You are on page 1of 3

PROCESS

STEPS

KPIVs
Update :12 May 2016
High power (Sodium,
Operation long time (24/7)
Lacking nature light

Type
C
C
C/S

Operation long time (24/7)


The volume is extended
The life cycle of air conditioner is almost over 12 years
The temperature insde is increase
Isolation room is not good

C
C
C
C
C

Operation long time (24/7)


The volume is extended
The life cycle of air conditioner is almost over 12 years
The temperature insde is increase
Isolation room is not good

C
C
C
C
C

To start up dirrectly
Operation long time (24/7)
Factory is seal

C
C
C

BB Project # AP0004

Rec.

MAJOR
STEPS
1.Lighting

R
R
R
2. Air conditioner

R
R
R

KPOVs
SUBSTEPS

Related to waste
Comsumption is high
Efficency is low, Consumption increase
Need to turn on the light

3. AHU

R
4. Pumps & Fans

Printed 05/22/2016

Page 1

Record?

Control?

Standard?
n mc, mng v dung mi ng loi
ode, khng tp trung tin v mt ni

Mp, xc, d l trc


g mng in, ng li khng ng kh

V sinh khng sch


ng t l, ng mc v dung mi

T/c hoa
Pressure of Roller(1 to 2.5)
DOU requirement in JO
Viscosity stabilty
Material is enough quality
Compliance current product standard
Standard
Downtime
Preventive Maintenance

v cc ch thp trng nhau

BB Project # AP0004

Printed 05/22/2016

Page 2

Tandem.1
Lighting

1,376,280
1,075,199

Air conditioner
Blow. 3

1,028,160
809,139

Pumps & Fans


AHU

668,304
531,100
9665794

14.24%

You might also like