Input

Spanner , Multimeter (0-1000)v,.Screw driver set, Vaccum cleaner, Soft nylon brush, Relay testing kit,
Relay test Plug, Patch cords of correct size

Output Maintenance Report / Testing report


Responsibility For
a. Operation / Recording : Electrician / Maintenance log book
b. Monitoring / Recording : Elec. Engineer / Maintenance report
c. Supervision
: Manager Electrical
Activities
Sl.No.

Activity

HIRADEC

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.

Take PTW
Open the panel.
Open the Relay cover.
Remove the Relay from its cabinet.
Clean the Relay with soft brush & Electrical cleaner.
Insert the Relay in its cabinet.
Make all the connections in Relay testing kit & relay testing Plug.
Insert the Relay testing Plug.
Inject current/voltage as per the testing requirement.
Switch ON the aux. Supply to Relay as per requirement.
Check the operation of the relay & record the operating time.
Switch OFF the aux. Power supply.
Switch OFF the power supply to test kit.
Make adjustments in the Relay if required.
Repeat the testing procedure & record the operating time.
Remove the relay-testing Plug.
Close the relay cover.
Close the panel.
Remove all the man and materials from site.
Clean the site.
Close the panel door and return the PTW.

EASPECT

LEGAL

Ref
No.

Record : Maintenance Report / Testing report.


Reference Document : Self prepared

Prepared by: Mr.


Satrughna Das

Approved & Issued by: Mr. Niranjan Das

Date of Issue: 25.10.2008