.3
Secondary wiring
Voltage grade
Conductor size & material
Type of insulation
15.0
15.1
15.2
15.3
Terminal block
Make
Type
Voltage grade
16.0
16.1
16.2
Space heater
Wattage
Voltage
24
SECTION VII
TECHNICAL SPECIFICATIONS
FOR
L.T. BUS DUCT
25
SCOPE
This section covers Design, manufacture, inspection, transportation to site, installation,
testing and commissioning of Low tension bus duct for connection between DG sets and
DG panel.
2.
GENERAL
The layout of the bus ducts shall be in line with the drawings/site conditions and shall be
got approved by Engineer-in-charge
All parts and accessories shall have appropriate match mark and part numbers for easy
identification and installation at site.
3.
STANDARDS
The bus duct works shall conform to up-to date amendments and relevant standards/code
as applicable:
4.
DESIGN
Bus duct shall be Non-segregated phase suitable for 415 volts, 3 Phase& Neutral, 50 Hz,
AC supply and indoor, outdoor installation as per the requirement.
Bus duct shall be designed to withstand the fault level of 50KA for 01 second.
Bus duct shall be designed for continuous current rating as per the current rating given in
the BOQ/SOQ.
5.
CONSTRUCTION
5.1
ENCLOSURE
All the three phases shall be enclosed in a weather proof, dust tight enclosure, Outdoor
section of the bus duct shall be completely rain proof. Weather resistant type
circumferential gaskets shall be provided for making the joints with adjacent enclosures
dust proof and impervious to moisture suitable inspection opening with gaskets shall be
provided for access to support insulator, lugs joints etc.
Bus duct enclosure shall be made of 14 swg. (2mm) CRCA sheet steel, for bus rating
below 3000A.
The degree of enclosure protection shall be IP 52 for indoor application and IPW-55 with
canopy for outdoor section of the bus duct.
All ventilation openings shall be screened and drains shall be filtered to prevent entrance
of dust and vermin.
The portion of bus duct at DG end may be subject to vibration. Suitable means shall be
provided to isolate the transformer vibration from rest of the bus duct.
For continuous operation at specified ratings, temperature rise of the bus duct and
auxiliary equipment shall be limited to the site permissible values stipulated in relevant
standards and/or this specification.
26
Bus duct and auxiliary equipment shall be capable of withstanding the mechanical forces
and thermal stresses of the short-circuit currents without any damage of deterioration of
material.
The L.T. bus ducts shall be self cooled and shall not be equipped with blower or any other
type of forced ventilation.
6.
DETAILED SPECIFICATIONS
6.1
BUSBARS
6.1.1
Material
Bus bars shall be made up of high conductivity electrolytic quality aluminum as specified
in BOQ with maximum temperature limited to 85 deg. C (i.e. 35 deg. C rise over 50 deg. C
ambient).
6.1.2
Current density
The Aluminum bus bars shall be of sufficient cross section. The design current density of
1Amp/Sq. mm for aluminum bus bars shall be maintained. However, the design shall be
suitable for the 50 KA fault level.
6.1.3
6.1.4
Joints
Adequate contact pressure shall be ensured by means of two bolt connection with plain &
spring washers and locknuts.
All bus joints shall be silver plated.
Bimetallic connectors shall be provided for connections between dissimilar metals.
The bus conductor shall be designed for bolted connections throughout the run. Joints for
the bus bar shall be bolted but joints of construction with double cover fish plates and with
adequate contact area.
6.1.5
6.1.6
Color coding
Bus bars shall be colour coded for easy identification (Red, Yellow, Blue for three phases
and Black colour for neutral for A.C 3 phase system). Heat shrinkable, colour coded PVC
insulation sleeve shall be used for this purpose.
27
6.1.7
6.1.8
6.2
Phase to Phase 35 mm
Phase to Neutral 28 mm
Phase to Earth 28 mm
HARD WARE
Zinc passivated or any other superior quality standard size hard ware to be used for all
joints/connectioins/terminations at switchgear & control gear, bus bars, ground bus , interconnections/ wiring etc.
6.3
Convenience of maintenance
The system shall be maintenance friendly. i.e. it should be possible to easily
connect/tighten/disconnect etc.
6.4
Inspection Covers
Inspection covers shall be provided at suitable intervals as required.
6.5
Disconnect Link
Removable bolted disconnect link shall be provided in the bus for the purpose of isolation.
Disconnect link shall consist of a removable section of conductor and shall be so
constructed as to permit easy removal or reinsertion without alignment difficulties.
The bus on both sides of the link shall be rigidly supported so that the disconnect link is
equal in mechanical strength to any other section of the bus.
A minimum clearance of 300 mm (12) shall be provided between the disconnected bus
sections with the link removed.
6.6
Ventilation
The bus duct shall be natural cooled.
6.7
28
Flexible joints shall be provided in enclosures at all points where the bus duct terminates
at equipment to withstand vibration, expansion/contraction and at suitable intervals in any
straight run of the bus duct where expansion and contraction would otherwise result in
stresses in the supporting structures.
Flexible connections shall be provided between bus sections to allow for expansion and
contraction of the conductor. Flexible connection shall also be provided at all equipment
terminations.
All contact surfaces shall be silver plated to ensure an efficient and trouble free
connection.
6.8
Other points
Shipping length of the bus duct shall be not more than three (3) meters in length.
Filtered drains for drainage of condensate shall be provided at the lowest points and at
such locations where accumulation of condensate can be expected.
6.9
GROUND BUS
Two numbers of Earth bars shall run along the full length of bus duct made up of size 50
mm X 5 mm Aluminium, strip. This ground bus shall be fixed to the bus duct on the
external side. It shall have provision to connect main earth/loop earth conductors with
bolts, nuts, washers & spring washers. Metallic parts of the bus duct & associated
structures etc. shall be bonded to the ground bus for effective earthing.
One end of the earth bus shall be joined to the LT Panel side body earth lead and the
other end shall be joined to the transformer body earth.
7.
INSTALLATION
All supporting structures required for hanging and/or supporting the complete bus duct
shall be provided including related civil works. These include all types of supports,
brackets, beams, channels, rods, clamps, hardware, etc to support with wall, roof, truss
etc.
Bus ducts running along the wall should be supported at intervals not exceeding 1.5m. In
case of branching, there should be a support on all branches at a distance of 30 cms from
the point of branching. Support should not be less than 40mm X 40mm X6mm MS angle
secured in an approved manner. Supports may also be formed as brackets fixed to walls
where runs are along with walls. Supports shall be grouted on the walls.
In case of ceiling suspended bus ducts, supports made of 40mm X 40mm X6mm MS
angle iron shall be provided. The horizontal interval between two such supports should not
be more than 1200mm. However, additional supports to be given at the bends and
termination points. These duct supports shall be suspended from the C.I/MS. boxes or
suitable approved suspension device provided in the ceiling by means of 12 mm diameter
MS rods.
Where fish plates are available, the same can be used for busduct support works. Where
there is no such provision, good quality anchor fasteners of size not less than 8mm shall
be used in the ceiling.
29
Seal-off bushings complete with wall frame and support plates shall be provided where
the bus duct penetrates the building wall. The seal is to prevent free exchange of air
between two portions of the bus duct part of which is indoor while the other is outdoor.
Silica-gel breather shall be provided on both portions of the bus duct between the seal of
bushings.
The equipment terminal connections shall be readily accessible and shall provide
sufficient air gap for safe isolation of equipment during testing.
If the material of bus conductor and that of the equipment terminal connectors are
different then suitable bi-metallic connectors shall be furnished.
8.
PAINTING
Unless otherwise specified, the painting process shall be as follows:All steel surfaces shall be thoroughly cleaned by sand blasting or chemical agents, as
required, to produce a smooth surface free of scales, grease and rust etc.
The steel surfaces after cleaning shall be given on all sides proper coat of anti-corrosive
primer followed by two coats of powder coating painting.
The bus duct shall be finished with two coats of grey (IS 5 shade # 632) powder coated
paint.
Earth strip shall be painted with green colour enamel paint.
Where the painting is damaged during transit, installation etc., and touch up painting shall
be done at site.
All metallic parts involved in the installation like supports, beams, channels, brackets,
clamps, poles, hardware etc. shall be enamel painted.
9.
TESTS
9.1
Factory Test
The routine/acceptance tests shall be witnessed at the manufacturers works by CDRI
representative. Test shall be carried out as per IS.
30
9.2
TYPE TESTS
Bus duct shall be got manufactured by only reputed bus duct manufacturers having type
tested as per IS by CPRI or other govt. testing laboratory on similar bus duct (s) with
minimum 50KA short circuit current with stand capacity and the type test certificate shall
be produced to the CDRI inspector at the time of factory test.
9.3
SITE TESTS
In addition to the tests at manufacturers premises, all relevant pre-commissioning checks
and tests shall be done at site before energizing the bus duct.
The following tests are to be particularly done before cable jointing or connecting the bus
duct.
1. Physical inspection for breakages/damages/orderliness.
2. Insulation resistance test with 500 V Megger. The insulation resistance shall not be
less than 100 mega ohms.
3. Earth continuity test.
All test results are to be recorded and reports should be submitted to the department.
10.
COMMISSIONING
After the satisfactory installation & testing, the Bus duct shall be commissioned.
11.
11.1
11.1.1
11.1.2
11.2
11.2.1
Dimensional general arrangement drawings with cross sections of bus duct layout
including supporting arrangement.
11.2.2
Calculation for short circuit forces justifying the proposed arrangement and temperature
rise for bus and enclosure.
11.2.3
11.2.4
Typical details of bus insulator assembly, rigid and flexible connections, grounding
provision, termination arrangement at equipment end etc.
11.2.5
31
SECTION VII
The following is the list of products and indicative makes. Bidder is free to propose any other equivalent
Make meeting Technical Requirements, Specifications alongwith required details in support of the same.
The same would be analyzed and accepted if found suitable after discussion between EPI and bidder. The
Makes shall be finalized during Technical evaluation prior to opening of Price-Bids.
Bidders are required to offer reputed equipment / component which is strictly meeting technical
requirements, enclosed specifications alongwith NIT and other relevant / latest applicable Standards &
Rules.
S.
No
Items
Indicative Makes
1.
Diesel Engine
Cummins/Caterpillar/MTU
/Mitsubishi/Perkins
2.
Alternator
Stamford/Cummins
3.
AVM Pads
Dunlop/GERB/ Resistoflex
4.
Jindal/Tata
5.
Valves
Sant/Rama/Audco/Kirloskar
6.
Batteries
NICCO/Standard Furukawa/Exide
7.
Acoustic Enclosure
8.
Cooling Tower
9.
10.
11
Control wires
12
14.
15.
16.
FUSE DISCONNECTOR
SWITCH FUSE UNITS
17.
HRC FUSES
18.
BUS DUCT
SWITCH
32
19.
AMMETER, VOLTMETER
20.
21
22.
CTS
23.
STARTERS
24.
25.
RELAYS
26.
27.
CONTACTORS
28.
29.
PUSH BUTTONS
30.
TIMERS
31.
TIME SWITCH
32.
DIGITAL METERS
33.
INTELLIGENT
DIGITAL METER
34.
PLC
ROCKWELL
SIEMENS
35.
36.
UPS BATTERIES
MULTIFUNCTION
33
AUTOMATION
L&T
SECTION - IX
DRAWINGS
SR. NO.
01
DESCRIPTION
34