Professional Documents
Culture Documents
Nepal Energy Emergency 2072
Nepal Energy Emergency 2072
pmhf{ dGqfno
(1)
()
,
.
()
,
()
, , , , ,
()
()
()
()
()
()
(2)
(3)
(4)
, , , -
1
(5)
, ,
(6)
(7)
,
(Load Shedding) ,
(Load Shedding)
(8)
(9)
( )
( )
Impact Study
(10)
, ,
...
/ -
,
,
, ,
Captive Generation
,
. . . .
/ . -
.. , /// .. -
. .
,
. . /
( )
(11)
/
:
(12)
, ,
,
,
,
(13)
(open access) ,
(14)
(15)
(IEE EIA)
: ,
,
,
, ,
, , , , /
(16)
(Over loaded)
/ ,
,
,
,
,
(17)
(18)
(19)
/ /
:
(20)
:
:
, ,
(Take or Pay)
/
-
/ ,
Net
Metering
. ,/-
Posted Rate)
:
() ( ) . .
() . .
. . - - .
.
-
() . . ..
()
) . . . ..
/ . . x
) . .
:
- ( )
--
- - ..
..
- --
(HTLS)
- (HTLS)
() . . ..
/ ..
- / . .
- . . ( )
. . . . /
, , /
Time-of-the Day (TOD)
(Technical Audit)
Right of Way
Right of Way
. .
./
(-, , -, )
, ,
.. ,
Grid Impact Study ( Take and Pay)
. .
/ (
Commercial Operation)
RoR
(Take or Pay)
10
/ (
Force
Majeure) :
(Force Majeure)
/
( RCOD)
( RCOD)
/ :
/
()
( Basis and Mode of Payment), Hedging Fund
...
(Posted Rate)
.. /
RCOD ( COD)
11
/ (Discharge)
/ ( ToR/Scoping &
TOR)
(IEE/EIA)
. . / ,
Captive Plant
,
Single Stage Two Envelop
12
(21)
, , ,
:
Finance (EPCF) ,
( Generation Mix)
- % , - % ,
- % - %
, , ( High head),
/ (
, , ,
, , )
( Wheeling Charge)
13
%
% , ,
Power Evacuation
Build Transfer Model
Payment for Ecosystem Services (PES)
( EIA / IEE) Community Support Program
.
.
14
, . . .
(Unscheduled Interchange, UI)
- (Geo-thermal)
( , , , )
( ,
, ),
15
/
. . -
. . /
/
/ - , - , - , ,
- - ,
. .
, ,
Standard Checklist
Accredited
Standard Checklist
Post Audit
%
%
%
,
Suppressed Demand)
,
(Load Forecast)
, , , , , , ,
. .
17
, , , ,
, '
'
, , ,
- (Focal
Person)
-
, ,
// Techno
economic clearance
: (Electrical Boundary)
18
,
:
. .
, -,
,
..
19
Reserve Margin
/ ,
, /
/
/
/ ,
/
20
,
:
21
( )
, ( )
, ( )
( )
, ( )
( )
()
22
( )
23
( )
()
.
24
( )
.
.
( )
.
.
25
( )
, , ,
( )
26
S.
N.
Revised
Status of Projects
Project Name
ThankotChapagaun (Bhaktapur)132
kV T/L
SingatiLamosangu 132
kV T/L, Singati
132/33 kV S/S
Length
Completion
km
Date
N/A
28
40
2015/16
27
Project
Cost
(MUSD)
Problems /
Issues
Projects to be
Evacuated
23
Tungun -Thosne
Khola, Khani Khola,
Bagmati Nadi, Tallo
Bagmati ( Upgrading
project of
Transmission Line
Network)
Poor
performance of
Contractor
Line
S.
N.
Revised
Status of Projects
Project Name
HetaudaKulekhani-IISyuchatar 132 kV
second circuit
stringing
BhulbhuleMarsyangdi 132
kV T/L
Length
Completion
km
Date
46
22
2015/16
Project
Cost
(MUSD)
Problems /
Issues
2.5
Line should be
completed
timely to
evacuate power
from Upper
Marsyangi-A
HEP.
SINOHYDRO has
been providing
technical
support in
construction of
line.
Projects to be
Evacuated
28
Line
S.
N.
Revised
Status of Projects
Project Name
Ramechhap(Garjyang)-Khimti
132 kV T/L
Length
Completion
km
Date
30
Project
Cost
(MUSD)
Problems /
Issues
Projects to be
Evacuated
To approach the
department of
Animal service
for acquiring S/S
land in Garjyang
(Ramechhap).
Khimti-Dhalkebar
220 kV D/C T/L
75
2014/15
HetaudaBharatpur 220 kV
75
2015/16
28
RoW
compensation
dispute in 7 nos.
of towers in
Sindhuli district
and work is
interrupted.
24.25
Progress of
project is
affected by Cash
Line
S.
N.
Revised
Status of Projects
Project Name
Length
Completion
km
Date
Project
Cost
(MUSD)
Problems /
Issues
Projects to be
Evacuated
D/C T/L
Flow problem of
contractor.
India
BharatpurBardaghat 220 kV
T/L
Out of 246 towers, Tower foundation34 Tower erection-20, tree cutting6600 (out of 28000 trees lying in the
RoW)
17
Delay in forest
clearance of
additional tree
cutting.
Strengthening of
domestic network to
import power from
India
38
Delay in
approval of land
use & tree
cutting of RoW
in Pachathar &
Tehrathum
district from
Cabine. Also
local problem in
Phidim
Kabeli Corridor
132 kV T/L,
132/33 kV S/S at
Damak, Ilam,
Phidim & Kabeli
HetaudaDhalkebar10
Inaruwa 400 kV
T/L
74
90
285
2016/17
2016/17
52.42
Strengthening of
domestic network to
import power from
India
Line
S.
N.
Revised
Status of Projects
Project Name
Length
Completion
km
Date
Project
Cost
(MUSD)
Problems /
Issues
Projects to be
Evacuated
Energy Access
and Efficiency
Improvement
(i) Project
Middle
MarsyangdiLower
11
Marsyangdi 132
kV T/L second
circuit stringing
38
12.72
Local problem in
second circuit
Upgrading TL
stringing.
New Marsyangdi
132 kV S/S &
Associated line
bay extension
4.7
Chapali 132 kV
S/S, Lainchaur12
Chabel 66 kV UG
Cable Link
8.46
(16)
Supply of GIS at
Lainchaur
18.62
Poor
performance of
13
Dumre-Damauli
132 kV T/L
7.7
2015/16
2016/17
31
Upgrading TL
Kathmandu Valley TL
reinforcement
projects
Line
S.
N.
Revised
Status of Projects
Project Name
Length
Completion
km
Date
Project
Cost
(MUSD)
Problems /
Issues
Projects to be
Evacuated
2nd circuit
stringing on
same existing
tower from
Middle
MarsyangdiDumre-Lower
Marsyangdi
40
D/C Transmission
line from Dumre
tapping to
Damauli
21
Butwal-Kohalpur
132 kV T/L
14
second circuit
stringing
211
Electricity
Transmission
(ii) Expansion and
Improvement
Project
32
contractor,
Insufficient
monitoring by
NEA, 33 kV line
shutdown, Poor
performance of
Contractor &
RoW problem.
Upgrading TL
Upgrading TL
13.78
Upgrading TL
Line
S.
N.
Revised
Status of Projects
Project Name
KohalpurMahendranagar
15 132 kV T/L
second circuit
stringing
Length
Completion
km
Date
132 kV Chapali
16 S/S Expansion
Project
TamakoshiKathmandu
220/400 kV T/L,
220/132 kV S/S
17
at Barbise
(Sindhupalchowk
) & Mulpani
(Kathmandu)
2017/18
Problems /
Issues
Projects to be
Evacuated
190
Project
Cost
(MUSD)
SASEC Power
(iii System
) Expansion
Project
33
Sub-station
expansion
26.7
Sub-station
expansion
8.93
Land acquisition
and
compensation
problem in New
Khimiti S/S. Poor
project
preparedness.
Upper Tamakoshi,
Lapche Khola, upper
Lapche Khola,
Line
S.
N.
Revised
Status of Projects
Project Name
MarsyangdiKathmandu 220
kV D/C T/L,
220/132 kV, 320
MVA S/S at
18 Marsyangdi
(Markhichowk)
and 220/132 kV,
160 MVA S/S at
Kathmandu
(Matatirtha)
Length
Completion
km
Date
Project
Cost
(MUSD)
Problems /
Issues
Projects to be
Evacuated
To evacuate power
from Marsyandi
Basin
105
Kaligandaki
19 Corridor 220 kV
T/L
Dana-Kusma 220
kV T/L
37.9
34
Tanchhahara,
Tangchhahar SHP,
Ghar khola, Rupse
Khola, Ghalemdi
Khola, Rele Khola,
Thapa khola, Mristi
khola, Nilgiri Khola,
Nilgiri Khola -Ii
cascade, Middile
Line
S.
N.
Revised
Status of Projects
Project Name
Length
Completion
km
Date
Project
Cost
(MUSD)
Problems /
Issues
Projects to be
Evacuated
Kusma-New
Butwal 220 kV
T/L
35
45.9
Tanchhahara,
Tangchhahar SHP,
Ghar khola, Rupse
Khola, Ghalemdi
Khola, Rele Khola,
Thapa khola, Mristi
khola, Nilgiri Khola,
Nilgiri Khola -Ii
cascade, Middile
Kaligandaki, Kali
Gandaki Kowan
48.6
Line
S.
N.
Revised
Status of Projects
Project Name
Marsyangdi
Corridor 220 kV
20
D/C T/L & S/S
(Funded by EIB)
Length
Completion
km
Date
Project
Cost
(MUSD)
Problems /
Issues
Projects to be
Evacuated
115
93
Dharapani-Khudi
HUB (32 Km)Udipur (20 Km)
39
UdipurMarkichowk (33
Km)-Bharatpur
(30 Km)
39.9
Dharapani S/S:
220/132/33/11
kV, 200 MVA
36
Daraudi Khola A,
Upper Daraudi-1,
Istul Khola, Upper
Chepe, Daraudi A,
Super Chepe. Upper
Budhi Gandaki, Budhi
Gandaki kha, Budhi
Gandaki Ka.
Daraudi Khola A,
Upper Daraudi-1,
Istul Khola, Upper
Chepe, Daraudi A,
Super Chepe. Upper
Budhi Gandaki, Budhi
Gandaki kha, Budhi
Gandaki Ka.
Line
S.
N.
Revised
Status of Projects
Project Name
Length
Completion
km
Date
Project
Cost
(MUSD)
Projects to be
Evacuated
Khudi S/S:
220/132/33/11
kV, 200 MVA
Midim Khola B,
Upper Synange
Khola, Nyadi Khola,
Chhahare Khola,
Super Dordi, Upper
Khudi, Myardi Khola,
Lower Nyadi khola,
Upper Marsyandi 1 &
2
Udipur S/S:
220/132/33/11
kV, 200 MVA
Bharatpur S/S:
220/132 kV
Samundratar21 Trishuli 3B HUB
132 kV D/C T/L
Problems /
Issues
26
42
12
37
Line
S.
N.
Status of Projects
Project Name
24
Revised
Koshi Corridor
220 kV D/C T/L
InaruwaBasantapurKhandabari 220
kV T/L
BasantapurHangpang 220 kV
T/L
Length
Completion
km
Date
90
Problems /
Issues
Projects to be
Evacuated
147
107
Project
Cost
(MUSD)
29
To evacuate power
from super six
projects; Lower Solu,
Solu khola, Hongu
Khola
112
Arun-3G4, Apsuwa
Khola, Sankhuwa
khola 1, Pikhuwa
khola, Saba Khola,
Saba Khola A, Uypper
Chirkuwa Khola,
Taksar Pikuwa, Sabha
Kola-B, Inkhuwa
Khola-B, Lower
Inkhuwa Khola,
Lankhuwa Khola.
Maiwa Khola, Siwa
Khola, Tamor Khola,
Mewa Khola, Middle
Tamor,
40
38
Line
S.
N.
25
Revised
Status of Projects
Project Name
Length
Completion
km
Date
Project
Cost
(MUSD)
Problems /
Issues
Projects to be
Evacuated
220/132/33 kV
S/S at
Basantapur,
Baneshwar,
Khandabari &
Hangbang
Arun-3G4, Apsuwa
Khola, Sankhuwa
khola 1, Pikhuwa
khola, Saba Khola,
Saba Khola A, Uypper
Chirkuwa Khola,
Taksar Pikuwa, Sabha
Kola-B, Inkhuwa
Khola-B, Lower
Inkhuwa Khola,
Lankhuwa Khola.
Maiwa Khola, Siwa
Khola, Tamor Khola,
Mewa Khola, Middle
Tamor,
Modi-Lekhanath
132 kV T/L
45
39
20.39
Line
S.
N.
Revised
Status of Projects
Project Name
Length
Completion
km
Date
Project
Cost
(MUSD)
Problems /
Issues
Projects to be
Evacuated
Chilime-Trishuli
220 kV T/L
Trishuli 3B
27 220/132/33 kV,
2x100 MVA S/S
27
40
35
Rasuwagadi, Rasuwa
Bhotekoshi, Upper
Trishuli-2 HPP
22.9