Professional Documents
Culture Documents
Project Reference:
Project Title:
Designer:
Planning Supervisor:
Principal Contractor:
Project Principal:
Attendees:
Location:
Date:
Brief Project Description
Question
1. Designer experience
and training
Guidance
Has a competence
assessment been made?
3. Principles of design
safety applied in all phases
of a project design
At Feasibility, Preliminary,
Detailed and during
construction?
H&S adequately
considered in optioneering and
in the justification of preferred
option(s)?
Level of detail appropriate
to project phase?
DRAs for each
area/element of the works?
Which format of forms
utilised for Design Risk
Assessments?
Evidence of DRA carried
out concurrent with and not post
design?
Design risk assessment
kept up to date?
How is it ensured that
residual risk is communicated?
4. Design Risk
Assessment (DRA)
process and
documentation
322166794.doc
Response / Comments
Page 1 of 3
6. Design Risk
Assessment
Considerations
9. Communication of
residual risk
322166794.doc
Page 2 of 3
Commitments:
322166794.doc
By whom:
By when:
Page 3 of 3