You are on page 1of 2

Radiogram No.

5853u Form 24 for 08/02/07


Removal of Progress 360 Kurs A Hardware. Health Status
GMT CREW ACTIVITY

06:00-06:10 CDR, FE-1 Morning Inspection


06:00-06:25 FE-2 Nutrition: urine collection and sample insertion into MELFI
06:10-06:40 CDR, FE-1
Post-sleep
06:25-06:55 FE-2
06:40-07:30 CDR, FE-1
BREAKFAST
06:55-07:45 FE-2
07:30-07:45 CDR, FE-1 Prep for Work
07:45-08:00 Daily Planning Conference (S-band)
08:00-08:10 FE-1
Prep for Work
08:00-08:20 FE-2
08:00-10:35 CDR
Removal of Progress 360 Kurs A hardware
08:10-10:35 FE-1
08:20-08:40 NUTR. Stowing urine sampling kit
08:40-10:10 FE-2 Physical Exercise (CEVIS)
10:10-11:10 Physical Exercise (RED)
10:35-10:45 CDR, FE-1 IP-telephone Conference between ISS crew and MIR Bathyscaph
CDR, Orthostatic stability evaluation with LBNP (То = 11:17). Tagup with specialists
10:45-11:40
FE-1 пом (VHF)
11:10-11:40 A/L smoke detector inspection
FE-2
11:40-12:15 Lab smoke detector inspection
11:40-11:55 CDR,FE-1 IMS tagup (S-band)
CDR IMS Update
11:55-12:15
FE-1 PLANTS-1. Data collection and downlink
FE-1, Orthostatic stability evaluation with LBNP (То=12:51). Tagup with specialists
12:15-13:15
CDR пом (VHF)
12:15-12:45 Inspection of Node-1 smoke detector
FE-2 Scheduled maintenance of Compound Specific Analyzer- Combustion Products
12:45-13:15
(CSA-CP)
13:15-13:45 STS 118/13A.1 EVA conference (Ku + S-band)
13:15-14:15 CDR, FE-1
LUNCH
13:45-14:45 FE-2
14:15-14:55 FE-1 СОЖ Maintenance
14:15-15:15 CDR
Hardware prepack for return on Shuttle flight 13A.1
14:45-17:15 FE-2
14:55-15:20 FE-1 SM and FGB air sampling using АК-1М sampler
15:15-15:30 CDR Activation of Soyuz 220 Gas Analyzer
15:20-15:30 SM air sampling for FREON using АК-1М sampler
FE-1
15:30-15:45 SM air sampling using ИПД samplers
16:00-17:30 CDR Physical Exercise (TVIS) day 2
16:45-17:45 FE-1 Physical Exercise (RED)
17:25-17:35 FE-2 CWC audit
17:30-18:30 CDR Physical Exercise (VELO + RED), Day 2
17:35-17:50 FE-2 Rebooting all PCS (weekly)
17:45-19:15 FE-1 Physical Exercise (TVIS), Day 2
17:50-17:55 SSC file server reboot
17:55-18:00 OCA SSC router reboot
18:00-18:30 FE-2 Evening work prep
18:30-18:45 Grab Sample Container (GSC) ops
18:45-19:15 Evening work prep
19:10-19:15 CDR Transfer of TVIS/RED/CEVIS data to MEC
19:15-19:30 Daily Planning Conference (S-band)
19:30-20:00 DINNER
20:00-20:30 Daily food prep
20:30-21:30 Pre-sleep
21:30-06:00 SLEEP
RS ISS Audit in the current day work area
CDR, FE-1
Task List RS ISS Module Photo/Video
FE-1 PLANTS-1. Payload status check
Note: See OSTP for references to US activities.
End of Radiogram

You might also like