The radiogram provides a schedule of activities for the International Space Station crew for February 13, 2007. It details the timing of tasks such as morning inspection, breakfast, physical exercise, EVA tool preparation and stowage, maintenance activities, medical checks, and crew sleep periods. Major items include FE-1 regenerating an absorption cartridge, CDR and FE-1 reviewing EVA procedures with specialists, FE-2 deploying the FMK, and hand ergometry tests with specialists. The day culminates with dinner and sleep periods for the crew.
The radiogram provides a schedule of activities for the International Space Station crew for February 13, 2007. It details the timing of tasks such as morning inspection, breakfast, physical exercise, EVA tool preparation and stowage, maintenance activities, medical checks, and crew sleep periods. Major items include FE-1 regenerating an absorption cartridge, CDR and FE-1 reviewing EVA procedures with specialists, FE-2 deploying the FMK, and hand ergometry tests with specialists. The day culminates with dinner and sleep periods for the crew.
The radiogram provides a schedule of activities for the International Space Station crew for February 13, 2007. It details the timing of tasks such as morning inspection, breakfast, physical exercise, EVA tool preparation and stowage, maintenance activities, medical checks, and crew sleep periods. Major items include FE-1 regenerating an absorption cartridge, CDR and FE-1 reviewing EVA procedures with specialists, FE-2 deploying the FMK, and hand ergometry tests with specialists. The day culminates with dinner and sleep periods for the crew.
PREPARATION FOR EVA. MEDICAL EXPERIMENTS GMT CREW ACTIVITY
02:00-02:10 Morning inspection
02:10-02:40 Post-sleep 02:40-03:25 FE-1 BREAKFAST 02:40-03:30 CDR, FE-2 03:25-03:40 FE-1 Regeneration of БМП Absorption Cartridge Ф2 (start) 03:30-03:40 CDR, FE-2 Prep for Work 03:40-03:55 Daily Planning Conference (S-band) 03:55-04:25 FE-1 Prep for Work 03:55-04:15 CDR, FE-2 04:15-04:50 FE-2 US EVA tool config 04:15-04:20 CDR Connect DCP power cable Reviewing the preliminary EVA T/L radiogram and EVA tool procedures Tagup 04:30-06:30 CDR, FE-1 with specialists (S-band) 04:50-05:15 US EVA tool config FE-2 05:15-06:45 Physical Exercise (TVIS) Searching for Russian hardware and tools for EVA-17A. Tagup with specialists (S- 06:30-08:00 CDR, FE-1 band) 06:45-06:55 TVIS Weekly Maintenance FE-2 06:55-08:50 US EVA Tool Stowage Ops 08:00-09:00 CDR Physical Exercise (RED) 08:00-09:00 FE-1 Physical Exercise (VELO) day 1 08:50-09:00 FE-2 FMK deployment ops 09:00-10:00 LUNCH 10:30-11:00 FE-1 СОЖ maintenance 10:30-13:35 FE-2 US EVA Tool Stowage Ops Preparation of СКК #9-СМ. Photography Tagup with specialists (S-band) Comm 11:00-11:30 FE-1 config from DC: Return to nominal comm. configuration: 11:30-13:00 FE-1 Physical Exercise (TVIS), day 1 11:30-13:00 Physical Exercise (CEVIS) CDR 13:00-13:20 IMS update / Auxiliary Computer Systems [ВКС], item 3.4-3.7, pp. 3-2 through 3-3 13:15-13:55 FE-1 Evening work prep 13:35-13:40 FE-2 Scheduled inspection of RED 13:35-14:20 CDR Evening work prep 13:40-14:40 FE-2 Physical Exercise (RED) ISS-MCC-M TV. Greetings on the 60th Anniversary of Security Force For Top 13:55-14:20 FE-1 Secret Installations (То=13:55, Т1, Т2, Т3 - from СПП) 14:20-14:40 FE-1 Evening work prep 14:20-14:35 CDR Private Medical Conference (S + Ku-band) 14:40-14:55 Daily Planning Conference (S-band) 14:55-15:00 FE-2 Transfer TVIS/RED/CEVIS/HRM data to MEC 14:55-15:10 CDR Evening work prep 14:55-15:30 FE-1 Daily Food Prep 15:00-15:15 FE-2 Evening work prep 15:10-15:40 CDR Daily Food Prep 15:15-15:30 FE-2 Private medical conference (S + Ku-band) 15:30-15:40 FE-1 Set up 825М3 Battery Pack 1 for charging and start charging 15:30-16:10 FE-2 Evening work prep FE-1, CDR 15:40-16:10 МО-6. Hand ergometry То = 15:42. Tagup with specialists (VHF) (пом.) 16:10-16:25 FE-1 Private Medical Conference (S + Ku-band) 16:10-17:10 CDR Pre-sleep 16:10-16:40 FE-2 Daily Food Prep 16:25-16:40 Regeneration of БМП Absorption Cartridge Ф2 (terminate) FE-1 16:40-17:10 Pre-sleep 16:40-17:40 FE-2 Pre-sleep CDR, FE-1 17:10-17:40 МО-6. Hand ergometry. Tagup with specialists (VHF) То = 17:14 (пом.) 17:40-18:10 DINNER 18:10-02:40 SLEEP ТБУ (Universal Bioengineering Thermostat). Temperature check Task List FE-1 RASTENIYA-2. Recharging water tank Note: See OSTP for references to US activities. End of Radiogram