Extreme Right (Candidates Sign.) Extreme Left (Project Supervisor) Right Bottom: Head of Deptt. Certificate From Organisation Acknowledgement Properly signed (right side) Date on Left Index (Table of Contents) Introduction About Organisation Aims & Objectives Manpower Project/Problem Selection Project Monitoring System Gantt Chart PERT Chart System Study Existing System alongwith limitations/ deficiencies Proposed System alongwith intended objectives Feasibility Study Operational Technical Economic, etc. System Analysis Requirement Specification System Flowcharts DFDs/HIPOs/ERDs Sources of Data (Fact Finding) System Design File/Database Design Program Design Coding Input/Output Form Design Screen Design Report Design System Testing Preparation of Test Data Testing With Dummy Data Testing With Live Data
System Implementation Changeover Staged Direct Documentation Operational Document User Manual Miscellaneous Scope of the Project Deficiencies Further Scope