Generator Control & Protection and Auxiliary Power Supply System Control
Generator Control & Protection and Auxiliary Power Supply System Control
SPEC NO.
TCE-4857A-C510-01
SHEET 1 OF1111
INTRODUCTION
This section deals with following systems
i.
ii.
iii.
1.2
Unit Control panel (UCP) construction shall be Mosaic grid type on steel
framed painted with powder coating method. The necessary auxiliary
Control supply for UCP shall be redundant.
1.2.1
Control on UCP
Following control function shall be provided in UCP for the systems
indicated in clause 1.2
1)
ISSUE
R0
TCE FORM 329 R3
SPEC NO.
TCE-4857A-C510-01
SHEET 2 OF1111
4)
SELECTION
a) Auto, manual, dead bus and off selection facilities of all
synchronising breakers controlled from UCP.
b) Auto or manual mode selection of generator excitation system
(AVR), etc.
c) Synchronising selector switches.
d) Auto trip selection switch for synchronising breaker.
Indication on UCP
Following indication shall be provided on UCP for the systems indicated in
clause 1.2 above using coloured LED and discrepancy switches.
a)
ON, OFF, and trip/trouble, LED type indication and switch of nonsynchronising breakers and isolators in tie.
b)
Open and close status 400kV breakers, isolators and earth switch.
c)
Close/open indication and switch of /trip/trouble status of all
synchronising breakers using discrepancy switches having clustered
LED type lamps.
d)
GT OLTC tap position indication.
e)
Healthiness of UCP AC & DC control supply.
f)
ON /OFF/TRIP status of chargers and UPS.
g)
Healthiness of Turbine-generator set, GT & UAT.
h)
Excitation system ON/OFF.
ISSUE
R0
TCE FORM 329 R3
SPEC NO.
TCE-4857A-C510-01
SHEET 3 OF1111
Metering on UCP
Following metering shall be provided on UCP.
(i)
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
All the meters indicated above should be analog, taut band type, 72 x 72 size
and shall have 270 degree wide scale unless otherwise specifically called at
some other place in this specification.
The accuracy of all meter shall be class 1 except TVM (Trivector meter).
TVM of generator shall be of class 0.2.
TVM shall have meter-reading facilities collection or shall have facilities to link
with PC for data retrieval and shall have data back up of 60 days.
The transducers for converting generator voltage, MW,MVAR,MVA,small
frequency,current,voltage,power factor, field voltage, field current shall be
included and shall comply with the following requirements: (1) Minimum Two galvanically isolated O/P
CONSULTANTS: TCE CONSULTING ENGINEERS LIMITED
ISSUE
R0
TCE FORM 329 R3
SPEC NO.
TCE-4857A-C510-01
SHEET 4 OF1111
1.2.5
Annunciation on UCP
Annunciation (alarm & facia windows) shall be provided for all alarms/ trip /
abnormal conditions as indicated in respective sections and as may be felt
necessary during detailed engineering.
1.2.6
A mimic diagram depicting the entire electrical systems indicated in the clause 1.2
above shall be provided in UCP. The different system (AC) and voltage level (400kV,
16.5kV, 6.6kV) shall be identified using different colours in mimic diagram. The
metering, indications, switches etc shall be located and coloured in co ordination with
mimic diagram.
1.3
DCS
Control from UCP and DCS shall be totally independent (i.e. hardwire control
for UCP which shall be independent of DCS). Measurement and display of
Generator bearing and winding temperature, seal oil pressure, H2 pressure
and H2 purity etc (The detailed list will be furnished during detailed
engineering) shall be provided on the DCS . The contractorSEC shall provide
ISSUE
R0
TCE FORM 329 R3
SPEC NO.
TCE-4857A-C510-01
SHEET 5 OF1111
1.5
UCP shall be provided with all the synchronising switches, selector switches,
push buttons, indicating lamps as needed for the control of the systems
envisaged.
1.6
The interlocks for the auxiliary power supply system shall be hard-wired
interlocks.
1.7
1.8
Sr.
No.
Description
Type
Reference list
All other details / technical particulars which are not furnished with BID shall be
finalised during detailed engineering and shall be duly approved by client.
CONSULTANTS: TCE CONSULTING ENGINEERS LIMITED
ISSUE
R0
TCE FORM 329 R3
SPEC NO.
TCE-4857A-C510-01
SHEET 6 OF1111
2.0
GENERATOR PROTECTION
2.1
2.2
All the protective relays, auxiliary relays, timers, etc., to protect the
complete generator and its subsystems shall be housed in generator relay
panel (GRP). All the protective relays shall be numerical type with serial
interface facility to communicate with DCS. The no. of numerical relays to be
provided shall consider that all generator protection functions are to be
duplicate. The controller shall establish the serial communication between the
protective relays and DCS system.
2.3
Protection Philosophy
1.1
ISSUE
R0
TCE FORM 329 R3
SPEC NO.
TCE-4857A-C510-01
SHEET 7 OF1111
Accordingly all the relays shall be divided into these three modes of tripping.
In case of 400kV breaker tripping due to protection, house load operation of
the unit shall be allowed. Suitable scheme to be
given by the
ContractorSEC.
1.3
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(j)
(k)
(l)
(m)
ISSUE
R0
TCE FORM 329 R3
SPEC NO.
TCE-4857A-C510-01
SHEET 8 OF1111
(o)
(p)
(q)
(r)
(s)
(t)
(u)
(v)
(w)
(x)
(y)
Phase overcurrent backup protection for UAT (50 UAT & 51 UAT)
(z)
(aa)
(bb)
High speed trip relays (86 G): Adequate number of high speed trip
relays for each category tripping for both the groups shall be
provided for the protection of the unit. The quantity of the trip relays
shall also consider the requirement due to the following :
(i)
(ii)
(iii)
of 6.6 kV
auxiliaries, etc.
(iv)
ISSUE
R0
TCE FORM 329 R3
SPEC NO.
TCE-4857A-C510-01
SHEET 9 OF1111
(cc)
1.4
1.5
Auxiliary VTs and Auxiliary CTs, if required for the protection systems
shall be indicated. The parameters of the same shall be selected to suit the
application and the same is subject to approval of owner. Terminal blocks for
CT wiring shall be with disconnecting links.
2.4
2.5
The characteristics and relay setting ranges included in this specification are
typical and for the guidance of the CONTRACTORSEC only. The functional
requirements and characteristics of the relays specified are the minimum
required. The responsibility of establishing the equivalence or superiority of
relays offered vis-a-vis the stipulation of the specification rests with the
CONTRACTORSEC.
ContractorSEC shall furnish recommended relay
settings with back up calculations for entire station.
2.6
Adequate number of wipe out timers having time delayed opening contacts
shall be provided to enable reset of Generator Trip relays (86 G). The setting
range of above timers shall approximately be in the range of 1-10 seconds. It
shall have adequate number of contacts as required by the scheme.
2.7
Trip Matrix required for implementing class A/B/C tripping schemes shall be
provided by the CONTRACTORSEC and shall be indicated in block interlock
diagrams to be submitted.
3.0
SPECIFIC REQUIREMENTS
3.1
3.2
3.3
Discrete relays shall be provided for 87OA, 60G11, 60G12, 60G21, 60G22,
60G31, 60G32, 61B and shall not be part of composite numerical relays.
ISSUE
R0
TCE FORM 329 R3
SPEC NO.
TCE-4857A-C510-01
SHEET 10 OF1111
Two Nos. DC supply shall be arranged by the purchaser for the GRP from two
different sections of DCDB. These supplies shall be taken through a selector
switch with the positions, viz., independent, source-1 & source-2. In the
Independent position Group-1 & 2 protection system shall be fed by source 1
& 2 respectively and the common services from any one of the sources. In
case of failure of any one source (say source 1) switch shall be changed over
to the other source (source 2) and complete DC supply requirement of GRP
shall be fed from the other source. Third DC supply for dead machine
protection shall be provided from station DCDB. In addition, dead machine
protection scheme shall be electrically and physically separated from other
protections.
DC auxiliary supply shall be supervised by supply supervising relays. The NC
contact of the relays shall be delayed on drop off by approximately 100 to 200
msec. For annunciation UCP/DCS. The relay shall be provided with flag
indicator wherever required. White colour supervision lamps of clustered LED
type shall be provided for DC supply monitoring on GRP.
3.3
3.4
Either hand reset mechanically operated operation indicator or LED with reset
push button shall be provided for protective relays. They shall be arranged to
operate only when tripping current passes through output circuit of the relay.
3.5
3.6
The protection scheme shall include all the necessary contacts to achieve
the schemes required, alarms / Trip conditions / Abnormal conditions of
individual relays in DCS/UCP, annunciation windows, sequence event
recorder and for switchyard control panel (SCP) annunciation wherever
required. Contact multiplication relays for 400 kV GT circuit breaker and
associated isolators shall be provided for this purpose and the status
indication of the same shall be shown on SCP. The lockout relay operation
and certain grouped alarms shall be available in the 400kV switchyard control
panel. DCS / SER shall have a time resolution of 1 (one) ms
3.7
Relay & Control Panels shall be supplied with anti vibration pads. A
clearance of 300 mm shall be maintained between terminal blocks and gland
plate and 150 mm between two rows of terminal blocks.
ISSUE
R0
TCE FORM 329 R3
SPEC NO.
TCE-4857A-C510-01
SHEET 11 OF1111
4.1
4.2
Main one line diagram showing the CTs, PTs connected meters, relays etc.
with parameters of equipment.
4.3
4.4
4.5
SL.
NO.
DESCRIPTIONS
UNIT
PARTICULARS
1.0
1.1
1.2
1.2.1
1.2.2
1.2.3
1.3
1.3.1
Volts
*
*
*
*
*
*
*
*
1.3.2
Current rating
Amp
1.3.3
Voltage rating
Volts
1.3.4
1.3.5
1.4
Applicable standards
Aux. Supply operating range
Relay types offered (list each relay and
furnish catalogues of each relay type
offered)
All the relays offered are type tested
If no which are all not type tested
1.5
1.6
*
*
*
*
*
ISSUE
R0
TCE FORM 329 R3