Professional Documents
Culture Documents
STEPS
KPIVs
Update :12 May 2016
High power (Sodium,
Operation long time (24/7)
Lacking nature light
Type
C
C
C/S
C
C
C
C
C
C
C
C
C
C
To start up dirrectly
Operation long time (24/7)
Factory is seal
C
C
C
BB Project # AP0004
Rec.
MAJOR
STEPS
1.Lighting
R
R
R
2. Air conditioner
R
R
R
KPOVs
SUBSTEPS
Related to waste
Comsumption is high
Efficency is low, Consumption increase
Need to turn on the light
3. AHU
R
4. Pumps & Fans
Printed 05/22/2016
Page 1
Record?
Control?
Standard?
n mc, mng v dung mi ng loi
ode, khng tp trung tin v mt ni
T/c hoa
Pressure of Roller(1 to 2.5)
DOU requirement in JO
Viscosity stabilty
Material is enough quality
Compliance current product standard
Standard
Downtime
Preventive Maintenance
BB Project # AP0004
Printed 05/22/2016
Page 2
Tandem.1
Lighting
1,376,280
1,075,199
Air conditioner
Blow. 3
1,028,160
809,139
668,304
531,100
9665794
14.24%