Professional Documents
Culture Documents
Page
ii
ii
20
20
122
FLASHLIGHT
20xx NEW PRODUCT
XXXXI10D001
= ATTACHED/JOINED
COMPONENTS
A.
HOUSING
B.
BATTERIES
C.
ON/OFF SWITCH
D.
BULB ASSEMBLY
E.
PLATE
F.
SPRING
PLATE
E
+
BULB
ASSEMBLY
D
BATTERIES
B
HOUSING
A
SWITCH
ON/OFF
C
SPRING
F
-
ATTACHEMENT METHOD
1.
SLIP FIT
2.
RIVETS
3.
THREAD
4.
SNAP FIT
5.
COMPRESSIVE FIT
NOTE: The example below is a relational block diagram. Other types of block diagrams, schematics, pictures, etc.
may be used by the FMEA Team to clarify the item(s) being considered in their analysis.
LETTERS = COMPONENTS
TEMPERATURE:
-20 TO 160 F
CORROSIVE: TEST SCHEDULE B
SHOCK: 6 FOOT DROP
FOREIGN MATERIAL: DUST
FLAMMABILITY: (WHAT COMPONENT(S) ARE NEAR HEAT SOURCE(S)?)
OTHER:
SYSTEM NAME:
YEAR VEHICLE PLATFORM:
FMEA I.D. NUMBER:
Lower
Front
Tube
Weld
Top
Tube
Attachment
Sprocket Shaft
Pedal Crank
Bolt
Weld
Pedal
Lower
Rear
Tube
Vertical:
Down and Up
Vertical:
Down and Up
Force Transfer
Vertical:
Down and Up
Clamp Ring
Seat Tube
Compression / Friction
Seat Post
Compression / Friction
Seat Top
Legend:
Weld
Horizontal:
360 degrees
Horizontal:
360 degrees
Scope
Requirements
Process Step
/ Function
Core Team
Potential
Failure
Mode
Potential
Effect(s) of
Failure
Severity
Model Year(s)/Program(s)_________________________________
Potential
Cause(s)
of Failure
Current
Process
Controls
Detection
Current
Process
Controls
Prevention
Recommended
Action
Completion Date
& Target
Responsibility
Page
Occurrence
Prepared By:
Detection
RPN
Item: _________________________________________________
Classification
FMEA Number
Action Results
Actions Taken
of
Severity
POTENTIAL
FAILURE MODE AND EFFECTS ANALYSIS
(PROCESS FMEA)
RPN
Detection
Occurance