06:00-06:05 SLEEP - data logging FE-2 06:05-06:15 Morning inspection 06:10-06:40 FE-1, CDR Post-sleep 06:15-06:45 FE-2 06:40-07:30 CDR, FE-1 BREAKFAST 06:45-07:35 FE-2 07:30-07:55 FE-1, CDR Prep for Work 07:35-07:45 07:45-07:50 FE-2 DCP power supply connection to Lab and Cupola work stations 07:50-07:55 LAB Window Shutter Closure 07:55-08:10 Daily Planning Conference (S-band) 08:10-11:10 Relocation training. Tagup with specialists (S-band) 11:10-12:10 FE-1 Physical Exercise (TVIS), Day 1 11:10-12:10 FE-2 Physical Exercise (CEVIS) 11:10-11:40 ODF update CDR 12:00-13:30 Physical Exercise (TVIS), Day 1 12:10-12:30 FE-2 CEVIS monthly maintenance 12:25-13:25 FE-1 Soyuz 220 СУД Test #2 (mated stack) prior to relocation 12:30-13:30 FE-2 USOS hatch seal inspection 13:30-14:30 LUNCH 14:30-15:10 FE-1 Filling EDV [KOB] for Elektron using CWC #1068 RELAXATION. Hardware deactivation (when window #9 is closed). Tagup with 14:30-16:00 CDR specialists (S-band) Scheduled maintenance of Compound Specific Analyzer- Combustion 14:30-15:00 FE-2 Products (CSA-CP) 15:00-15:15 Private Medical Conference (Ku + S-band) 15:10-15:50 FE-1 СОЖ Maintenance 15:15-15:30 FE-2 Questionnaire - journal entry 15:50-16:20 FE-1 SSRMS walk-off to survey FGB SA retraction 15:50-16:35 FE-2 16:00-17:00 CDR Physical Exercise (TVIS), Day 1 16:25-16:45 FE-1 IMS Update 16:40-16:45 Scheduled inspection of RED FE-2 16:45-18:15 Physical Exercise (RED) 16:45-18:15 FE-1 Physical Exercise (TVIS), Day 1 17:00-17:15 Private Medical Conference (Ku + S-band) CDR 17:15-18:15 Prep for Work Page 2 of 2
18:15-18:30 Daily Planning Conference (S-band)
18:30-19:00 CDR Daily Food Prep 18:30-19:15 FE-1 Prep for Work Disconnect Express Rack 1 (ER1) from the LAB Internal Thermal Control 18:30-18:35 System (ITCS) at the LAO2 Rack Interface Panel (RIP) FE-2 18:35-18:40 Transfer TVIS/RED/CEVIS/HRM data to MEC 18:40-19:15 Prep for Work RELAXATION. Hardware activation and monitoring Progress 360 orbital 19:00-19:30 CDR maneuvering engine [СКД] 19:15-19:30 FE-2 Crew Discretionary Conference (Ku +S-band) 19:15-19:30 FE-1 Private Medical Conference (Ku + S-band) 19:30-20:00 CDR RELAXATION. Hardware stow 19:30-20:00 FE-1, FE-2 Daily Food Prep 20:00-20:30 DINNER 20:30-21:30 Pre-sleep 21:30-06:00 SLEEP GSF-JAXA. ТБУ temperature monitoring (in the morning) Task List FE-1 PLANTS-1. Payload status check (in the morning) See OSTP for references to US activities.