Education: Bsc. in Petroleum Refining Engineering( Faculty of Petroleum, Suez, May, 1973)
Present Position:
Freelance Instructor in Petroleum Industries
Professional Experience:
- Rotating Equipment (Pumps & Compressors) for Process Engineers (2 times) for:
Middle East Oil Refinery (MIDOR), Egypt (Feb. 2007)
Oil & Gas Skills (OGS), Egypt (Feb. 2007)
NOTE: During the above mention period, I shared as an Instructor in Basic Oil Studies
program for two times.
• Set – Up design basic of the process units (material and heat balance).
• Design of mass transfer equipment such as towers, separators, etc.
• Design of heat transfer equipment such as heat exchangers, coolers, fired heaters, etc.
• Design of fluid mover's equipment such as pumps and compressors.
• Draw and review of
- Process flow diagram (PFD)
- Piping and instrumentation diagram (PID’s)
• Technical and economical evaluation of new projects.
• Revamp the existing process units.
• Feasibility studies of the new projects and revamped process units.
• Set-up and review of tender documents.
• Evaluation of contractor’s Bids.
• Follow-up construction phase of new projects.
• Share with commissioning team to commission the new projects.
• Follow – up the performance test runs for the new and revamped process units.
• Study operation troubleshooting and report the recommended advice.
• Train the appointed engineers.
• Write technical reports.
During the Period from 1986 to 1989, I’ve worked on loan basis
for the following Gas Processing Companies:
From May 1986 To Mar. 1987:
I worked with PELAYM PETROLEUM CO. (PETROBEI) on loan basis. My post was
a gas plant superintendent. My duties were responsible for gas plant:
- Operation
- Maintenance
- Quality Control (Lab)
- Managerial
I worked with SUEZ OIL CO. (SUCO) on loan basis in the gas planet. My post was
processing superintendent and my duties were:
- Follow-up construction
- Share with commissioning team to commission the gas plant.
- Head of start-up team.
- Head of operation team.
- Train the appointed operators.
I worked with BADR EL DIN PETROLEUM CO. (BAPETCO) on loan basis in the gas
plant project (BED-3) My duties were:
Revise and approve PFDS and PID’s for the new gas plant project.
Recruit well qualified staff (operators, technicians and engineers) to operate and maintain the
new gas plant.
- Set-up training Programs for the appointed staff.
- Write technical Reports about the project progress.
- Supervise and advise process variables and trouble – shooting for the process units.
- Prepare and follow – up process units start – ups and shut – downs.
- Equipment rating and advise the required modifications for the rated equipment.
- Follow up safety rules and instructions process units' safety.
From Dec. 1975 To Feb. 1977:
I worked as junior process engineer in Atmospheric distillation units (Four Atmospheric
Distillation units, Three vapor Recovery units and Re. Run Unit).
Utilities (water treatment unit, steam boilers and wastewater Treatment unit).