You are on page 1of 2

Radiogram No.

4688u Form 24 for 02/13/07 (UPDATED)


PREPARATION FOR EVA. MEDICAL EXPERIMENTS
GMT CREW ACTIVITY

02:00-02:10 Morning inspection


02:10-02:40 Post-sleep
02:40-03:25 FE-1
BREAKFAST
02:40-03:30 CDR, FE-2
03:25-03:40 FE-1 Regeneration of БМП Absorption Cartridge Ф2 (start)
03:30-03:40 CDR, FE-2 Prep for Work
03:40-03:55 Daily Planning Conference (S-band)
03:55-04:25 FE-1
Prep for Work
03:55-04:15 CDR, FE-2
04:15-04:50 FE-2 US EVA tool config
04:15-04:20 CDR Connect DCP power cable
Reviewing the preliminary EVA T/L radiogram and EVA tool procedures Tagup
04:30-06:30 CDR, FE-1
with specialists (S-band)
04:50-05:15 US EVA tool config
FE-2
05:15-06:45 Physical Exercise (TVIS)
Searching for Russian hardware and tools for EVA-17A. Tagup with specialists (S-
06:30-08:00 CDR, FE-1
band)
06:45-06:55 TVIS Weekly Maintenance
FE-2
06:55-08:50 US EVA Tool Stowage Ops
08:00-09:00 CDR Physical Exercise (RED)
08:00-09:00 FE-1 Physical Exercise (VELO) day 1
08:50-09:00 FE-2 FMK deployment ops
09:00-10:00 LUNCH
10:30-11:00 FE-1 СОЖ maintenance
10:30-13:35 FE-2 US EVA Tool Stowage Ops
Preparation of СКК #9-СМ. Photography Tagup with specialists (S-band) Comm
11:00-11:30 FE-1 config from DC:
Return to nominal comm. configuration:
11:30-13:00 FE-1 Physical Exercise (TVIS), day 1
11:30-13:00 Physical Exercise (CEVIS)
CDR
13:00-13:20 IMS update / Auxiliary Computer Systems [ВКС], item 3.4-3.7, pp. 3-2 through 3-3
13:15-13:55 FE-1 Evening work prep
13:35-13:40 FE-2 Scheduled inspection of RED
13:35-14:20 CDR Evening work prep
13:40-14:40 FE-2 Physical Exercise (RED)
ISS-MCC-M TV. Greetings on the 60th Anniversary of Security Force For Top
13:55-14:20 FE-1
Secret Installations (То=13:55, Т1, Т2, Т3 - from СПП)
14:20-14:40 FE-1 Evening work prep
14:20-14:35 CDR Private Medical Conference (S + Ku-band)
14:40-14:55 Daily Planning Conference (S-band)
14:55-15:00 FE-2 Transfer TVIS/RED/CEVIS/HRM data to MEC
14:55-15:10 CDR Evening work prep
14:55-15:30 FE-1 Daily Food Prep
15:00-15:15 FE-2 Evening work prep
15:10-15:40 CDR Daily Food Prep
15:15-15:30 FE-2 Private medical conference (S + Ku-band)
15:30-15:40 FE-1 Set up 825М3 Battery Pack 1 for charging and start charging
15:30-16:10 FE-2 Evening work prep
FE-1, CDR
15:40-16:10 МО-6. Hand ergometry То = 15:42. Tagup with specialists (VHF)
(пом.)
16:10-16:25 FE-1 Private Medical Conference (S + Ku-band)
16:10-17:10 CDR Pre-sleep
16:10-16:40 FE-2 Daily Food Prep
16:25-16:40 Regeneration of БМП Absorption Cartridge Ф2 (terminate)
FE-1
16:40-17:10 Pre-sleep
16:40-17:40 FE-2 Pre-sleep
CDR, FE-1
17:10-17:40 МО-6. Hand ergometry. Tagup with specialists (VHF) То = 17:14
(пом.)
17:40-18:10 DINNER
18:10-02:40 SLEEP
ТБУ (Universal Bioengineering Thermostat). Temperature check
Task List FE-1
RASTENIYA-2. Recharging water tank
Note: See OSTP for references to US activities.
End of Radiogram

You might also like