You are on page 1of 1

Blueprint Reading POST Assessment for CPM Wolverine Proctor

Employee Name: _______________


1.
2.
3.
4.
5.
6.

How many general notes are on this blueprint?


How many .44 diameter holes are there on the drawing?
What is the major diameter of the counter-sunk holes in the front view?
What is the countersink angle?
In the front view, how far from the bottom of the part are the holes placed?
In the front view, how far is the center of the second hole from the left side of

the part?
7. Name the views shown.
8. What is the requirement for burrs?
9. When was this blueprint drawn?
10.Who created this print?
11.What is the general tolerance requirement for 3 place decimal dimensions?
12. What is the general tolerance requirement for angles?
13.Is this a first angle projection, or a third angle projection print?
14.How is it specified that this print is in inches?
15.How many sheets are included in this drawing?
16.What is the scale of this drawing?
17.What is the overall width of this part?
18.What system of dimensioning is used for this print, base-line or chain?
19.What is the largest possible width of this piece? (left to right)
20.What is the lowest possible hole size for the .44 holes?
21.What is the information area at the bottom right of the print called?
22.Have revisions been made?
23.What is the print number?
24.Are the general tolerances bilateral or unilateral tolerances?
25.What type of line dimensions the .44 diameter holes?

You might also like