Perhitungan Kapasitas Tampungan Aktif Waduk ( C )

Metode : Simulasi
Kapasitas Tampungan Dicoba :
155.00
Bulan
Inflow
Outflow
Volume
Ke- (m3/det.bln) (m3/det.bln) (m3/det.bln)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

136.80
106.30
78.70
86.60
67.10
67.20
64.10
52.20
40.60
39.30
45.10
81.80
69.70
95.40
158.80
89.40
65.00
42.60
77.80
52.20
37.30
34.30
40.20
68.10

66.80
66.20
65.50
57.20
60.30
62.20
59.00
55.20
46.80
48.10
64.80
74.40
66.80
66.20
65.50
57.20
60.30
62.20
59.00
55.20
46.80
48.10
64.80
74.40

225.00
195.10
168.20
184.40
161.80
160.00
160.10
152.00
145.80
137.00
117.30
124.70
127.60
156.80
248.30
187.20
159.70
135.40
154.20
151.20
141.70
127.90
103.30
97.00

25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54

61.30
63.20
80.40
86.70
65.80
66.80
55.30
49.10
40.60
45.60
43.40
97.40
85.40
105.60
100.30
76.30
71.80
62.70
49.20
42.30
42.90
36.90
47.40
99.70
80.90
180.00
95.40
96.40
98.40
68.70

66.80
66.20
65.50
57.20
60.30
62.20
59.00
55.20
46.80
48.10
64.80
74.40
66.80
66.20
65.50
57.20
60.30
62.20
59.00
55.20
46.80
48.10
64.80
74.40
66.80
66.20
65.50
57.20
60.30
62.20

91.50
88.50
103.40
132.90
138.40
143.00
139.30
133.20
127.00
124.50
103.10
126.10
144.70
184.10
189.80
174.10
166.50
155.50
145.20
132.30
128.40
117.20
99.80
125.10
139.20
253.00
184.90
194.20
193.10
161.50

55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84

61.10
51.50
47.10
43.30
60.50
51.20
107.40
71.20
52.00
56.00
58.10
45.30
43.50
38.50
30.30
30.80
41.20
62.40
84.40
73.10
69.40
74.70
49.10
50.40
42.10
42.10
31.60
39.60
54.60
95.30

59.00
55.20
46.80
48.10
64.80
74.40
66.80
66.20
65.50
57.20
60.30
62.20
59.00
55.20
46.80
48.10
64.80
74.40
66.80
66.20
65.50
57.20
60.30
62.20
59.00
55.20
46.80
48.10
64.80
74.40

157.10
151.30
151.60
146.80
142.50
119.30
159.90
160.00
141.50
140.30
138.10
121.20
105.70
89.00
72.50
55.20
31.60
19.60
37.20
44.10
48.00
65.50
54.30
42.50
25.60
12.50
(2.70)
(11.20)
(21.40)
20.90

85
84.60
66.80
38.70
86
100.90
66.20
73.40
87
110.70
65.50
118.60
88
80.30
57.20
141.70
89
56.60
60.30
138.00
90
52.20
62.20
128.00
91
45.40
59.00
114.40
92
47.30
55.20
106.50
93
43.00
46.80
102.70
94
39.10
48.10
93.70
95
43.40
64.80
72.30
96
65.90
74.40
63.80
Kesimpulan :
1 Waduk penuh pada awal simulasi
2 Volume Aktif Rencana, dicoba-coba sebesar (juta) :
3 Banyak Data analisis adalah : 8 x 12 bulan
:
4 Probabilitas kegagalan direncanakan 5 %
:
5 Hasil Analisis menunjukkan C Rencana masih terlalu besar,
N Waduk kosong = 3 Bln < 5 Bln

f Waduk ( C )
(m3/det.bln)
Pelimpahan
(m3/det.bln)

Keterangan

70.00
40.10
13.20
29.40
6.80
5.00
5.10

Penuh
Penuh
Penuh
Penuh
Penuh
Penuh
Penuh

1.80
93.30
32.20
4.70

Penuh
Penuh
Penuh
Penuh

29.10
34.80
19.10
11.50
0.50

Penuh
Penuh
Penuh
Penuh
Penuh

98.00
29.90
39.20
38.10
6.50

Penuh
Penuh
Penuh
Penuh
Penuh

2.10

Penuh

4.90
5.00

Penuh
Penuh

Kosong
Kosong
Kosong

oba sebesar (juta) :


x 12 bulan
:
akan 5 %
:
encana masih terlalu besar,

402 M^3
96 Bln
5 Bln

Perhitungan Kapasitas Tampungan Aktif Waduk ( C )


Metode : Simulasi
Kapasitas Tampungan dicoba :
140.00 (m3/det.bln)
Bulan
Inflow
Outflow
Volume
Ke- (m3/det.bln) (m3/det.bln) (m3/det.bln)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

136.80
106.30
78.70
86.60
67.10
67.20
64.10
52.20
40.60
39.30
45.10
81.80
69.70
95.40
158.80
89.40
65.00
42.60
77.80
52.20
37.30
34.30

66.80
66.20
65.50
57.20
60.30
62.20
59.00
55.20
46.80
48.10
64.80
74.40
66.80
66.20
65.50
57.20
60.30
62.20
59.00
55.20
46.80
48.10

210.00
180.10
153.20
169.40
146.80
145.00
145.10
137.00
130.80
122.00
102.30
109.70
112.60
141.80
233.30
172.20
144.70
120.40
139.20
136.20
126.70
112.90

Pelimpahan
(m3/det.bln)

70.00
40.10
13.20
29.40
6.80
5.00
5.10

1.80
93.30
32.20
4.70

23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

40.20
68.10
61.30
63.20
80.40
86.70
65.80
66.80
55.30
49.10
40.60
45.60
43.40
97.40
85.40
105.60
100.30
76.30
71.80
62.70
49.20
42.30
42.90
36.90
47.40
99.70
80.90

64.80
74.40
66.80
66.20
65.50
57.20
60.30
62.20
59.00
55.20
46.80
48.10
64.80
74.40
66.80
66.20
65.50
57.20
60.30
62.20
59.00
55.20
46.80
48.10
64.80
74.40
66.80

88.30
82.00
76.50
73.50
88.40
117.90
123.40
128.00
124.30
118.20
112.00
109.50
88.10
111.10
129.70
169.10
174.80
159.10
151.50
140.50
130.20
117.30
113.40
102.20
84.80
110.10
124.20

29.10
34.80
19.10
11.50
0.50

50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76

180.00
95.40
96.40
98.40
68.70
61.10
51.50
47.10
43.30
60.50
51.20
107.40
71.20
52.00
56.00
58.10
45.30
43.50
38.50
30.30
30.80
41.20
62.40
84.40
73.10
69.40
74.70

66.20
65.50
57.20
60.30
62.20
59.00
55.20
46.80
48.10
64.80
74.40
66.80
66.20
65.50
57.20
60.30
62.20
59.00
55.20
46.80
48.10
64.80
74.40
66.80
66.20
65.50
57.20

238.00
169.90
179.20
178.10
146.50
142.10
136.30
136.60
131.80
127.50
104.30
144.90
145.00
126.50
125.30
123.10
106.20
90.70
74.00
57.50
40.20
16.60
4.60
22.20
29.10
33.00
50.50

98.00
29.90
39.20
38.10
6.50
2.10

4.90
5.00

77
49.10
60.30
39.30
78
50.40
62.20
27.50
79
42.10
59.00
10.60
80
42.10
55.20
(2.50)
81
31.60
46.80
(17.70)
82
39.60
48.10
(26.20)
83
54.60
64.80
(36.40)
84
95.30
74.40
20.90
85
84.60
66.80
38.70
86
100.90
66.20
73.40
87
110.70
65.50
118.60
88
80.30
57.20
141.70
89
56.60
60.30
138.00
90
52.20
62.20
128.00
91
45.40
59.00
114.40
92
47.30
55.20
106.50
93
43.00
46.80
102.70
94
39.10
48.10
93.70
95
43.40
64.80
72.30
96
65.90
74.40
63.80
Kesimpulan :
1 Waduk penuh pada awal simulasi
2 Volume Aktif Rencana, dicoba-coba sebesar (juta) :
3 Banyak Data analisis adalah : 8 x 12 bulan
:
4 Probabilitas kegagalan direncanakan 5 %
:
5 Hasil Analisis menunjukkan C Rencana sudah mendekati rencan
N Waduk kosong = 4 Bln < 5 Bln

Keterangan

Penuh
Penuh
Penuh
Penuh
Penuh
Penuh
Penuh

Penuh
Penuh
Penuh
Penuh

Penuh
Penuh
Penuh
Penuh
Penuh

Penuh
Penuh
Penuh
Penuh
Penuh
Penuh

Penuh
Penuh

Kosong
Kosong
Kosong
Kosong

363
96
5
mendekati rencana

M3
Bln
Bln

Perhitungan Kapasitas Tampungan Aktif Waduk ( C )

Metode : Simulasi
Kapasitas Tampungan dicoba :
Bulan
Inflow
Outflow
Ke(m3/det)
(m3/det)
(1)

(2)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

136.80
106.30
78.70
86.60
67.10
67.20
64.10
52.20
40.60
39.30
45.10
81.80
69.70
95.40
158.80
89.40
65.00
42.60
77.80
52.20
37.30
34.30

(3)

66.80
66.20
65.50
57.20
60.30
62.20
59.00
55.20
46.80
48.10
64.80
74.40
66.80
66.20
65.50
57.20
60.30
62.20
59.00
55.20
46.80
48.10

130.00 (m3/det)
Volume
Pelimpahan
(m3/det)
(m3/det)
(4)

200.00
170.10
143.20
159.40
136.80
135.00
135.10
127.00
120.80
112.00
92.30
99.70
102.60
131.80
223.30
162.20
134.70
110.40
129.20
126.20
116.70
102.90

(5)

70.00
40.10
13.20
29.40
6.80
5.00
5.10

1.80
93.30
32.20
4.70

23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

40.20
68.10
61.30
63.20
80.40
86.70
65.80
66.80
55.30
49.10
40.60
45.60
43.40
97.40
85.40
105.60
100.30
76.30
71.80
62.70
49.20
42.30
42.90
36.90
47.40
99.70
80.90

64.80
74.40
66.80
66.20
65.50
57.20
60.30
62.20
59.00
55.20
46.80
48.10
64.80
74.40
66.80
66.20
65.50
57.20
60.30
62.20
59.00
55.20
46.80
48.10
64.80
74.40
66.80

78.30
72.00
66.50
63.50
78.40
107.90
113.40
118.00
114.30
108.20
102.00
99.50
78.10
101.10
119.70
159.10
164.80
149.10
141.50
130.50
120.20
107.30
103.40
92.20
74.80
100.10
114.20

29.10
34.80
19.10
11.50
0.50

50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76

180.00
95.40
96.40
98.40
68.70
61.10
51.50
47.10
43.30
60.50
51.20
107.40
71.20
52.00
56.00
58.10
45.30
43.50
38.50
30.30
30.80
41.20
62.40
84.40
73.10
69.40
74.70

66.20
65.50
57.20
60.30
62.20
59.00
55.20
46.80
48.10
64.80
74.40
66.80
66.20
65.50
57.20
60.30
62.20
59.00
55.20
46.80
48.10
64.80
74.40
66.80
66.20
65.50
57.20

228.00
159.90
169.20
168.10
136.50
132.10
126.30
126.60
121.80
117.50
94.30
134.90
135.00
116.50
115.30
113.10
96.20
80.70
64.00
47.50
30.20
6.60
(5.40)
17.60
24.50
28.40
45.90

98.00
29.90
39.20
38.10
6.50
2.10

4.90
5.00

77
49.10
60.30
34.70
78
50.40
62.20
22.90
79
42.10
59.00
6.00
80
42.10
55.20
(7.10)
81
31.60
46.80
(22.30)
82
39.60
48.10
(30.80)
83
54.60
64.80
(41.00)
84
95.30
74.40
20.90
85
84.60
66.80
38.70
86
100.90
66.20
73.40
87
110.70
65.50
118.60
88
80.30
57.20
141.70
11.70
89
56.60
60.30
126.30
90
52.20
62.20
116.30
91
45.40
59.00
102.70
92
47.30
55.20
94.80
93
43.00
46.80
91.00
94
39.10
48.10
82.00
95
43.40
64.80
60.60
96
65.90
74.40
52.10
Kesimpulan :
1 Waduk penuh pada awal simulasi
2 Volume Aktif Rencana, dicoba-coba sebesar (juta) :
3 Banyak Data analisis adalah : 8 x 12 bulan
:
4 Probabilitas kegagalan direncanakan 5 %
:
5 Hasil Analisis menunjukkan C Rencana sudah sesuai dg rencan
N Waduk kosong = 5 Bln

Keterangan
(6)

Penuh
Penuh
Penuh
Penuh
Penuh
Penuh
Penuh

Penuh
Penuh
Penuh
Penuh

Penuh
Penuh
Penuh
Penuh
Penuh

Penuh
Penuh
Penuh
Penuh
Penuh
Penuh

Penuh
Penuh

Kosong

Kosong
Kosong
Kosong
Kosong

Penuh

337 juta M3
96 Bln
5 Bln
sesuai dg rencana