TO Be Phase
As Is and To Be Documentation
Gap Analysis
To Be Sign Of
Closing of Gaps as per scope
Unit Testing
Preparation of test cases
Unit testing
Changes to configuration for any errors
Integration Testing
Integration Testing and Test Script Documentation
Indentification of Gap
Priortization of Gaps which are sure stopper for Go Live
Sign Of on Integration Testing
Closing of remaining gaps and processes
Basis Activities
List of Users for User Creation
Testing of Roles created for SMB Proejcts on ECC 5.0
Ensure Availability of PC with SAP Front end, LAN, Printer at each required end user place at all locations
Front End loading and Testing of SAP transactions at each locations
Completeness of Connectivity between HO and other locations.
Strategy for Authorization Profile, roles and User Creation
Testing of Authorisations
Client Copy from Dev to Quality & production / New Client Preparation
Master Data Activities
Preparation of Master Data
Validation of Master Data by Bcone Team and Core Team
Sign of on Master Data Prepared
Preparation of LSMW for Master Data
Preparation of BDCs for Specific Master Data
Test Upload on Test
Upload of Master Data in Sequence on Test
Cutover Activities
Communication to Vendor, Customer and Excise etc
User Training by Core Team
Cost Roll ups and Validations - Test
Upload of Master Data in Sequence on Test
Start entry of Open Sales Orders, Quotation, Enquiries, Purchase Orders in Prod
Stock Taking Activity at Plant
Stock Upload with SAP Material Code, Qty, Value and Storage Location as on Go-Live Date
Enter Cash Balances as of Go-Live Dates
Enter Excise balances as of Go-Live Dates with monthly duty payment for March
Configure Cut of Excise Number Range (Excise Invoice, RG registers) as on Go-Live Dates
Back up of Loaded Production Server
Go Live
Availability of all balances
FI Balance uploads (For both ledgers/ subledgers/ assets/ customers/ vendors)
Cutover is The process of transitioning from one system to a new one
Cut over Plan is All documentation related to planning, preparing and executing cutover, describing how to lock
down the system from a technical change management perspective, preparing the the system for its new role
and rolling out the SAP graphical user interface to all future end users.
CUTOVER PLAN describes all cutover tasks that have to be performed before the actual go-live
Examples of cutover tasks are:
Review and update all systems-related operations procedures like backup policies and system monitoring
Assign ownership of SAPu2019s functional processes to individuals
Let SAP AG do a GoingLive check, to get their blessing to go live with the system
Lock down the system, i.e. do not make any more changes to the SAP system
Planning the Master data Migration Process is also a Cutover Task.
Cutover Activities or Master Data Uploading Strategies Depending upon the when we are going live. As per
that, you have to give the information to your core team. If you goling live at the middle you have to upload the
all P&L Account items and B/S Items. If you going live at the financial year start, you have to only Upload the
B/S Items. Activities for Golive:
1. G/L Master Upload Thru BDC or LSMW (TC-Fs00 and extended one co code to another company code
Fs01)
2. Vendor Master Upload Thru BDC Or LSMW (Will be Taken Care By MM)
3. Customer Master Upload Thru BDC or LSMW (Will be Taken Care By SD)
4. Asset Master Upload(Thru As90)
5. Cost Element Master Upload
6. Cost Center Master Upload
7. Profit Center Master Upload
8. G/L Balances Thru F-02
10. Vendor Balances thru F-43
11. Customer Balances thru F-22
12. Customer Advances thru f-29
13. Vendor Advances thryu F-48
Before uploading Vendor Balances you have to take care of WHT(TDS) Information.
Hi Friends, PP cycle is simple- Here i am summarizing MTO & MTS. I have already shared the same in my
integration document. Requesting to go thru' the same.
attached to any specific customer. Further confirmations are done and issues of material are carried out to the
production order. Finally the production is put in to stock (GR). Here at any point of time a sales order might
come in and delivery to the customer is done from the existing stock.
Production Master Data:-The Production Master Data consists of Material Master, Bill of Material, Work Center,
Route, and Production Line Design.
The Material Master is created first for all components involved in making the Final product. Then these
components are put in a product relationship i.e. a list of materials required to make the final product are put in
a hierarchy, this is called a Bill of Material. The next task is to identify the work centers required to produce the
product; if the work centers are already created then they can be readily put in a sequence, which would be a
sequence of work centers required to produce the product. This sequence of work centers one after the other
(in the sequence of work to be done) is called a Route.
The Cycle of Made to stock: Steps: MTS Scenario
1. Material Creation (Made To Stock Material with major changes of: Item Category: NORM )
2. Creation of BOM
3. Route Creation
4. Demand requirements
5. MRP Run
6. Creation/conversion of Production order (Made To stock), Scheduling, Costing, Release and Save
7. Production order Quantity confirmations for operations, Parallel task of material Issue to order or to
reservations (261)
8. Fully Produced Production Quantities will be put into stock (GR)
9. Sales order Creation
10. Delivery against sales order
11. Invoicing.